| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.5 LAccepted-AOC SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹80.1 L+₹20.4 L (34.1%)Rejected-Finance MATHOSHREE PLOT NO 55 SR NO 787 A BEHIND ASHWANI HOSPITAL GOVIND NAGAR NASIK 422 009 | NASIK | NASHIK | MAHARASHTRA | 422009 | L2 | Rejected-Finance Higher Bidder | |
| 3 | L3₹84.7 L+₹24.9 L (41.7%)Rejected-Finance | L3 | Rejected-Finance Higher Bidder | |
| 4 | L4₹90.7 L+₹30.9 L (51.8%)Rejected-Finance NH 17 MAIN ROAD BINAGA BAZAR KARWAR 581307 | KARWAR | UTTARA KANNADA | KARNATAKA | 581307 | L4 | Rejected-Finance Higher Bidder | |
| 5 | L5₹94.7 L+₹34.9 L (58.5%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L5 | Rejected-Finance Higher Bidder |
Tender Value
₹94.5 L
EMD Value
₹1.7 L
Closing Date
17 Jan 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SH A K SINGH SE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
MANNING AND OPERATION INCLUDING REPAIR MAINTENANCE OF 10 MW CAPACITY CAPTIVE POWER PLANT CPP AT NAVAL BASE KARWAR UNDER GE SB KARWAR
2022_MES_568862_1
85634/E8
Open Tender
Civil Works
Item Rate
335 days
CWE NAVY VASCO
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹1,000
Yes
GE (SB) KARAWR
₹1.7 L
Yes
4 Mar 2023
13 Dec 2022
19 Jan 2023
13 Dec 2022
17 Jan 2023
3 Jan 2023
Amount
SCHEDULE 'A' - PART I (M&O OF 10.00 MW CPP)
Manning & Operation of 10.0 MW (4 X 2.5 MW) capacity 11 KV Captive Power Plant (CPP) installed at NSRY complex round the clock in three shifts (for three 0600 hrs to 1400 hrs, 1400 to 2200 hrs and 2200 hrs to 0600 hrs) for all days in a week including weekly, monthly, quaterly routine checks complete all as specified in maintenance manual & or directed by Engr in charge. The installation comprise of the following equipments :-
a) D.G Set of capacity 2500 KW 11KV with compressed air starting system comprising of structural chimmney exhaust silencer assembly, air filter system, plate type heat exchanger, batteries with charger, AMF Panel & complete accessories -04 Sets
Engine Make :- KOEL, Type 9 PA 61 - 280 With rated BHP 3600
Alternator Make :- BHEL Frame G62592 of Capacity 3125 KVA
b) DG Set of capacity 62.5 KVA 415 Volts with exhaust silencer assembly batteries with charger AMF panel & complete accessories - 01 No
Engine Make :- Greaves Type 3YDC MK - III
Alternator Make :- STMPFORD Type UC 22 G of Capacity 62.5 KVA
c) Lube Oil priming pump Make :- Crompton Greaves 5.5 KW / 7.5 HP 3 Phase 1440 RPM -03 No
d) Lube Oil priming pump Make :- Prime 5.5 KW / 7.5 HP 3 Phase 1440 RPM - 01 No
e) HT water pump (Pre heating module) Make :- Kirloskar Brothers Ltd 2.2 KW / 3 HP 3 Phase 2840 RPM - 04 Nos
f) LT Water pump Make :- Kirloskar Brother Ltd 7.5 KW / 10 HP 3 phase 2900 RPM - 04 Nos
g) Cooling tower fan motor Make :- Laxmi hydraulics Pvt. Ltd. 5.5 KW / 7.5 HP 3 Phase 720 RPM with cooling tower - 04 Nos
h) Air compressor with electric motor Make :- Bharat bijalee Ltd. 9.3 KW / 12.5 HP 3 Phase 1450 RPM - 01 No
j) Drip tank with transfer pump Make : Bharat Bijlee Ltd. 1.1 KW / 1.5 HP 3 Phase 1415 RPM with tank - 01 No
k) Chemical mixing pump Make :- Kirloskar brothers Ltd. 2.2 KW / 3 HP 3 Phase 2840 RPM with tank - 01 No
L) Fuel Oil centrifuge pump Make :- Crompton Greaves Ltd 3 KW / 4 HP 3 Phase 2865 RPM - 02 Nos
m) Seperator feed pump Make :- Crompton greaves Ltd 0.37 KW / 0.5 HP 3 Phase 2820 RPM -01 No.
n) Fuel unloading pump Make :- Bharat bijaiee Ltd. 3.7 KW / 5 HP 3 Phase 1430 RPM with strainer -02 Nos
o) Fuel transfer pump Make :- Bharat bijalee Ltd, 1.1 KW / 1.5 HP 3 Phase 1415 RPM with tank -02 Nos
p) Raw Water pump Make :- Kirloskar brothers Ltd. 3.7 KW / 5 HP 3 Phase 2870 RPM with water softening plant & storage tanks - 02 Nos
q) Axial flow fan motor Make :- Crompton Graves Ltd. 7.5 KW / 10 HP 3 Phase 1430 RPM - 06 Nos
r) Generator control panel with measuring instruments control relays & switch gears - 04 Nos
s) AVR Exciting panel for D.G sets - 04 Nos
t) D.G Set synchronising panel with auto / manual synchronising with metering & protection devices -01 No
u) Storage tanks : Vertical Fuel storage tank - 60 KL capacity each - 02 Nos, day tank 600 ltrs capacity each - 04 Nos, HSD clean oil tank 4.5 KL -01 No
v) Air conditioning system comprising of 2 Nos air conditioning units with one set fine filters ducting with supply air diffusers including electrical starters cabling etc 01 Plant
w) SCADA power automation system for 10.0 MW CPP complete with industrial PC pentium IV with 21" colour monitor with inkjet printer - 01 No
x) VRLA type battery banks with 24 V DC Battery charger dual - 02 Sets
Note for item No.1 above :-
a) Contractor has to employ minimum following staff for Manning and operation of the plant :-
i) One No MCM / Supervisor having minimum qualification Diploma in Mechanical / Electrical Engineering from recognized institute with adequate experience in one shift of 8 hrs (Total - 01 Nos per day)
ii) One No. FGM Highly skilled / operator having minimum qualification ITI in Fitter / Electrician from recognized institute with adequate experience in each shift of 8 hrs (Total 03 Nos Per day)
iii) One No. FGM skilled / assistant operator having minimum ITI qualification in Electrician / Mechanic trade from Govt. recognized institute with adequate experience in each shift of 8 hrs (Total 03 Nos Per day)
iv) One No Electrician highly skilled / operator having minimum qualification Diploma in Electrical Engineering from recognized institute with adequate experience in one shift of 8 hrs(Total 01 Nos Per day)
v) One No Mate / helper minimum 10 th pass with adequate experience in two shift of 8 hrs (Total - 02 Nos per day)
b) Unit rates quoted above shall be deemed to be included the cost of stationery & communication and safety gears / clothing for operating staff.
c) The contractor has to maintain various records as mentioned in particular specifications and as directed by EIC in binded book / registers
d) Fuel (Diesel) and water for CPP will be issued by the department free of cost However proper record of fuel consumption will be maintained in binded book by the contractor and put up to the Engineer - in - Charge weekly.
e) The Contractor shall pay the wages to the opreators/helpers (as applicable) through e payment i.e. Aadhar linked bank accounts (credit to their bank account). GE shall ensure that e-payment made to the opreator / helper and their wages shall not be less than minimum wages fixedd by state Govt or Central Govt whichever is more. Monthly e banking statement shall be furnished by contractor to the GE and the same shall be kept in record duly verified.
f) It is responsible of contractor to deposit the employees provident fund (EPF) to the connected authority as per the prevealing scales as laid down by Ministry of labour for all opreator/helper (as applicable) and necessary proof to this regard shall be submitted to the Engineer-in- incharge for verification and record. The quoted rate shall be deemed to be included of above provisions. In case contractor fails to produce the proof of EPF, shall be liable for action as deemed fit. Decision of GE in this regard shall be final and binding.
g) The contractors shall maintain all the registers under various labour law rules 2017 and shall be produced to GE and as well as officers detailed by labour department.
h) The rate quoted shall deemed to be inclusive of safety gear and required tools for minor maintenaince. In case of failure to provide tools kit and safety kits (gum boots-02pairs, hand glooves) penalty of RS.3000/- per person per month will be recovered and levied.
i) The contractor shall provide 02 uniforms to each opreator and design of uniform shall be got approved. In case of failure, a penalty of RS.1200/- per month per uniform and will be levied and recovered from the dues
j) In case of failure due to absence of opreative staff, the contractor shall be liable to pay compensation at twice the cost of a day's manning and opreation derived from pro rata rate of Schedule 'A' quoted rates.
SCHEDULE 'A' - PART II (REPAIR MAINTENANCE OF 10.00 MW CPP)
M& L for servicing of Turbocharger comprising of following works & Dynamic balancing of the Rotor Shaft to be carried out by qualified team of engineers from Manufacturers Authorised Repair Workshop:-
i) Dismantling the turbocharger from the installed position & removing , loading, transporting the turbocharger cartridge to OEM authorised & approved workshop for dynamic balancing.
ii) Mechanical cleaning , assesmment & working condition evaluation of the turbocharger
iii) Complete overhaul & servicing of the turbocharger
iv) Dismantling of the Cartridge , Mechanical cleaning of the rotor and Assessment of the rotor shaft & condition evaluation
v) Replacement of Standard Overhaul Spareparts as per recommendation of OEM standards of maintenance
vi) Dynamic balancing of the rotor shaft & balancing of the rotor complete
vii) Re Assembling the complete cartridge & transporting back to the site
viii) Re Assembling the complete turbocharger with the cartridge, re- installing & commisioning of turbocharger assembly with the DG sets complete as per OEM Standards
ix) Documentation & submission of the service & test reports as per prescribed format.
M&L for routine maintenance of cooling Tower by disconnecting the inlet and outlet water pipe line, dismantling the FRP cooling tower for DG Set CPP, taking down PVC fins completely and fix new PVC fins to the required volume & size, scrapping down the hard water deposited from the waste and bottom tray with dilute chemical solution & preparing the surfaces by scrapping old paint & applying two coats of weather coat bituminous paint of approved colour over a coat of epoxy primer on external surfaces of cooling tower & tray all as directed , including dismantling cooling tower fan motor assembly & overhauling fan, varnishing the winding , heating and packing including replacement of bearings, and reassembling the fan , overhauling sprinkler assemly and louvers complete, drift eliminators PVC pipe with cap & locknuts etc to protect from weather effects & testing of cooling tower for proper functioning complete including filling of bearing housing with SAE 20 grade mineral oil of required quantity, greasing the bearing with 10CL Mobilux grease, & supply fix poly prophylene meter Nozzeles 'V' Belt for cooling tower fan, specified & directed by Engineer in charge. Note: The above quoted rate includes servicing of filter for cooling tower by replacing the strainer, nuts and bolts of required size and removing the dirt inside the filter pipe line complete all as specified and directed by Engr-In-Charge. Note : Items under schedule item No 3 herein below shall be measured & paid as supply only item.
Supply Only following routine Spares for auxillaries. Note:-(Make of the spare shall be same and cooling tower or as recommanded by the manufacturer)
FRP fins for cooling tower
Nozzles
Overhauling / Servicing of 62.5 KVA DG set , removing tapped cover after removing inlet / outlet pipe removing engine head replacing unserviceable valve seat & valve guide inlet & outlet as required replacing engine main gasket sheet cleaning the oil sump, cleaning/ replacement of fuel oil filter, cleaning of air filter, repair to the self starter assembly,reapir to the AMF panel of the DG,Replacement of the fuel injection nozzles, repair and caliberation of the FIP, cleaning & checking of all diesel hose pipes, replacement of engine oil, repalcemet of battery terminals & battery leads, servicing of self starter dynamo by replacing carbon brushes beairngs & bushes and reassembling the engine head & tappered cover in original possition including all as specified in 'C' check of engine manufacturer. Note :- Rate quoted includes cost of new items for replacement The engine oil for filling/topup will be meausued in the respctive items below
Ditto all as per item No.5 above but for diesel engine of air compressor type DA 16, BHP 16.2 cylinder
M & L for Servicing of Lube Oil Coolers by dismantling,condition evaluation, transporting to workshop, thorough mechanical /ultrasonic mechanical cleaning the copper tube by steel brush, replacement of worn out parts like Synthetic rubber rings, Gaskets, O rings , nuts and bolts etc., assessment of leakages through pressure testing, reinstalling in original position & tetsing & commissioning as per OEM standards. Note :- Rate quoted includes cost of new items for replacement.
M & L for Servicing of Starting Air Compressor 12.5 HP by disconnecting electric motor & outlet piping, transporting the air compressor to work shop, dismantling air compressor, replacing worn our parts such as piston Ring, Oil Ring, Gas Ket Set, Bearings, Greasing Oiling & Reinstalling air compressor in original position including replacement of unserviceable soloniod coil, pressure switch etc , testing & comissioning all as specified and directed. Make ELGI, Model HP 12300 max working pressure 30 Bar, RPM 1100 of Air compressor. Note :- Rate quoted includes cost of new items for replacement
M & L for Stack monitoring of all DG sets for T, V, QE, SPM, NOx, SO2 , CO2 & NMHC) & submision of Reports as per KPSCB norms by tapping exhaust gas from chimney at prescribed height all as directed.(2.5MVA x 4,62.5KVA x 1 and 320 KVA x 1)
Testing of earthing resistance of earthing pit for DG sets and assosciated accessories and furnishing report all as directed.
M&L for servicing of the safety valve of air receiver capacity 0.50m3 , working pressure 30 kg/cm2, Design pressure 33 kg/cm2 & test pressure 50 kg/cm2 all as specifed & directed.
S & F in replacement of air drain valve max. Working pressure 35 kg/cm2, end can size 0.5 BSP, Max. Working temp. 75degee C. For air receiver all as specifed & directed.
M/L for servicing of DG control panel installed in CPP control room involving Calibration of the DE/NDE Sensors (01 set ie 02 nos, Ground protection Relay (01 no). ABB REM 543. 110v AC.Aux,V:24vdc. 7CT,2PT Input (01 no.), Gen. ROTOR Earth fault relay ( 01 nos.), Gen. STATOR Earth fault relay (1 nos.), Triping Relay & Dead Bus Relay (2 nos) all as specifed & directed. Note:- The above quoted rate includes the replacement of Amp meter, Voltmeter and RPM meter of the engine as per the existing specifications.
M & L for Servicing Automatic Voltage regulator AVR PANELS.and replacement of defective parts all as specifed & directed. Note:- The above quoted rate includes the calibration of Exciter panel and making sure the Voltage, RPM and frequency are as per the prescribed limits of OEM.
M & L for Servicing of Local sensor Stand (LSS) PANEL .incl Calibration of the Pressure switch & 02 no. Temperature Switch ( HT < water ) 06 nos of Pr. Gauge. (HT & LT inlet and outlet Lube oil temp inlet and outlet pr and replacement of defective parts all as specifed & directed.
M & L Servicing of Lighening Arrestor Protection Transformer (LAPT) PANEL incl Calibration of Droop CT (01 no), Droop PT(01no), & Distribution Lightning arrestor CT(01no.) surge arrestor CT(01 no) core balance CT(01no) , & DROOP Transformers. (01no) and replacement of defective parts all as specifed & directed.
M & L for Servicing of Neutral Grounding Resistance (NGR) PANNEL incl Calibration of Protection CT (01 no).CBCT (1 nos) , Differential CT (03 nos) and replacement of defective parts all as specifed & directed.
M & L for Overhauling & Servicing of Gen. Bkr. PANEL incl Calibration of the CT, PT, (08 nos)& Enercorn EM 3460 RELAY (04 sets.), ABB Make Complex Protection relays ( 4 Sets) and replacement of defective parts all as specifed & directed. Note:- The above quoted rate includes the repair to the Control wiring of the panel as per the OEM service manual.
M&L for dismantalling the pump set from foundation and motor unit opening complete pump set , cleaning, replacing unserviseable parts such as gun metal bushes, rubber packing, ms nuts,bolts,rubber coupling , (spider) bearings, ai valve etc. With approved makes. Reassembling, reinstalling,testing and commissioning for satisfactory running complete all as directed by EIC for the following pumps including transporting pumpsets to workshop to and fro to a distance exceeding 200KM and not exceeding 500KM, for machininig work/ obtaining proper/suitable spares complete for:-
Lub. Oil priming pump set 7.5 HP.
HT water pump set 3 HP.
LT water pump set 10 HP.
M & L for rewinding of electric motors 3 phase 50Hz 415 volt comprising of following activities for motor of following capacity complete all as directed & specified & as per manufactures instructions Notes:- i) Disconnecting & removing the electric motor from installed position & loading, unloading, transporting each seperately to authorised & nearest approved workshop to a distance exceeding 200KM and not exceeding 500KM for rewinding ii) Dismantling existing burnt winding from the motor, prepare for & including rewinding complete with super enamelled copper winding wire of existing guage including all material such as insulated paper, sleeves, tape, varnish etc. complete for class F insulation, keeping in hot air oven for drying, packing & reassembling complete. iii) Reinstalling in position & in alignment including electric connection, commissioning & testing in actual working condition to check designed RPM performance complete.
iv)Replacement of Ball bearings & bushes of existing size with exisisting make.
Elect motor 0.5 to 1 HP
Elect motor 3 HP
Elect motor 4 HP
Elect motor 5 HP
Elect motor 7.5 HP
Elect motor 10 HP
Supply Only lubricants.
Lubrication oil system 68 for alternator bearings.
ELGI Air lube oil for air compressors .
lube oil SERVO Marine-10-40Grade.
Supply Only following miscellaneous consumable items .
i) Gasket sheets (1.5mm,2mm,3mm size) sets, Make champion.
ii) Cotton waste.
iii) polish paper-80,100,200, & 300.
iv) Emery papers.
v)Wire brush.
vi) Hydro chloric acid.
vii)Salt
viii) CRC anti - Corrosive Spray
ix) Chemical Testing Kit For hardness testing ( Make Indian Easy Test (10 N exchange) and nitrite test ( Make : Aqua XL (Nitrite XL 107))
x) Rustoline
xi) Hack Saw Blades
xii) HT fuze 3.1 Amps round type
xiii) Pressure Switch any Capacity
xiv) Auxiliary Relay 110 Volt DC 14 pin
xv) Auxiliary Relay 24 Volt DC 14 pin
xvi) HRC Fuses of 63 / 100 Amps Square type (Din Type)
xvii) HRC Fuses of 2 Amps to 32 Amps round type (Cylindrical tube type)
xviii) HRC Fuses of 40 Amps round type (Cylindrical tube type)
xix) HRC Fuses of 63 Amps round type (Cylindrical tube type)
xx) Over Load Relay any capacity
xxi) Metalic gasket 2/3 mm thick
xxii) Rubber Gasket
xxiii) Grease
xxiv) Welding Electrode 2.5 mm & 4mm
Supply only for chemical consumables
KW101L Phosphate base corrosion inhibitor
KW1002 Dispersant
KW C 309 Carbamate base non oxidizing biocide
KW BD Bio-Dispersant
KW30104A Non oxi Biocide
KW 107 M Nitrite base corrosion inhibitor
M & L for Servicing of Plate Heat Exchanger by dismantling, assessment & condition evaluation, transporting to workshop, thorough mechanical cleaning repairing , conducting DP test, replacement of worn out parts like Field Gaskets, Ring Gaskets, Pressure Guages, Spools gasketting, Pressure testing for leakages & reinstalling the PHEs in original position & testing & commissioning as per OEM standards.
Labour only for carrying out servicing of DG sets( through authorised service rep/OEM) of capacity 2500 KW, 11 KV and Engine Make KOEL, Type 9PA 61-280 with rated BHP 3600 & all other connected equipments forming part of CPP including routine maintenance and replacement of defective / unserviceable spare parts as per site requirement including testing of DG sets after servicing so as to provide uninterrupted power supply as directed by EIC. Material / spare parts will be measured and paid seperately under respective item here - in - below as mentioned.
A) CYLINDER HEAD :
a) Visual inspection of the rocking gear.
b) Adjustment valve backlash on cold engine.
c) Inspection of the starting air valve flaps & rings.
d) caliberation of the tappet settings
e) Timing gear caliberation/setting
B) FUEL INJECTION :
a) Check calibration Atomization & the tightness of the injector.
b) Replacement of injector nozzles if required
c) Checking of the sliding of the injection pump racks.
d) Replacement of the Anti splash screws.
e) Inspection of Fuel injection pump
C) CRANK CASE - BEARINGS - CRANK SHAFT :
a) Carry out the crankcase inspection.
b) Measurement of the crankshaft deflection
c) Inspection of the bearing shells of two main bearings
D) COUPLING - VIBRATION DAMPER :
a) Check the resilient segment of the coupling and inspection of relilient material.
E) FLUID SYSTEM:
a) Checking of the pneumatic starter
b) Inspection of the Air distributor disk.
c) Inspection of the Main starting valve.
d) Inspection & cleaning of the self cleaning fuel filter.
e) Inspection of the oil pump safety valve.
f) Inspection of the oil pressure control valve.
g) Inspection & cleaning of the self cleaning oil filter.
h) Inspection of centrifugal oil purifier
j) Replacement of the filtering elements of self cleaning SOFRON
k) Inspection of fuel feed pump
l) Cleaning of air fins and water tubes of lube oil MOTI filter
F) GOVERNING - OVER SPEED - SAFETY – WIRING SYSTEM :
a) Replacement of hydraulic governor or actuator oil.
b) Run the electronic overspeed test.
c) Inspection & calibration of the electric actauator of electronic governor and calibration of same
d) preperation of the governor connected with DG set of cap 2.5MW speed and frequency as required by the existing synchronising panels all as specified.
Supply only following spare parts for overhauling of KOEL DG sets as mentioned in item Ser No 25.00 here-in-before.
ROCKING GEARS
Screw with expanded tappet cat part No. 79.033.28.0.00
Special nut cat Part No. 79.033.35.0.00
Fuel INJECTORS
Helicoflex Sealing Joint Cat Part No. 27.067.16.0.00
Copper Washer ( 20 x 27) Cat Part No. 50.508.20.000
O RING D-8, 21A7, L120C7 Cat Part No 74.466.02.000
Cap nut cat Part No. 79.041.03.0.00
Ring D164 3.5D NSE6.531 60C7, Cat Part No.79.041.15.000
Injector gasket Cat Part No. 79.041.18.0.00
Bush Viton Cat Part No. 79.041. 19 .000
O RING D135 3D NSE6. 531 60C7 Cat Part No 74.041.21.000
Injector Nozzle Assembly 9x0.50x140 cat part. 27.067.05.000
Gasket cat part. 79.034.77.000
FUEL FILTER
Fuel Filters Element Cat Part No.79.352.06.0.00
O Ring Filter cover (2.5 x 160, 21502) cat part No. 30.300.18.000
O Ring Filter cover (3.5 x 112, 21502)cat part No. 30.300.28.000
O Ring- Relief valve (2.5 x 13, 21502)cat part No. 30.300.34.000
COUPLING
O Ring DIA 17 x DIA 4x4 (20401) Cat Part No 70.657.33.0.00
O Ring (20301) 4x460 Material =Nitri Cat Part No 80.356.13.0.00
STARTING AIR VALVE
Copper Washer (30 x 38) Cat Part No 50.508.35.000.
Conical Spring Washer (M 14) Cat Part No 50.527.10.000.
Spring Cat Part No 79.040.03.0.00
Washer Cat Part No 79.040.04.0.00
Ring Cat Part No 79.040.06.0.00
Snep Nut,(BINX NUT) HM10, Cat Part No 79.040.08.0.00
O - Ring, MS29-513/126, 21A7, NSE 6.531, Cat Part No 79.040.10.0.00
Piston 79.040.05.0.00
GOVERNOR DRIVE
Key Cat Part No 50.402.08.025.
Circlip External-30 MM Cat Part No 50.501.30.000.
Circlip internal - 62 MM Cat Part No 50.502.62.000.
Circlip internal- 80 MM Cat Part No 50.502.80.000.
O Ring No AN58NSE 6.5, 21 A7 Cat Part No. 79.049.24.0.00
Lub oil cooler and chrger cooler
Set of Gasket and O Ring for Lub Oil Cooler Cat Part No 79.425.59.0.00
EXHAUST MANIFOLD
Gasket cat part No. 72.328.13.000
Flexible joint cat part No. 79.078.07.000
Exhaust gas temp sensor cat part No. 81.068.02.000
Flexible joint cat part No. 27.052.21.000
THERMOMETER / SWITCHES
Thermometer 0- 100 to Suit M18X1.5 Cat Part No79.277.02.0.00
Thermometer 0- 200 to Suit M18X1.5 Cat Part No79.277.03.0.00
Material & Labour required for complete dismantling of existing burnt out 11 KV indoor type epoxy resin cast Voltage transformer and replacing the same with Voltage transformer of Single phase, Single pole, frequency- 50 Hz, and Ratio 11KV/RT3-110V/RT3-110/3 with following specifications. Winding 1: Class 1.0 Burden 100VA Winding 2: Class 3P Burden 100VA Winding 3: Class 3P Burden 50VA Voltage Factor 1.2 continuous./ 1.5 for 30 sec.
Material & Labour required for complete dismantling of existing burnt out 11 KV indoor type epoxy resin cast Control transformer and replacing the same with Control transformer of Three phase, frequency- 50 Hz, Ratio 11KV/440V Capacity 2.5 KVA with following specifications. ILV 12/28/75 KVP, with Three Nos HRC Fuse on HV side of rating 12 KV, 1 Amp.
Material and Labour required for complete dismantling of existing burnt out 11 KV lightning arrestors and replacing the same with lightning arrestors suitable for 11 KV diesel generator.
Supply & Fix in repairs Valve Regulated Lead Acid type Battery 2 Volt,150 Ah .Make Exide
Supply & Fix in repairs heating element as existing on site of capacity 6 KW complete all as specified and directed by Engr-in-charge.
M&L for visual checking and inspection of the DG set of cap 2.5 MW, 11KV for oil leakage at cylinder head,oil circulating lub oil pump, inspection door gaskets, oil circulating high pressure resistant oil pipes and any other part of DG set and identifying the hot spots of the oil leakage and rectifying the oil leakage defect by tightening the fasterners, replacing the gaskets of requisite shape and size at diifferent locations of the DG sets, replacement/reapir to the lub oil circulation high pressure pipe and repacement/reapir of the oil seals at different locations of the DG sets complete all as specified and directed. Testing of the engine for any leakage of lub oil by running the engine at full speed and rectifying the defects noticed if any. Note:- The above quoted rate includes the below supply only items a) Gaskets of any shape and size suitable for inspection doors-09 Nos b) Nuts and bolts of any size c) lube oil circulation pipe of any size up to 10 Mtrs length d) Oil seal of any type-05 Nos
M&L for caliberation of governor assembly of the DG set of cap 2.5 MW, 11 KV for desired output inorder to maintain the voltage and frequency of the DG set witin the limit of +/-1% of Voltage-11KV and frequency of 50HZ during all the time and dismantling of the governor assembly from the engine head and transporting the same to the OEM/authorized workshop and strip opening the governor assembly nad carrying out the requisite repair required to rectify the defects and assembling the governor assembly and refiiting the same with the DG set and testing the output of the DG set in the presence of the Engr-In-Chrage and rectifying the defects if any noticed complete all as specified and directed.
M&L for earthing complete with Copper earth plate electrode 60 cm x 60 cm x 3.15 mm thick electrode burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5m below normal ground level, connected to copper strip 20 x 3mm by means of bolts, nuts, check nuts and washers of GI or steel including necessary earth work and excavation of in any type of strata, PCC 1:3:6 type C-2 GI tubing 20 mm dia for watering and 40 mm dia GI tubing for protection of wire etc all as per electrical plate No.3 of SSR part I including connecting to electrical equipments and testing on completion all as specified and as directed. Note: Copper strip upto 7.5m height is deemed to included under quoted rate.
M&L for Earth continuity conductor or main earthing lead fixed to wall on batten or recess or chases or buried in ground or drawn in & including conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 2mm dia galvanised iron or steel wire
DURGAI ELECTRICALS
Raheel Enterprises
ANKIT SHIP REPAIRERS AND SUPPLIERS
Shree Ayyappa Engineering
BRITE INDUSTRIES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .