Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.8 LAdmitted-Finance | -29.12% | ₹7.8 L | L1 | Admitted-Finance |
| 2 | L2₹8.0 L+₹20,225.71 (2.58%)Admitted-Finance 72D 2A 1 ALLAHABAD SHASHI PRAKASH SINGHREKHA SINGH 72D 2A 1 CHANDPUR SALORI 211004 PRAYAGRAJ UTTAR PRADESH 211004 INDIA | PRAYAGRAJ | UTTAR PRADESH | 211004 | -27.29% | ₹8.0 L+₹20,225.71 (2.58%) | L2 | Admitted-Finance |
| 3 | L3₹8.5 L+₹71,397.84 (9.11%)Admitted-Finance | -22.66% | ₹8.5 L+₹71,397.84 (9.11%) | L3 | Admitted-Finance |
Tender Value
₹11.1 L
EMD Value
₹22,105
Closing Date
18 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-08 Ward-06 Kanihar ke antargat Narayan Das Ka Pura me Gass Agency ke saamne Vijay Shankar Ojha ke makan hote hue Poonam Devi aur Dr R K Singh ke makan tak nali aur sadak nirmaan karya.
2026_NNAMC_1152890_3
18.06.2026
Open Tender
Civil Works
Percentage
60 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,300
AS PER DOCS
₹22,105
4 Jul 2026
25 May 2026
18 Jun 2026
25 May 2026
18 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Exavation in Ordinary soil lead lift &30 m lead with aqll complete work (S.I.No.251) | 49.5 | cum | 160 | ₹7,920 |
| 2 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 221.43 | cum | 87.3 | ₹19,330.84 |
| 3 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 13.2 | Cum | 3,500 | ₹46,200 |
| 4 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 53.3 | cum | 1,654.8 | ₹88,200.84 |
| 5 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 39.27 | cum | 5,300 | ₹2,08,131 |
| 6 | Flush pointing (1:2) cement sand mortor including all complete the work (S.I.NO.575) | 35.64 | Sqm | 166 | ₹5,916.24 |
| 7 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 198 | sqm | 197 | ₹39,006 |
| 8 | Providing and Laying of Rubber molded reflective Zig Zag 80mm thick stone grit including all complete work | 673.2 | Cum | 930.3 | ₹6,26,277.96 |
| 9 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 2.43 | Cum | 9,300 | ₹22,599 |
| 10 | M.S iron work including cutting bending and praper laying all complete work (S.I.No.504) | 1.91 | qtl | 6,200 | ₹11,842 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tendernotice_2.pdf
PDF • 1.50 MB
BOQ_2159681.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .