| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.8 LAccepted-AOC | ₹21.8 L Quoted ₹19.2 L | 1 | Accepted-AOC Lowest rate quoted by M/s Sweta Construction Budaun from the Tender BOQ rate |
| 2 | 2₹19.9 LRejected-Finance 257 132 KRISHNA NAGAR KYDGANJ PRAYAGRAJ | ₹19.9 L | 2 | Rejected-Finance High rate quoted by the bidder instead of Ist Lowest bidder |
| 3 | 3₹20.3 LRejected-Finance | ₹20.3 L | 3 | Rejected-Finance High rate quoted by the bidder instead of Ist Lowest bidder |
| 4 | 4₹20.5 LRejected-Finance | ₹20.5 L | 4 | Rejected-Finance High rate quoted by the bidder instead of Ist Lowest bidder |
Tender Value
₹28.7 L
EMD Value
₹2.9 L
Closing Date
13 Mar 2026, 12:00 pmClosed
Executive Engineer Const. Div. PWD Budaun
O/O EXECUTIVE ENGINEER CONST.DIV.PWD BUDAUN
Collection of Grit and Dust at Dept Hot Mix Plant Bisauli for Path Repair work in State Highways- Other District Roads and Village Roads in Year 2025-26
2026_CEBLY_1114954_2
166(5)/Nivida(ET)/25-26 Dtd 05-02-2026
Open Tender
Civil Works
120 days
Budaun
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹2.9 L
Yes
Budaun
30 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
9 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer Construction Division PWD Budaun
Name of Work:- Collection of Grit, Pot Holes Filling and Patch Repair of State Highways, ODR and Village Road at Dept. Hot Mix Plant Year 2025-26 .
Contract No: - 166(5)/Nivida(E.T.)25-26 Dt. 05-02-2026
Sl. No. Item Description (Excluding G.S.T.) Item Code / Make Quantity Units Estimated Rate UNIT Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405) At diffrent VR Cum Excess(+) Full Conversion INR
2 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405) At diffrent VR Cum Excess(+) Full Conversion INR
3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 404) At diffrent ODR Cum Excess(+) Full Conversion INR
4 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with garader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. for proper completion of the work as per MORT & H specifications Sr No. 4.14 (406 (B)). Cum Excess(+) Full Conversion INR
5 Collection of 13.2-10 mm. size stone grit from approved quarry including cost of material, royality, cartage upto site, loading-unloading , stacking and all taxes such as octroi, toll tax etc including all Labour, T&P etc. required for proper completion of work As per direction of engineer-in-charge. At departmental Hmp Bisauli Cum Excess(+) Full Conversion INR
6 Collection of 6 mm. below size stone grit from approved quarry including cost of material, royality, cartage upto site, loading-unloading , stacking and all taxes such as octroi, toll tax etc including all Labour, T&P etc. required for proper completion of work As per direction of engineer-in-charge.At departmental Hmp Bisauli Cum Excess(+) Full Conversion INR
7 Collection of 25-10 mm. size stone grit from approved quarry including cost of material, royality, cartage upto site, loading-unloading , stacking and all taxes such as octroi, toll tax etc including all Labour, T&P etc. required for proper completion of work As per direction of engineer-in-charge. Cum Excess(+) Full Conversion INR
8 Collection of 13.2-10 mm. size stone grit from approved quarry including cost of material, royality, cartage upto site, loading-unloading , stacking and all taxes such as octroi, toll tax etc including all Labour, T&P etc. required for proper completion of work As per direction of engineer-in-charge. Cum Excess(+) Full Conversion INR
9 Collection of 10-5 mm. size stone grit from approved quarry including cost of material, royality, cartage upto site, loading-unloading , stacking and all taxes such as octroi, toll tax etc including all Labour, T&P etc. required for proper completion of work As per direction of engineer-in-charge. Cum Excess(+) Full Conversion INR
10 Collection of 5 mm. below size stone grit from approved quarry including cost of material, royality, cartage upto site, loading-unloading , stacking and all taxes such as octroi, toll tax etc including all Labour, T&P etc. required for proper completion of work As per direction of engineer-in-charge. Cum Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_2085176.xls
BOQ • 0.32 MB
T1_5.pdf
Tender Documents • 1.59 MB
Download all tender documents and submit your bid