Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | Nominate b₹43.3 LAccepted-AOC SCHINDLER HOUSE MAIN STREET HIRANANDANI GARDENS POWAI MUMBAI 400076 MAHARASHTRA INDIA | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400076 | Nominate b | Accepted-AOC Nominated bidder |
Tender Value
₹43.3 L
EMD Value
₹86,640
Closing Date
22 Nov 2022, 3:00 pmClosed
Chief Engineer (GSS)
3rd Floor, North Wing, DCSEM, DAE, V.S. Bhavan, Anushaktinagar, Mumbai-400094
Biennial comprehensive maintenance of M/s Schindler make elevators of V.S. Bhavan at Anushaktinagar and Atomica in City Building, Mumbai
2022_DCSEM_721579_1
DCSEM/CQD/QSC/GSS/22-23/NIT-33
Single
Electrical Works
Item Rate
730 days
Anushaktinagar and Atomica in City Building Mumbai
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹86,640
29 Nov 2022
4 Nov 2022
23 Nov 2022
4 Nov 2022
22 Nov 2022
5 Nov 2022
4 Nov 2022 - 10 Nov 2022
Amount
Comprehensive maintenance of Schindler make elevator viz. VVVF controlled lifts installed at below mentioned buildings in Mumbai as per relevant Indian / International manufacturer’s standards of maintenance as applicable and as per specification enclosed as directed by Engineer-in-charge. NOTE:- (i) Report for the above shall be submitted to EIC & correction if any shall be made for safe operation of the lifts. (ii) Scope of work includes comprehensive maintenance of all equipments of lifts, AC unit system,CC camera system .(iii) In case of misuse / damage, payment for the replacement of the same will be made separately.
6 Passenger elevator (G+3 upper floors) at Atomica building
20 passenger elevator (S+G+12 upper floor) at V.S.Bhavan building,Anushaktinagar Equip. No. (Lift-A-20070213, Lift-B-20070214, Lift-C-20070223, Lift-D-20070221, Lift-E-20070219, Lift-F-20070222, Lift-G-20070211, Lift-H-20070194) including CC camera system & AC units system (w.e.f. 01.09.2023 to 30.11.2024)
Periodic testing of safety related features of elevator witnessed by DCSEM staff preparation of test reports counter signed by agency &DCSEM staff.
Testing of overload indication, alarm and trip system, strain gauges &/ overload limiting feature etc.& brake slippage at full load dead weight & its necessary adjustment for safe use of elevator all as per instruction of Engineer in charge. NOTE:- Testing shall be carried out on 1st, 7th, 13th & 18th months of the contract. The bill for 1st, 3rd, 5th and 7th quarter of maintenance contract will be made only after conducting the tests & submission of the test reports duly signed by agency & DCS&EM staff.
Comprehensive maintenance of ARD batteries of elevator.
Comprehensive maintenance of ARD batteries of Atomica. elevator.(w.e.f. 01.12.2022 to 30.08.2023)
Comprehensive maintenance of ARD batteries of 09 nos. elevator.(w.e.f. 01.09.2023 to 30.11.2024)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .