Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -26.11% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 L+₹30,127.86 (13.7%)Admitted-Finance | -16.00% | ₹2.5 L+₹30,127.86 (13.7%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹43,478.28 (19.7%)Admitted-Finance | -11.52% | ₹2.6 L+₹43,478.28 (19.7%) | L3 | Admitted-Finance |
| 4 | L4₹2.9 L+₹70,894.34 (32.2%)Admitted-Finance | -2.32% | ₹2.9 L+₹70,894.34 (32.2%) | L4 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹5,960
Closing Date
30 Jul 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_316322_5
e-NIT 14 of REW Poonch 2026-27 Date 16-07-2026
Open Tender
Civil Works
Percentage
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹5,960
18 Aug 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | - | sqm | 90.75 | - |
| 2 | Consolidation of subgrade with power road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the subgrade. | 960 | sqm | 2.8 | ₹2,688 |
| 3 | Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm | - | cum | 1,204.15 | - |
| 4 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and
compacting to the required density. | - | cum | 768.15 | - |
| 5 | Supplying and stacking at site Good earth | 1 | cum | 281.3 | ₹281.02 |
| 6 | Carriage of Stone/Agg. by 16 KM by MT | - | cum | 388.72 | - |
| 7 | Add the Cost of CIB | 1 | No | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_1031016.xls
BOQ • 0.32 MB
Extentionofdate14to16NIT.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .