Tender Value
₹1.3 L
EMD Value
₹3,900
Closing Date
13 Jul 2026, 6:00 pm4d left
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
CONSTRUCTION OF CROSSING ON GUDMARCH NEAR MUZAFAR AHMAD SHAH AND OTHERS BLOCK VESSU
2026_RDPR_314569_8
ENIT46of2026-27
Open Tender
Civil Works
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹3,900
4 Jul 2026
4 Jul 2026
14 Jul 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | - | cum | - | - |
| 0.0 | S/P of Stone Soling hand packed tightly in bed including levelling & ramming. | - | cum | - | - |
| 0.0 | P/L in position of cement concrete of specified grade excluding the cost of centring and shuttering 1:3:6 by using 20mm nominal size agg | 1 | cum | - | - |
| 0.0 | P/L in position of reinforced cement concrete for slab 1:1.5:3 by using 20mm Nominal size Agg. | - | cum | - | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level
5.22.1 Mild steel and medium tensile steel bars | - | Qtl | - | - |
| 0.0 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | kg | 1 | - |
| 0.9 | Structural steel work in tubular section | - | Kg | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.1 Foundations, footings, bases of columns etc. for mass concrete. | - | Sqm | - | - |
| 0.9 | Suspended floor | 1 | sqm | - | - |
| 0.0 | GSB/stone soling back filling | - | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1018580.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid