Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance WZ 120 BUDHELLA VILLAGE VIKASH PURI WEST DELHI WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | L1 | Admitted-Finance | |
| 2 | L2₹3.5 L+₹5,369 (1.58%)Admitted-Finance B 225 FATEH NAGAR WEST DELHI WEST DELHI WEST DELHI DELHI 110018 | WEST DELHI | DELHI | 110018 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Due to not full fill the NIT conditions |
| Sl No | Description | Qty | Unit | M/S.SUPER TRADERS & ENGINEERS L2 | M/S ARYAN TRADERS AND ENGINEERS L1 |
|---|---|---|---|---|---|
| 1.01 | Repair/Renovation of M.S foundation for pump sets by disconnection of all electric connection decoupled the 25 HP pump from suction and delivery line after cutting of all rusted nut bolts by the help of gas cutter at B P Station | 2 | Jobs | 20,200 ₹23,836 | 19,800 ₹23,364 Lowest |
| 1.02 | Dismantling of pump set with the M.S Base frame by cutting of all rusted nut bolts of base frame an take out the pump and motor and placing the safe place at ground as per site requirement with the help of chain pulley block/heavy labour | 2 | Jobs | 30,200 ₹35,636 | 29,750 ₹35,105 Lowest |
| 1.03 | Supply of nut bolts as per site requirement. | 80 | kg | 8,000 ₹9,440 | 7,360 ₹8,684.8 Lowest |
| 1.04 | Supply of neoprene rubber packing sheet 50% synthetic. | 90 | kg | 22,140 ₹26,125.2 | 21,780 ₹25,700.4 Lowest |
| 1.05 | Recasting the existing RCC foundation with steel bar and cement concrete. The job includes grouting the foundation bolts of 500 mm long and 30 mm dia. made out of SS410 etc. | 2 | Jobs | 25,200 ₹29,736 | 24,800 ₹29,264 Lowest |
| 1.06 | Fabrication of new M.S base frame of size long 125” and width 40” by using of M.S. channel 100x50 mm job includes welding, cutting, grinding of edges etc. | 2 | Jobs | 90,200 ₹1,06,436 | 89,500 ₹1,05,610 Lowest |
| 1.07 | Fixing of base frame at proper level of the RCC foundation with grouted nut bolts as per site requirement. | 2 | Jobs | 30,200 ₹35,636 | 29,800 ₹35,164 Lowest |
| 1.08 | Re fixing of pump & motor with alignment on the new fabricated base frame and reassembling with delivery and suction line by using of nut bolts and neoprene rubber packing. | 2 | Jobs | 50,200 ₹59,236 | 49,600 ₹58,528 Lowest |
| 1.09 | Transport charges of tools & tackles to &fro repairing of foundation executed one by one | 2 | Jobs | 10,200 ₹12,036 | 9,900 ₹11,682 Lowest |
| 1.10 | Testing & commissioning of pump set on full load for checking leakage | 2 | Jobs | 6,200 ₹7,316 | 5,900 ₹6,962 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,900
Closing Date
19 Jun 2025, 12:00 pmClosed
Executive Engineer (EM) M-I
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Repairing of foundation of pump sets No. 1 and 2 at B-Block Vivek Vihar BP Station.
2025_DJB_273830_2
NIT No-03 EE (EM) M-I/ (25-26)
Open Tender
Electrical Works
Works
30 days
Chitra Vihar BP Station Laxmi Nagar Delhi
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
₹6,900
19 Aug 2025
13 Jun 2025
19 Jun 2025
13 Jun 2025
19 Jun 2025
13 Jun 2025
Repair/Renovation of M.S foundation for pump sets by disconnection of all electric connection decoupled the 25 HP pump from suction and delivery line after cutting of all rusted nut bolts by the help of gas cutter at B P Station
Dismantling of pump set with the M.S Base frame by cutting of all rusted nut bolts of base frame an take out the pump and motor and placing the safe place at ground as per site requirement with the help of chain pulley block/heavy labour
Supply of nut bolts as per site requirement.
Supply of neoprene rubber packing sheet 50% synthetic.
Recasting the existing RCC foundation with steel bar and cement concrete. The job includes grouting the foundation bolts of 500 mm long and 30 mm dia. made out of SS410 etc.
Fabrication of new M.S base frame of size long 125” and width 40” by using of M.S. channel 100x50 mm job includes welding, cutting, grinding of edges etc.
Fixing of base frame at proper level of the RCC foundation with grouted nut bolts as per site requirement.
Re fixing of pump & motor with alignment on the new fabricated base frame and reassembling with delivery and suction line by using of nut bolts and neoprene rubber packing.
Transport charges of tools & tackles to &fro repairing of foundation executed one by one
Testing & commissioning of pump set on full load for checking leakage
M/S.SUPER TRADERS & ENGINEERS (BID ID -1591904)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .