Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.7 L
EMD Value
₹7,326
Closing Date
26 Feb 2024, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superindenting Engineer, MMG, IGCAR
Room No. 200, MDL Building, MMG, IGCAR, Kalpakkam - 603102, Chengalpattu Dist., Tamil Nadu.
Repair and maintenance of various accessories of ventilation equipments in PIED/RML, IGCAR.
2024_IGCAR_789988_1
IGC/TS/MISC/2023/13800
Open Tender
Metal Fabrication
Works
90 days
RML Building
2 documents required · 2 mandatory
₹0
₹7,326
Yes
29 Feb 2024
18 Jan 2024
29 Feb 2024
19 Jan 2024
26 Feb 2024
29 Jan 2024
22 Jan 2024 - 25 Jan 2024
Amount
Replacement of stainless steel strainer using perforated steel sheets for chilled water main inlet of booster pumps.Work includes dismantling of damaged stainer, site fabrication of inlet and outlet spools with flanges connected to the strainers , gas cutting, welding, to the required shape, assembling, testing,nitrile rubber insulation and installation of two numbers of similar type of stainless steel strainer at plant room of RML plant room.
Dismantling of two sets of damaged frames including motor and fan blades, fabrication of new frames, galvanization and installation of two sets of new frames at the same location of cooling towers using channel ISMC 100 x 50 x 6mm and ms plate as per specifications
Replacement of carbon steel pipe size of 150NB Sch40(6 inch) in the 115TR &135TR water chiller main headers and replacement of carbon steel pipe size of 75NB Sch40(3 inch) in the 24TR brine chillers as per suitable site requirement. Work includes both inlet and outlet line fabricated to connect the condenser inlet and out let flanges, gas cutting to the required shape,fabrication,welding at site, assembling, and testing. All the pipe lines after completing the fabrication and erection shall be painted with one coat of red oxide paint and two coats of green enamel paint.
Replacement of condenser water pipes for cooling tower no.1 & 2 Site fabrication of MS pipes to suite site condition which includes edge preparation,fit up,welding, 100% DPT on both root and final welding. Work involves remove the damaged portion of inlet and outlet headers connected in the main pipe line and replace the same size of pipes inplace of damaged portions.
Shifting and installation of new PSA nitrogen generator plant at new constructed area in the phase -II of RML.
Arrangement of scaffolding with necessary materials,skilled manpower and safety wears to do the painting of 10 meter elevation at ten different locations between Ph-I & RML building.
SRI DHAKSHINAMOORTHY FABRICATORS
POWER TECH
stage.html
html • 0.02 MB
finance_830361.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .