| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97,450Accepted-Finance | L1 | Accepted-Finance L1 |
Tender Value
₹2.0 L
EMD Value
₹3,000
Closing Date
27 Apr 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ECWD MBD
220 KV SUB STATION MANJOLA MORADABAD
For Increasing Capacity of 33 11 KV S S Babrala District Sambhal from 2 INTO 5 MVA to 10 PLUS 5 MVA under the business plan scheme 2021 22 IN THE JURISDICTION OF ECWD, MBD
2022_PVVNL_678073_1
22/ECWD(M)/2021-22
Open Tender
Electrical Works
Lump-sum
30 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE ECWD MORADABAD
₹3,000
Yes
28 Apr 2022
11 Mar 2022
27 Apr 2022
11 Mar 2022
27 Apr 2022
11 Mar 2022
90 days
Safe carriage following stock material from any Store Center of PVVNL to site of 33/11KV S/S Babrala (Sambhal). (Distanceapprox.- 150 Kms.): 1-11KV Alumn. Cable XLPE- 3x300Sq.mm,
Safe carriage following stock material from any Store Center of PVVNL to site of 33/11KV S/S Babrala (Sambhal). (Distanceapprox.- 150 Kms.): - For Item no 2.01 to 2.02 2.01- 24 Volt Battery and Battery charger
11KV Jointing Kit 3x300sqmm O/G and I/C
Water Level Earthing :- Boring and lowering by providing of G.I.Pipe size 40mm dia, into the ground upto water level or minimum 20Mtr, which ever is more, with the lower end of solid copper cone Approx 224mm long and 750gm in weight shall be provided and screwed in pipe as well as bringing out a continuous 35x6mm G.I.Strip, from the cone upto the ground surface where it will be bolted to the G.I. Strip for Transformer neutral connection, the G.I.Strip will be connected to star point through providing Copper Bond Strip of size-50x6mm.
Nutral Link Structure for Power T/F, As per RESSPO, as follows: 4 – Fabrication of structure, including cutting, straightening, drilling of holes and electric welding, as per Drawing., Excavation of earth, Grouting with C.C. in ratio 1:4:8
Draining of oil from conservator, radiators of existing 5MVA T/F, at 33/11KV S/S Babrala (Sambhal), into the dry & clean drums and staking at the safe place at 33/11KV S/S Babrala (Sambhal).
Dismantling of conservator, radiators and other accessories from existing 5MVA Transformer.
Shifting of 5MVA Transformer main body and other accessories from the substation switchyard to outside the switchyard.
Dragging/lifting of new 33/11KV, 10MVA T/F on Plinth from the unloaded place.
Erection of new 33/11KV, 10MVA Power T/F on Plinth, by fixing all accessories, like Radiators, Conservator Tank, Filling the T/F Oil to desired level and ensuring that there is no leakage, complete job in all respect.
Digging of Trench of size 0.45x0.6M., for laying of 11KV Cable for T/F, in “S” shape.
Laying of 11KV XLPE 3x300sq.mm. Alumn.Cable in the Trench & in air, for T/F from Control Room.
providing & laying of Ist Class Bricks on both sides and on Top of the Cable. Filling the Sand, inside the Bricks and refilling of loose earth in the Trench.
Making of joints by 11KV, 3x300Sq.mm. Heat Shrink type Jointing Kits, Indoor/Outdoor type, providing & fixing of Alumn. Lugs of proper size, by crimping on each phase of the Cable at both ends.
Fixing of Cable Box on 10MVA T/F, 11KV Switchgear, by Bolt & Nuts and tapping the joints by providing HT/Empire/PVC Tape and Copper Strip of size 50x6mm., 75mm.long, including proper tapping.
Painting of the following structure with one coat of ready mixed primer and two coats of ISI Mark Alumn. Paint after rubbing with sand paper to the surface of the structure includidng labour and T&P complete in all respect.: For Item no 17.01 to 17.05 17.01- Line Isolator Structure
Fuse Set Structure
Post Insulator, L.A.Structure
V.C.B.Structure, C.T.Structure
M.S.Frame for Cable
36. Hiring of D/G Set, including carriage, loading, unloading & operating charges (with fuel) at 33/11KV Substation under construction in case L.T.Supply is not available near S/S, within prescribed accessible limit:for Item No. 18.01 to 18.02 18.01 – 20 KVA, 3 Phase D/G Set for testing of equipments installed at Sub-station.
5 KVA, Single Phase D/G Set for testing of equipments installed at Sub-station.
Providing required No. of Technicians to work on power T/F, HT/LT Panels, during testing as assisting technical hands of test team during commissioning & energisation.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .