Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,981.91Admitted-Fee/PreQual/Technical/Finance | -0.50% | ₹99,981.91 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.0 L+₹2,512.11 (2.51%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹1.0 L+₹2,512.11 (2.51%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹1.0 L+₹2,512.11 (2.51%)Admitted-Fee/PreQual/Technical/Finance | +2.00% | ₹1.0 L+₹2,512.11 (2.51%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
23 Jul 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW DIVISION REASI
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of Protection Wall Mohd Iqbal S o Bashir Ahmed Mohalla Ward No 1 in Panchayat Shadole Block Gulabgarh under Capex PRI for the year 2026-27
2026_RDPR_316225_14
e-NIT No. 45 of REW REASI of 2026-27
Open Tender
Civil Works
Percentage
90 days
Reasi
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹2,000
31 Jul 2026
16 Jul 2026
24 Jul 2026
16 Jul 2026
23 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including disposal of surplus excavated earth as directed, within a lead of 25 metres: All kinds of soil including all leads | 3.82 | Cum | 586.95 | ₹2,242.15 |
| 2 | Providing and laying horizontal stone solling | 0.64 | cum | 1,500 | ₹960 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) Nallah Stone including all leads, lift and carriage complete | 7.23 | Cum | 5,402.9 | ₹39,062.97 |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone including all leads, lift and carriage complete | 9.97 | sqm | 2,793.8 | ₹27,854.19 |
| 5 | Construction of CIB (includes concrete Pedestrial/Brick 3*2, Plastering,Painting complete job as per direction of Engineer in charge | 1 | No. | 3,000 | ₹3,000 |
| 6 | Carriage of cement from an avg. distance of 30 K.M by MT & 2000 M by AT | 0.6 | MT | 1,697.93 | ₹1,018.76 |
| 7 | Carriage of Stone aggregate & sand from an avg. distance of 30 K.M by MT & 2000 Meter by AT | 3.25 | Cum | 3,409.12 | ₹11,079.64 |
| 8 | Carriage of stone from an avg. distance of 00 K.M by MT & 100 Meter by AT | 15.06 | Cum | 1,007.08 | ₹15,166.62 |
stage.html
html • 0.02 MB
finance_1031379.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_1031379.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .