Loading…
Loading…
Tender Value
₹8.5 Cr
EMD Value
₹5.7 L
Closing Date
7 Apr 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
TENDER
17 conditions · 4 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover The tenderers shall submit requisite information as per Annexure-VIB of GCC (along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Regarding average annual contractual turnover, The tenderers shall submit Annexure-VIB of GCC as per proforma available in GCC/Tender Document Part A to C.
Note: Client certificate from other than Govt Organization should be duly supported by Form 16A/26AS generated through TRACES of Income Tax Department of India
The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-XVII for the works costing more than Rs.20.00 crores as per special conditions of tender document part A to C.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Any Civil Engineering work involving fabrication and erection of steel structures.
60 conditions · 7 needing a document upload
All bidders are hereby informed that for the purpose of submission of Bank Guarantees in connection with Earnest Money/Bid Security, Performance Guarantee/Security, Bank Guarantees towards Advances, Security deposits, etc. shall be accepted from all Scheduled Commercial Bank of India as mentioned in the Tender Document, except those issued by Indian Overseas Bank. The Bids/offers accompanied with Bank Guarantees issued by Indian Overseas Bank shall be summarily rejected.
(i) A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. (ii) The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids) (iii) Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid.
The tenderers shall submit a copy of certificate stating that all their statements/documents submitted along with bid are true and factual. Standard format of certificate to be submitted by the bidder is enclosed as Annexure-XIIA or VA of GCC. Non submission of above certificate by the bidder shall result in summarily rejection of his /their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested by which they/he is qualifying the Qualifying criteria mentioned in the Tender Document.
The accepted rates should be deemed to include all taxes direct or indirect including Income Tax leviable under Central/State or Local Bodies Act or Rules.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Annexure-III Constitution of the Firm with required document copies i.e., Joint Venture / Partnership Deed(s), Incorporation of Company etc.,
If the date of opening of tender is declared a holiday at a later date, the tenders will be opened on the next working day
Tenderers shall hold the offer open for acceptance for a minimum period of 60 days from the date of opening of the tender
GST: It may please be noted that the supplier of Goods and/or services for the said tender/agreement, would be subject to GST Act and rules as applicable from time to time.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in clause-37 of the IRSGCC for the completion of works to the entire satisfaction of the Engineer.
The option of payment through Letter of Credit has been enabled for all tenders whose value is equal to or greater than Rs.10 Lacs. Necessary instructions/conditions are incorporated as condition No.67 in the tender document part A to C.
Tenderers must upload details of all works on hand with them in Railways, other public sector undertakings and private sector undertakings in the proforma (ANNEXURE-IV) while submitting their offers.
All terms and conditions in the tender documents are binding on the tenderers. Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED.
The tenderers are advised to visit the site of work in their own interest and acquaint themselves with the site conditions and expected quantum of work. Tenderer should refer for Special Conditions General & Technical, which are attached to the tender document in Documents attached to the tender. These special conditions form part of the tender document and will supplement to the conditions of tender already submitted by the tenderer, IRSGCC along with updated correction slips, IRUSSR. Where are provisions of these special conditions are at variance with IRSGCC and other documents mentioned above, these Special Conditions shall prevail.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderer s may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderers shall have no claims on this account
All documents in support of fulfillment of eligibility criteria should be uploaded along with the tender. Tenders without documentary evidence in support of eligibility criteria will be summarily rejected. No post tender correspondence will be permitted and the tender shall be decided based on the documents submitted/attached with the offer only. However Railway reserves the right to verify/seek for any clarification on the documents/credentials already submitted by the tenderer along with the offer.
Contractor shall at all times keep the railway administration indemnified against all penalties that may be imposed by the Govt. of India or State Govt. for infringements or any of the clauses of the mines act and rules made there under in respect of quarries from which the ballast for these works is procured.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
IF THE TENDERER/S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATES CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES,BANNING OF BUSINESS FOR TWO YEARS ON ENTIRE IR.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
Contact Person's: Dy.CE/CN/SA Mob. No. 9003145229 & Dy.CE/CN/Works/MS Mob. No.9003145207
Beneficiary details: President of India acting through The FINANCIAL ADVISOR AND CHIEF ACCOUNTS OFFICER, CONSTRUCTION, SOUTHERN RAILWAY, CHENNAI-600 008
Contract Signing Authority: President of India acting through The DEPUTY CHIEF ENGINEER (CONSTRUCTION), SOUTHERN RAILWAY, SALEM
All bidders are hereby informed that for the purpose of submission of Bank Guarantees in connection with Earnest Money/Bid Security, Performance Guarantee/Security, Bank Guarantees towards Advances, Security deposits, etc. shall be accepted from all Scheduled Commercial Bank of India as mentioned in the Tender Document, except those issued by Indian Overseas Bank. The Bids/offers accompanied with Bank Guarantees issued by Indian Overseas Bank shall be summarily rejected.
Creation of Trip maintenance/Advance inspection centre at Podanur - proposed Construction of Trip shed of size 65mx16m with Service building of size 48mx5.50m , Reconstruction of Kalayanamandapam and track work .
44-CECNMS-E-635744
44-CECNMS-E-635744
Open
Works - General
16 Months
Chennai, Tamil Nadu
₹0
₹5.7 L
7 Apr 2026
11 Mar 2026
24 Mar 2026
233 items across 7 schedules · ₹8,47,58,284.69 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as RDSO Specification No. RDSO/2020/GE: IRS- 0004 with latest updated correction slips and to the satisfaction of the Engineer-in- Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall dumped / stacked away from toe embankment. (ii) All hard rock /and boulders not fit for filling will be stacked the contractor and will be property of Railways. (iii)Cut trees shall be property Railways and to be deposited in the railway godown unless specified otherwise in Conditions of Contract. | of of & per be of by the of the | — | — | — | |
| 1 | In all conditions and classifications of except rock | soil cum | 9000.00 | 106.09 | 9,54,810 |
| 2 | Soft rock not requiring blasting | cum | 14500.00 | 252.12 | 36,55,740 |
| 3 | In hard rock requiring blasting | cum | 6000.00 | 379.62 | 22,77,720 |
| Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out execution of the work and shall be removed in workman like manner on completion the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall made on provision of barricading at work- site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property the Contractor. | & the of be of | — | — | — | |
| 4 | With 3 horizontal bamboo / balli members of minimum 50mm dia. spaced equally | RM | 500.00 | 179.41 | 89,705 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | by | — | — | — | |
| 5 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 100.00 | 867.49 | 86,749 |
| Schedule total | ₹70,64,724 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Scopekalyanamandapam.pdf
ATTACHMENT
Ballast Specifications
ATTACHMENT
weldingconditions-Latest.pdf
ATTACHMENT
EWaftercorrigendum-latest.pdf
ATTACHMENT
ListofLaboratories.pdf
ATTACHMENT
GCC-APRIL-2022.pdf
ATTACHMENT
SINGLEPACKETTD.pdf
ATTACHMENT
Contractore-mBook.pdf
ATTACHMENT
GCC Clarification
ATTACHMENT
Ballastconditions-NABLadded-RTLSERCdeleted-latestason2.11.23.pdf
ATTACHMENT
2024_05_14ClarificationonsubmissionofAnnexure-V.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .