| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance P 1 310 D WEBEL COMPLEX TARATALA ROAD BRACE BRIDGE KOLKATA WEST BENGAL 700088 | KOLKATA | KOLKATA | WEST BENGAL | 700088 | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 LAdmitted-Finance | ₹3.1 L | L2 | Admitted-Finance |
| 3 | L3₹3.1 LAdmitted-Finance 202 SODEPUR FIRST LANE HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 18 0000796 19AAJCB1079Q1ZZ R M MSME STATUS AS VERIFIED | KOLKATA | WEST BENGAL | 700082 | ₹3.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SEN ELECTRICALS L1 | M M POWER L2 | BIECTECH ELECTRICALS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00 | DRAWING OUT OF THE EXISTING TRANSFORMER OIL FROM
INSIDE THE TANSFORMER TANK AND PRESERVING THE SAME IN THE REQUIRED NUMBER OF 200 LTRS. CAPACITY BARREL. | 1 | ONE ITEM | 14,657 ₹14,657 | 15,012 ₹15,012 | 15,335 ₹15,335 |
| 2.00 | OPENING THE TOP COVER OF THE TRANSFORMER AND
DISCONNECTION THE HV & LV CONNECTION FROM THE
BUSHING, THE CORE & COIL ASSEMBLY TO BE LIFTED FROM
TRANSFORMER TANK AND TO BE KEPT ON THE PROPER
PLACE WITH THE HELP OF A CHAINPULLEY BLOCK FOR
THOROUGH CLEANING. | 1 | ONE ITEM | 18,322 ₹18,322 | 18,764 ₹18,764 | 19,169 ₹19,169 |
| 3.00 | OPENING THE TRANSFORMERSHED IN ORDER TO LIFT THE
CORE AND COIL ASSEMBLY FROM THE TRANSFORMER TANK AND TO FIX THE SAME AFTER COMPLETION OF THE JOB. | 1 | ONE ITEM | 7,941 ₹7,941 | 8,131 ₹8,131 | 8,306 ₹8,306 |
| 4.00 | THOROUGH CLEANING AND REMOVING OF SLUDG FROM THE TRANSFORMER TANK, CORE & COIL ASSEMBLY BY HOT
TRANSFORMER OIL AS PER DIRECTION AND SPECIFICATION
OF ENGINEER - IN - CHARGE. | 1 | ONE ITEM | 16,610 ₹16,610 | 17,012 ₹17,012 | 17,379 ₹17,379 |
| 5.00 | RE-FIXING THE TRANSFORMER CORE & COIL ASSEMBLY IN
THE TANK AND RE-CONNECTION OF THE BOTH HV & LV
WINDINGS AS PER DIRECTION OF ENGINEER - IN - CHARGE. | 1 | ONE ITEM | 10,688 ₹10,688 | 10,946 ₹10,946 | 11,181 ₹11,181 |
| 6.00 | SUPPLY OF TRANSFORMER OIL (ELECTRO BRAND) FOR
TOPPING UP OF TRANSFORMER. | 750 | LITER | 230.4 ₹1.7 L | 237 ₹1.8 L | 242 ₹1.8 L |
| 7.00 | NECESSARY DEHYDRATION OF THE TRANSFORMER AND
TOPPING UP TO REQUISITE LEVEL BY FRESH TESTED
TRANSFORMER OIL. DI-ELECTRIC STRENGTH OF THE
TRANSFORMER OIL WILL BE MEASURED AT 50KV D.C
VOLTAGE FOR ONE MINUTE WITH IN SPHERE GAP OF 2.5 MM AS PER RELEVANT I.S. CODE OF PRACTICE & TO THE
SATISFACTION OF ENGINEER-IN-CHARGE. | 400 | LITER | 12.12 ₹4,848 | 15.45 ₹6,180 | 16 ₹6,400 |
| 8.00 | HIRE CHARGES OF TRANSFORMER OIL FILTRATION M/C. | 2 | DAYS | 2,763 ₹5,526 | 2,830 ₹5,660 | 2,890 ₹5,780 |
| 9.00 | HIRE CHARGES OF TRANSFORMER OIL BDV TESTING
MACHINE. | 2 | DAYS | 686 ₹1,372 | 707 ₹1,414 | 723 ₹1,446 |
| 10.00 | SUPPLY OF NEW GASKET & PETROLEUM JELLY. | 1 | ONE ITEM | 4,318 ₹4,318 | 4,422 ₹4,422 | 4,517 ₹4,517 |
Tender Value
Refer Docs
EMD Value
₹5,990
Closing Date
25 Feb 2026, 2:00 pmClosed
EXECUTIVE ENGINEER (GRWW)
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
REPAIRING, OVERHAULING, DE-HYDRATION, TESTING AND COMMISSIONING OF 1000 KVA, 6KV / 415V TRANSFORMER NO.-2 AT PH-II SUB-STATION IN GRWW.
2026_KMC_1001914_1
KMC/EE/WS/GRWW/25-26/PH-II/51
Open Tender
Electrical Work/ Equipment
7 days
CWPS-II, SUB STATION OF GARDEN REACH WATER WORKS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,990
15 May 2026
9 Feb 2026
27 Feb 2026
9 Feb 2026
25 Feb 2026
9 Feb 2026
DRAWING OUT OF THE EXISTING TRANSFORMER OIL FROM INSIDE THE TANSFORMER TANK AND PRESERVING THE SAME IN THE REQUIRED NUMBER OF 200 LTRS. CAPACITY BARREL.
OPENING THE TOP COVER OF THE TRANSFORMER AND DISCONNECTION THE HV & LV CONNECTION FROM THE BUSHING, THE CORE & COIL ASSEMBLY TO BE LIFTED FROM TRANSFORMER TANK AND TO BE KEPT ON THE PROPER PLACE WITH THE HELP OF A CHAINPULLEY BLOCK FOR THOROUGH CLEANING.
OPENING THE TRANSFORMERSHED IN ORDER TO LIFT THE CORE AND COIL ASSEMBLY FROM THE TRANSFORMER TANK AND TO FIX THE SAME AFTER COMPLETION OF THE JOB.
THOROUGH CLEANING AND REMOVING OF SLUDG FROM THE TRANSFORMER TANK, CORE & COIL ASSEMBLY BY HOT TRANSFORMER OIL AS PER DIRECTION AND SPECIFICATION OF ENGINEER - IN - CHARGE.
RE-FIXING THE TRANSFORMER CORE & COIL ASSEMBLY IN THE TANK AND RE-CONNECTION OF THE BOTH HV & LV WINDINGS AS PER DIRECTION OF ENGINEER - IN - CHARGE.
SUPPLY OF TRANSFORMER OIL (ELECTRO BRAND) FOR TOPPING UP OF TRANSFORMER.
NECESSARY DEHYDRATION OF THE TRANSFORMER AND TOPPING UP TO REQUISITE LEVEL BY FRESH TESTED TRANSFORMER OIL. DI-ELECTRIC STRENGTH OF THE TRANSFORMER OIL WILL BE MEASURED AT 50KV D.C VOLTAGE FOR ONE MINUTE WITH IN SPHERE GAP OF 2.5 MM AS PER RELEVANT I.S. CODE OF PRACTICE & TO THE SATISFACTION OF ENGINEER-IN-CHARGE.
HIRE CHARGES OF TRANSFORMER OIL FILTRATION M/C.
HIRE CHARGES OF TRANSFORMER OIL BDV TESTING MACHINE.
SUPPLY OF NEW GASKET & PETROLEUM JELLY.
FOLLOWING TESTS HAVE TO BE CARRIED OUT FOR THE CONSERVER TANK INCLUDING OIL LEVEL GLASS ETC. AS REQUIRED. A) RATIO TEST, B) HIGH VOLTAGE TEST (10KV DC FOR 1 MIN.), C) WINDING RESISTANCE TEST, D) INSULATION RESISTANCE TEST.
ACIDITY TESTING OF THE TRANSFORMER OIL BY AN AUTHORISED AND REPUTED AGENCY AND TEST RESULT IN DUPLICATE TO BE SUBMITTED TO THE DEPARTMENT.
REPLACEMENT OF THE OLD SILICA GEL WITH FRESH ONE AND OVERHAULING OF THE CONSERVATOR TANK INCLUDING OIL LEVEL GLASS, ETC. AS REQUIRED.
THOROUGH CLEANING OF THE TRANSFORMER AND SPRAY PAINTING OF THE OUT SIDE SURFACE OF THE SAME WITH ONE COAT OF RED OXIDE PRIMER AND TWO COATS OF BARGER / ASIAN MAKE SYNTHETIC ENAMEL PAINT.
TRANSFORMER COMMISSIONING CHARGES
SUPPLY OF H.T. ELECTRICIAN.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
TECH51.pdf
Tender Documents • 0.44 MB
OIDDETAILS.pdf
Additional Documents • 0.33 MB
BOQ_2455344.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid