| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC l1 bidder |
| 2 | L2₹1.4 Cr+₹3.3 L (2.40%)Rejected-Finance PLOT NO 6 ORIES TOWER KAMTA FAIZABAD ROAD LUCKNOW UTTAR PRADESH 227105 | 227105 | ₹1.4 Cr+₹3.3 L (2.40%) | L2 | Rejected-Finance AS PER NIT |
| 3 | L3₹1.4 Cr+₹8.7 L (6.40%)Rejected-Finance ASHOK KUNJ OPPOSITE ASHOK NAGAR ROAD NO 3 HARMU RANCHI JHARKHAND 834002 | RANCHI | JHARKHAND | 834002 | ₹1.4 Cr+₹8.7 L (6.40%) | L3 | Rejected-Finance AS PER NIT |
| 4 | L4₹1.5 Cr+₹9.3 L (6.87%)Rejected-Finance GAYATRI COLONY KATHARA | KATHARA | JHARKHAND | ₹1.5 Cr+₹9.3 L (6.87%) | L4 | Rejected-Finance AS PER NIT |
Tender Value
₹1.8 Cr
EMD Value
₹2.2 L
Closing Date
28 Feb 2024, 5:00 pmClosed
HOD(TE n CM), CMPDI,RANCHI
OFFICE OF HOD(TE CM), CMPD
Design Supply construction Installation and Commissioning of 3nos of Lift 8 passenger Load 544 kg speed 1m per sec for G3 Building including Design and construction Lift shaft well and all allied electrical and civil works on turnkey basis
2024_CMPDI_300688_1
88 of 2023-24 dt.07.02.2024
Turnkey
Civil Works - Others
Item Rate
3800 days
RANCHI
Please refer Tender documents.
6 documents required · 6 mandatory
₹2.2 L
5 Jun 2024
12 Feb 2024
29 Feb 2024
13 Feb 2024
28 Feb 2024
13 Feb 2024
13 Feb 2024 - 21 Feb 2024
Amount
Item Description/ Heading
Geo-technical investigation, Laboratory test, if required, SBC for foundation design, preparation architectural drawings matching with elevation of the existing buildings, Detailed structural design by registered Structural Engineer, preparation of construction drawings etc. in all complete ( All drawings shall be approved by Engineer-in-charge) (Complete works as per scope of work in chapter-5)
Civil works including dismantling of the existing brick/RCC work, if any & construction of RCC/ Steel structures ( prior to construction, Lift well/shaft, pit etc all design/drawings should be approved by Engineer-in-charge) for erecting LIFT and dovetailing with the existing structures, it should be finished with granite wall cladding on the entrance, water proof structures, painted in matching with existing building etc in all respect including cost of all materials, labours wages etc. No extra cost will be paid. The bidders are requested to visit the site to assess the civil work involvement before offering the rates. (Complete works as per scope of work in chapter-5)
Supply, Installation, Testing and Commissioning of 1 no of Gearless elevators/Lift for 544 Kg Capacity ,8 passenger, 1 M/S speed and 5 Stoppages 5 openings as per detailed scope of work and Technical specification provided in chapter-5 cost including obtaining NOC from the local state authority, Insurance premium etc. ( fees, material, labours etc. in all complete) (Complete works as per scope of work in chapter-5)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 Ist Year after security period/warranty period of one year ((Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 2nd Year after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 3rdYear after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 4th Year after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 5th Year after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 6th Year after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 7th Year after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 8th Year after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Comprehensive maintenance contract including necessary servicing and replacement of spare parts (OEM), Insurance premium etc as per scope of work mentioned in Chapter-5 9th Year after security period/warranty period of one year (Complete works as per scope of work in chapter-5.07)
Total impact of GST for the purpose of CTC
ORIES ELEVATORS & ESCALATORS INDIA PRIVATE LIMITED
AROHI ELEVATORS PVT. LTD.
M/S VINEET ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .