| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.1 CrAccepted-AOC | L1 | Accepted-AOC AWARD OF CONTRACT | |
| 2 | L2₹39.3 Cr+₹70.5 L (1.83%)Rejected-Finance E 30 2ND FLOOR 2ND AVENUE BESANT NAGAR CHENNAI 600 090 | CHENNAI | TAMIL NADU | 600090 | L2 | Rejected-Finance Highest Bidder | |
| 3 | L3₹40.3 Cr+₹1.7 Cr (4.51%)Rejected-Finance 11 RAMASAMY COLONY NORTH THALLAKULAM MADURAI 625002 | MADURAI | TAMIL NADU | 625002 | L3 | Rejected-Finance Highest Bidder |
Tender Value
₹35.1 Cr
EMD Value
₹17.6 L
Closing Date
19 Dec 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
No.B48, Alagesan nagar, Chengalpattu
Formation of Bypass to Thirupathur Town (Phase - I) Km 0/0 - 5/225
2024_HWAY_499207_1
TN.No.18 / SI.No.01 / 2024-2025 / SDO
Open Tender
Civil Works - Roads
Percentage
635 days
Thirupathur
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹17.6 L
2 Jan 2026
19 Nov 2024
20 Dec 2024
19 Nov 2024
19 Dec 2024
19 Nov 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing heavy jungle by cutting, removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees upto 150mm girth as per clause No.201 of MORT&H Vth rev. | 94,050 | Square meter | 8.58 | ₹8,06,949 |
| 2 | Providing and laying carted earth of CBR 8 for construction of sub grade and side berms in accordance with specification and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Earth with a leadof 13 Km for the formation of road for 95% Compaction MORT&H No.305 | 90,729 | Cubic Meter | 447.07 | ₹4,05,62,214.03 |
| 3 | Providing and laying carted earth for construction of sub grade and side berms in accordance with specification and the lines, grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Earth with a leadof 13 Km for the formation of road for 97% Compaction MORT&H No.305 | 52,342 | Cubic Meter | 496.79 | ₹2,60,02,982.18 |
| 4 | Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for cutting as per MORT&H Vth specification No.301,111,112 | 23,096 | Cubic Meter | 123.26 | ₹28,46,812.96 |
| 5 | Construction of Granular sub-base Grade-V 180mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Specification Number as per MORTH Rev.V 111,112,401,900). | 7,510 | Cubic Meter | 1,660.43 | ₹1,24,69,829.3 |
| 6 | Construction of Granular sub-base Grade-III 100mm thick by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (Specification Number as per MORTH Rev.V 111,112,401,900). | 2,956 | Cubic Meter | 1,749.4 | ₹51,71,226.4 |
| 7 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm. thick in two layers of 125mm each thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to the site, laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 111,112,406,900 of MORTH Rev-5 for formation of Bypass Road | 6,750 | Cubic Meter | 2,132.56 | ₹1,43,94,780 |
| 8 | Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen(SS1) per 10sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111,112,502,900 of MORTH Rev-5 for formation of Bypass Road | 25,591 | Square meter | 81.47 | ₹20,84,898.77 |
| 9 | Providing and laying Tack Coat over WBM/WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion(RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as per Clause 111,112,503,900 of MORTH Rev-5 for formation of Bypass Road | 25,591 | Square meter | 18.77 | ₹4,80,343.07 |
| 10 | Providing and laying 100 mm consolidated thick Dense Bituminous Macadam using 0.24 cum. Of 26.50-13.20mm, 0.25 cum. Of 13.20-2.36 mm and 0.23 cum. Of 2.36 mm & below and with 53.20 kgs. Of VG 40 bitumen for premixing per 10 sqm. Including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, vibratory / pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 111, 112, 505, 900 MORTH Rev-5. | 2,557 | Cubic Meter | 9,554.2 | ₹2,44,30,089.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_593366.xls
BOQ • 0.51 MB
156690371.pdf
Tender Documents • 0.77 MB
156690374.html
Tender Documents • 0.08 MB
VOL.1.pdf
Tender Documents • 1.03 MB
VOl.II.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .