Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹6,700
Closing Date
27 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex Engineer Jalshakti Mech. Div Sgr
Office of the Ex Engineer Jalshakti Mech. Div Sgr
Overhauling of 11 KV, 1000 KW HT vertical Slip Ring Motor (Unit-I) and liquid Rotor Resistance Starter at Lift Water Supply Station Tangnar Stage-2nd..
2023_PHE_203094_1
57 OF 2022-23 Dated 20/01/2023
Single
Pumps/Motors
Item Rate
7 days
Tangnar
As per NIT
2 documents required · 2 mandatory
₹200
Yes
Ex Engineer Jalshakti Mech. Div Sgr
₹6,700
Yes
27 Jan 2023
21 Jan 2023
27 Jan 2023
21 Jan 2023
27 Jan 2023
21 Jan 2023
Amount
Overhauling of 11kV, 1000 kW HT Vertical Slip Ring Motor (Unit-1) as per the clause 16 & 17 of IS-900:1992 (to be read with the latest amendments) at Lift Water Supply Scheme Tangnar Stage-2nd by way of: -
Loading at Site and Shifting of Rotor and Stator to the works of the contractor and unloading there separately in two trips due to the weight lifting constraints of the vehicle and keeping in view safety requirements of the equipment.
Measuring, recording the initial insulation resistance (IR) & Polarization Index (PI) values of the stator windings and rotor windings, under high voltage using Mega Ohm Meter, current injection test at low voltage & at high current.
Cleaning Stator and Rotor from dust, dirt, oil and grit using Air blower, compressed air hose, bellows, brushes and washing with Isopropyl Alcohol/ Petrol and few drops of oil as necessary for complete removal of foreign matter.
Repairs to the rotor by way of dismantling of rotor binding, worn-out insulation and exposing the damaged end joints of the rotor by using Oxy-acetylene gas cutting torch. Brazing/soldering of damaged/cracked end joints of the rotor using brazing torch and brazing rods of superior quality to ensure good quality joints (48x2=96 joints) on both ends of rotor. Reinsulating the end joints and the copper busbars connected to the slip ring by using Phlogopite mica tape, glass fiber tape, F-Class insulating paper and F-Class varnish. The job further includes rebuilding of end binding firmly, by dipping and rotating of rotor in hot bath of Dobeckot 505 epoxy and hardener solution.Measuring, recording the Insulation Resistance (IR) & Polarization Index (PI) values again using Mega Ohm Meter.
Balancing of the rotor on the rotor-balancing machine by adding weights as per the requirement.
Heat Treatment/drying of the stator & rotor windings till the desirable IR values above 50 Mega Ohms are achieved by giving proper oven drying at the facility of the firm capable of holding above 1000 KW HT Slip ring Motor [Approx. size =8.5 ft x 3.5 ftx3.5 ft]at 90 to 100 degree Celsius for minimum 48 hours and checking, recording final desired parameters after Heat treatment procedure by required testing equipment.
Re-enameling of end joints, bus bars and rotor windings by Spraying of epoxy gel coats red with hardener with the help of spray gun to cover the insulation drying of the same thoroughly by specific means using hot blower, Checking and measuring IR Value again for the desired value
Re-enameling of all windings of Stator (Except stator bore) with 11 Kv grade Epoxy coatings [5 kgs approx.] along with hardener [1/4 kg] as recommended to withstand damp & wet conditions and drying of the same thoroughly by specific means using hot blower, Checking and measuring IR Value again for the desired value.
Complete disconnecting of both Motor Terminal boxes Checking and cleaning of thimbles, cable kits, HT tapes, clamps, Bus bar-coupler rubber with suitable cleaning aids and replacement of silica gel.
Loading at works of the firm and Shifting of Rotor and Stator to the site and unloading there separately in two trips due to the weight lifting constraints of the vehicle and keeping in view safety requirements of the equipment.
Reassembling of rotor assembly in the stator using tools & tackles including fitment of bearing housings on two sides. The job includes fitment of shields with allied works, connecting of all power and control cables. Successful Testing of HT motor 1st on no load & then on full load after coupling/locking arrangement, & connecting of HT motor to 11 kV Electric supply mains including Control cabling too at appropriate places.
Providing & Fitting of New bearing temperature sensors as per sample after replacement of damaged ones.
Providing & Fitting New DE & NDE bearing temperature dial indicators 5A 240 V AC/0.5A 220 V DC/as per sample after replacement of damaged ones.
Providing & Fitting of 3 core 70 mm2 end Termination Heat Shrinkable indoor type HT Cable kit as a replacement against Damaged ones.
Providing & Fitting of 630 mm2 aluminum long barrel lugs preferably of DOWELS make to cable end terminals with proper insulation/tapping at joints. The Job includes crimping of thimbles after replacement of worn-out ones using Hydraulic crimping tool.
Providing & Fitting of 185 mm2 aluminum long barrel lugs preferably of DOWELS make to cable end terminals with proper insulation/tapping at joints. The Job includes crimping of thimbles after replacement of worn-out ones using Hydraulic crimping tool
Reconditioning of roughened Slip Rings if found ridged out by way of turning/machining on lathe for the smooth finish including jig and fixture arrangement for holding work without causing any damage to slip rings. The job includes all leads and lifts between site and workshop.
Providing & Fitting of New carbon brushes of size 65x50x25 mm M16 E with heavy duty double copper tail 100 mm with U-Type copper lug. The job includes re-tensioning of same in brush holder springs at correct pressure and proper alignment to ensure smooth sliding of brushes free from slackness or stiffness using appropriate Torque wrench.
Providing & fitting of heavy-duty brass brush holders capable of holding two carbon brushes as per specimen i.e. BHEL make. The job includes re-tensioning of brush holder springs to correct pressure and proper alignment to ensure smooth sliding of brushes free from slackness or stiffness using appropriate Torque wrench
Servicing by removing of old grease from both bearings and its housings of DE & NDE side by way of washing cleaning with diesel/petrol. The job includes Servicing/ reconditioning of bearing & housings along with packing of fresh grease between the cage, races, balls and rollers, the superfluous grease if any has to be wiped off.
NOTE :- The above whole work is to be carried out under the supervision of a qualifiedexperienced Electrical Engineer “to be hired by the bidder” with adequate experience in handing of jobs of thisnature especially necessary Testing of the equipment.Suchin-charge/Engineer shall beconstantlyinattendanceatthesite with other skilled as well as unskilled workers duringworkinghours under whose supervision the whole work of Servicing, Maintenance & Overhauling from start to end has to be carried out.
Servicing of Liquid Rotor Resistance Starter of above 11kV, 1000 kW HT Vertical Slip Ring Motor (Unit-1) by way of:- i) Disconnecting all incoming and outgoing Power and control cabling from the starter assembly ii) Draining of old/used quantity of electrolyte of about 990 liters from the starter container to a safer place. iii) Cleaning the container, electrodes by suitable means using water and isopropyl alcohol along with all moving and fixed contacts/parts within the container. iv) Draining of old/used gear oil to gear mechanism of the starter and filling same with fresh gear oil approximately 01 liter. The job includes greasing/servicing of the motor assembly along with the transmission system of the starter including gears and chains. v) Cleaning/decarbonizing all the moving as well as fixed contact points of the 630A contactor assembly along with other auxiliary NO-NC contacts by using isopropyl alcohol and allied cleaning tools. vi) Cleaning/decarbonizing of busbar arrangement within the starter assembly including cable end terminals, lugs with replacement of aluminum thimbles/lugs if damaged. vii) After cleaning/servicing through above means filling of container with fresh electrolyte of 990 liters including 07 kgs of sodium carbonate for achieving starting torque of 200% of FLT and successful testing of starter on no load followed by full load after connecting all power and control cablings.
TESTS TO BE CARRIED OUT AT SITE AFTER SERVICING. a) IR/PIVALUE b) WINDINGRESISTANCE SURGETEST c) NOLOADCURRENTMEASUREMENT d) MESUREMENTOFBEARINGTEMPERATURES/ WINDINGTEMPERATURES. e) MEASUREMENTOFROTORIMPEDANCE/RESISTANCE LISTOFTOOLSANDTACKLESTOBEBROUGHTATSITE. HYDRAULIC PULLERS.OXYGEN/ACETYLENETORCHESANDCYLINDERS.PROPER TRNASPORTATION ARRANGEMENT FOR MOTORS FROM SITE TOMAINTENANCE BAY LIKE SLINGS, TROLLEYS, CRANE, ETC.WOODENSLEEPERSFORROTORRESTING.HEATERS OF APPROPIATE SIZEFORDRYING OF STATOR WINDINGUP TO 90 C.SUITABLEPIPESFORROTORWITHDRAWL.COMPRESSOR.BLOWERS.INDUCTIONHEATERSFORBEARINGHEATING.ALLTYPEOFSPANNERS.EQUIPMENTSREQUIREDFORSITETESTINGOFMOTOR.ALLOTHERTOOLSANDTACKLESREQUIREDTOEXECUTETHEJOBASPERSCOPEOFWORK
stage.html
html • 0.02 MB
finance_543000.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .