Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC A 8 MISSION COMPOUND SADAR BAZAR DISTRICT SAHARANPUR UTTAR PRADESH | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹15.5 L (9.47%)Rejected-Finance | ₹1.8 Cr+₹15.5 L (9.47%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.8 Cr+₹18.5 L (11.3%)Rejected-Finance CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | ₹1.8 Cr+₹18.5 L (11.3%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.9 Cr+₹22.1 L (13.5%)Rejected-Finance | ₹1.9 Cr+₹22.1 L (13.5%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.0 Cr+₹31.4 L (19.1%)Rejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹2.0 Cr+₹31.4 L (19.1%) | L5 | Rejected-Finance L5 |
Tender Value
₹2.7 Cr
EMD Value
₹5.5 L
Closing Date
8 Jul 2024, 2:00 pmClosed
SE GNSM Meerut
SE Office GNSM Meerut
As per the NIT
2024_UPIDC_934357_1
01/SE/2024-25
Open Tender
Civil Works
Piece-work
180 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹5.5 L
20 Sept 2024
1 Jul 2024
8 Jul 2024
1 Jul 2024
8 Jul 2024
1 Jul 2024
Amount
Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-charge.
Providing and Laying C.C. 1:1.5:3 with Accelerator i/c all cost of material, labour and T&P etc.
Earthwork in filling in all type of soil by imported earth incl. all lift and lead upto 5 km incl. all cost of material, labour and T&P complete.
Providing & Laying filter material including all cost of material, labour and T&P etc.
Centering and shuttering of C.C. work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintels, sun shades, columns & walls etc.
Providing & filling Boulder 20 to 40 Kg in scoured portion of launching apron i/c all cost of material, labour and T&P etc.
Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete.
Providing & Laying dry boulder pitching including all cost of material, labour and T&P etc.
Providing/ Weaving G.I. Wire crate of 8 S.W.G. double knot 150x150mm mesh of size 3.0x1.50x1.00m placing in position and packing boulder in them i/c all cost of material, labour and T&P complete.
Providing & Laying stone masonary in 1:4 cement mortar including all cost of material, labour and T&P etc.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture.
Apply epoxy painting with 01:1/2:2 (1 Kg Aradlite GY 257:1/2 Kg Aradur Hy 140:2 Kg silica) with initial coat of epoxy primer (01:1/2) (1 Kg Araldite GY257: 1/2 Kg Aradur Hy 140) after prepairing & cleaning of surface incl. all cost of material, labour and T&P etc.
Arvind Kumar
M/S AJAY KUMAR
NARENDRA KUMAR
M/S UNITE ENTERPRISES
M/S S R CONSTRUCTION
MAA GAYATRI ASSOCIATES
GOMATINETRA CONSTRUCTIONS
BHAMAR SINGH
MANOJ CHAUDHARY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .