Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 10 PURBACHAL DURGAPUR WEST BENGAL PIN 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | Admitted-Finance |
| 2 | Admitted-Finance SBSTC GARAGE MORE DURGAPUR WEST BENGAL PIN 713201 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713201 | Admitted-Finance |
| 3 | Admitted-Finance MAMC DVC MORE B 2 BATTALA V K NAGAR DURGAPUR WEST BENGAL PIN 713210 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713210 | Admitted-Finance |
| 4 | Rejected-Technical 201 SECOND FLOOR PLOT NO 4 GUPTA ARCADE LSC SHRESTHA VIHAR DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | Rejected-Technical EMD not received |
Tender Value
Refer Docs
EMD Value
₹18,500
Closing Date
10 Apr 2021, 12:00 pmClosed
The GM O and M PP
Office of the GM O and M PP
REPLACEMENT OF EXISTING CONVENTIONAL LIGHT FITTING BY LED FITTING and AUGMENTATION OF LIGHTING CIRCUIT AT U 7 and 8
2021_DPL_330308_1
WBDPL/PP/T/GM(PP) 49/2021/E/169
Open Tender
Miscellaneous Works
Item Rate
365 days
Office of the GM O and M PP
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹18,500
Office of the GM O and M PP
21 May 2021
25 Mar 2021
16 Apr 2021
25 Mar 2021
10 Apr 2021
31 Mar 2021
30 Mar 2021
Amount
PART –A: REPLACEMENT OF EXISTING CONVENTIONAL LIGHT FITTING BY LED FITTING & AUGMENTATION OF LIGHTING CIRCUIT AT U#7 & U#8 BOILER AREA
Fixing of LED light in place of conventional light point at Boiler & Mill area of unit #8 & Boiler, Coal feeder of U#7, DPPS, DPL. Total number of Led lights to be installed is 845 number for U#7 & U#8 (Pendent type LED light of wattage of 40 W & 60 W). LED light fitting will be supplied by DPL. Necessary modification of existing light bracket for fixing of pendent type LED well glass light is in the scope of contractor.
Disconnection & dismantling of all existing old conventional fitting from U#8 Boiler & Mill area & U#7 Boiler Area & coal feeder and storing the same with transportation as per direction of EIC. Total numbers of existing conventional fittings to be dismantled is 1045 numbers for U#8 and 1100 numbers for U#7
Repairing & rectification of J.B. (300 numbers) in Boiler & Mill area of U#8 with supply of connector, screw, J.B. cover, gasket as per requirement.
Fault detection and rectification by Distribution wiring in 1.1 KV single core stranded ‘FR’ PVC insulated & unsheathed copper wire (2.5 sq.mm & 4 sq.mm) in 20 mm GI conduit for replacement of damaged conduit wiring in Boiler area. Wire will be supplied by DPL. a) 2x2.5 sq.mm + 1x 1.5 sq.mm
Fault detection and rectification by Distribution wiring in 1.1 KV single core stranded ‘FR’ PVC insulated & unsheathed copper wire (2.5 sq.mm & 4 sq.mm) in 20 mm GI conduit for replacement of damaged conduit wiring in Boiler area. Wire will be supplied by DPL. b) 2x 4sq.mm + 1x 2.5 sq.mm
PART –B: OF REPLACEMENT OF EXISTING CONVENTIONAL LIGHT FITTING BY LED FITTING & AUGMENTATION OF LIGHTING CIRCUIT AT DIFFERENT AREAS OF UNIT 7 & 8 (Compressor house , DG, Battery room, TG Building and flame proof LED fittings at DG room battery room H2 charging station and MOT area)
Fixing of LED light in place of conventional light point at DIFFERENT AREAS OF UNIT 7 & 8 (Compressor house , DG, Battery room, TG Building and flame proof LED fittings at DG room battery room H2 charging station and MOT area). LED light fitting will be supplied by DPL. Necessary modification of existing light bracket for fixing of pendent type LED well glass light is in the scope of contractor.
Disconnection & dismantling of all existing old conventional fitting from DIFFERENT AREAS OF UNIT 7 & 8 (Compressor house , DG, Battery room, TG Building and flame proof LED fittings at DG room battery room H2 charging station and MOT area) and storing the same with transportation as per direction of EIC. Total numbers of existing conventional fittings to be dismantled is 1610 numbers for U#7 and U#8
Repairing & rectification of J.B. (100 numbers) in U#7 & U#8 with supply of connector, screw, J.B. cover, gasket as per requirement.
Fault detection and rectification by Distribution wiring in 1.1 KV single core stranded ‘FR’ PVC insulated & unsheathed copper wire (2.5 sq.mm & 4 sq.mm) in 20 mm GI conduit for replacement of damaged conduit wiring in U#7 & U#8. Wire will be supplied by DPL. a) 2x2.5 sq.mm + 1x 1.5 sq.mm
Fault detection and rectification by Distribution wiring in 1.1 KV single core stranded ‘FR’ PVC insulated & unsheathed copper wire (2.5 sq.mm & 4 sq.mm) in 20 mm GI conduit for replacement of damaged conduit wiring in U#7 & U#8. Wire will be supplied by DPL. b) 2x 4sq.mm + 1x 2.5 sq.mm
M/S SINGH ELECTRICAL
LALIN SINGH CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .