Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Turnover and Experience not Enclose |
Tender Value
₹1.6 L
EMD Value
₹4,000
Closing Date
24 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC
EDC CHITRAKOOT
Work of increasing the capacity of changers in villages under the business plan item under Chitrakoot power distribution division
2020_DVVNL_513431_1
24/SE/EDCCkt/2020-21
Open Tender
Electrical Works
Piece-work
180 days
CHITRAKOOT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹4,000
26 Sept 2020
19 Sept 2020
25 Sept 2020
19 Sept 2020
24 Sept 2020
19 Sept 2020
90 days
Amount
Cartage of Pole & material from store centre from any other place to the respective site of work through the Kachha Pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.
8.5 mtr. PCC Pole long
11 mtr. STP Pole long
LT P.V.C. Cable 1X400 SqMM/1X240 SqMM
Copper L-piece 62X225X12 MM/C Copper L-piece 50X225X10 MM
AI legg long barrel, off size (LS)
T/F Base angle with nut and bolt
Earthing Rod
ACSR Dog conductor
Stay set complete
T-off Channel holding clamp
Top Channel/Dropper Channel with Clamp
Guarding X-arm clamp With Nut&Bolt
63 KVA T/F
250/400 KVA T/F
GI Wire 6SWG
11 kv Disc Insulator/Pin insulator With fitting
Erection of 11 Mtr STP Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of 8.5 Mtr PCC Poles including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of T/F Base angle as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of T-off Channel with holding clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of Top Channel/Dropper Channel with Clamp as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of Pin insulator With fitting as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing of 11 kv Disc Insulator With fitting as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Installation LT P.V.C. Cable 1X400 SqMM, & 1X240 SqMM of 11 KV cable as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Installation Copper L-piece 62X225X12 MM/C Copper L-piece 50X225X10 MM as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Construction of new 250 KVA T/F Plinth & Francing including of first class brick sand cement etc. As per RESSPO manual (all Civil material shall be arranged by contractor)
Fixing & Installation Earthing Rod as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Fixing & Installation AI legg long barrel, off size (LS) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Installation of 250 KVA/400KVA T/f new Constructed plinth/Trolley as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Installation of 63 KVA T/f in double-pole as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Laying, Sagging, Binding & Jumpring ACSR weasel/Dog conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
M/S KAMDGIRI CONSTRUCTION
M/s. SONU ELECTRICALS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .