Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | -14.99% | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L1₹3.8 CrAdmitted-Finance | -14.99% | ₹3.8 Cr | L1 | Admitted-Finance |
| 3 | L1₹3.8 CrAdmitted-Finance AT KHARIAR PO KHARLAR DIST NUAPADA | -14.99% | ₹3.8 Cr | L1 | Admitted-Finance |
| 4 | L1₹3.8 CrAdmitted-Finance | -14.99% | ₹3.8 Cr | L1 | Admitted-Finance |
| 5 | L1₹3.8 CrAdmitted-Finance AT LATHOR PS HARISHANKAR DIST BALANGIR | LATHOR | BALANGIR | ODISHA | -14.99% | ₹3.8 Cr | L1 | Admitted-Finance |
Tender Value
₹4.5 Cr
EMD Value
₹4.5 L
Closing Date
5 May 2026, 5:00 pmClosed
Chief Construction Engineer
O/o the CCE RW Circle, Bhawanipatna
Bakharmal to Jhitiki
2026_CERWI_127343_60
BPT/Online-15/ 2025-26
National Competitive Bid
Civil Works - Roads
270 days
NUAPADA/NUAPADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹4.5 L
Yes
2 Jul 2026
18 Mar 2026
6 May 2026
18 Mar 2026
5 May 2026
18 Mar 2026
18 Mar 2026 - 4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other sturcture comprising of masonry, cement concrete wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m as per Technical Specification Clause 202 | 24 | Cum | 858.58 | ₹20,605.92 |
| 2 | Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc complete. | 13,365 | Sqm | 2.24 | ₹29,937.6 |
| 3Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MOSRT&H specifications for Road & Bridges work (4th Revision). | |||||
| 3.1 | With mechanical lead upto 1000m | 12,383.5 | Cum | 201 | ₹24,89,083.5 |
| 4 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 153 | Cum | 74.79 | ₹11,442.87 |
| 5 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site). | 977.54 | Cum | 50.4 | ₹49,268.02 |
| 6 | Fine dressing and turfing including transportation by mechanical means with all lead and lift and placing of turf in position and ramming with thapies and including watering and cost of all labour, materials etc. complete as per Clause 309 of MORD Specification and as per direction of the Engineer in Charge. | 13,184.68 | Sqm | 28.93 | ₹3,81,432.79 |
| 7 | Construction of granular Sub base by providing close grade granular sub-base grading-III material as per table-100-1. spreading in uniform layers with motor grader om prepared surface,mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MOSRT&H specifications for road and Bridges work. | 2,835.54 | Cum | 2,287.87 | ₹64,87,346.9 |
| 8 | Supplying & filling moorum of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 668.25 | Cum | 534.91 | ₹3,57,453.61 |
| 9 | Providin, laying, spreading & compacting graded stone aggregate to to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoSRT & H specifications for road & bridge works.(4th Revision) | 1,761.42 | Cum | 2,726.29 | ₹48,02,141.73 |
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.74 MB
Tendernotice_2.pdf
PDF • 4.94 MB
Tendernotice_3.pdf
PDF • 1.82 MB
BOQ_585542.xls
BOQ • 0.40 MB
783.pdf
PDF • 0.28 MB
758.pdf
PDF • 0.27 MB
701-.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid