| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.4 LAccepted-AOC AWAS VIKAS COLONY BUDAUN | BUDAUN | BUDAUN | ₹75.4 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹75.7 LRejected-Finance A 238 AWAS VIKAS COLONY CIVIL LINE BADAUN | BADAUN | BADAUN | UTTAR PRADESH | ₹75.7 L | L2 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹80 L
EMD Value
₹6 L
Closing Date
28 Jan 2026, 12:00 pmClosed
Superintending Engineer,
Superintending Engineer, Badaun/Pilibhit Circle, U.P. P.W.D. Bareilly
Construction of 35 Meter Rapta and Approach road of Lalpur Khadar to Maujampur road (VR) in flood-affected area under Dataganj Vidhansabha FY 2025-26.
2026_CEBLY_1107985_1
257(1)/7NividaPD-8/25-26 dt 09-01-26
Open Tender
Civil Works - Roads
60 days
Budaun
Please Refer Tender Documents
3 documents required · 3 mandatory
₹2,714
₹6 L
Yes
Bareilly
16 Mar 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
28 Jan 2026
20 Jan 2026
21 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Superintending Engineer, Badaun/Pilibhit Circle,P.W.D.,Bareilly
Name of Work: Construction of 35 Meter Rapta and Approach road of Lalpur Khadar to Maujampur road (VR) in flood-affected area under Dataganj Vidhansabha FY 2025-26.
Contact No: 257(1)/7Nivida(PD)(E.T.)-08/2025-26 Date 09.01.2026
Sl. No. Item Description (Rate are Excluding GST) Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Construction of Subgrade and earthen shoulders with apporved material obtained from borrow pits with attl ifts and leads transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2 as per Tecnical Specification Clause 303.1 0.000 Cum Excess(+) Full Conversion INR 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
2 Construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained form borrow pit with all lifts upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 and 300.2 as per Tecnical Specification Clause 301.5 0.999 Cum Excess(+) Full Conversion INR INR Twenty Six Thousand Four Hundred & Thirty Eight and Paise Forty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
3 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. 0.000 Cum Excess(+) Full Conversion INR INR One Lakh Sixty One Thousand One Hundred & Six and Paise Seventy Five Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
4 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 4.7-405(2) 0.000 Cum Excess(+) Full Conversion INR INR One Lakh Eleven Thousand One Hundred & Fifty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
5 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) 0.000 Cum Excess(+) Full Conversion INR INR One Lakh Nine Thousand Five Hundred & Seven and Paise Fifty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
6 Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at rate of 0.70- Kg/Sqm using mechanical means as per Technical Specification Clause 5.1-502. 0.000 Sqm Excess(+) Full Conversion INR INR Eleven Thousand One Hundred Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
7 Providing and applying tack coat with Bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 5.2-503(iii) 0.000 Sqm Excess(+) Full Conversion INR INR Four Thousand Seven Hundred & Ten Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
8 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of Type as per Technical Specification Clause 5.9-508 0.000 Sqm Excess(+) Full Conversion INR INR Fifty Seven Thousand Six Hundred Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
9 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 5.12-510. 0.000 Sqm Excess(+) Full Conversion INR INR Twenty Two Thousand Two Hundred Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
10 Excabation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5m and lead upto 50m as per technical specitication clause 302.3 0.999 Cum Excess(+) Full Conversion INR INR Eighty Eight Thousand One Hundred & Eighty Three and Paise Twenty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
11 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 0.000 Cum Excess(+) Full Conversion INR INR Twenty Six Lakh Ninety Six Thousand One Hundred & Forty Eight and Paise Forty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
12 Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications Clause no.600,1200&1203 0.000 Cum Excess(+) Full Conversion INR INR Twenty One Lakh Twenty One Thousand Eight Hundred & Sixty Two and Paise Fifty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
13 Struck pointing with cement mortar consisting of one part cement and 2 part of fine sand of 1.25 F.M. on brick work including supply of all material, labour and T & P etc. required for proper completionof the work. (S.I.No. 574) 0.000 Sqm Excess(+) Full Conversion INR INR Twenty Thousand Six Hundred & Sixty Two and Paise Forty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
14 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 0.000 Cum Excess(+) Full Conversion INR INR Nine Lakh Seventy Six Thousand One Hundred & Sixty and Paise Forty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
15 Supply of R.C.C. Hume Pipe NP-3 1000 mm dia 0.000 RM Excess(+) Full Conversion INR INR Eight Lakh Thirty One Thousand Six Hundred Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
16 Laying & Fixing of R.C.C. Hume Pipe (NP3) as per direction of E/I H.P.1000 mm dia NP3 0.000 RM Excess(+) Full Conversion INR INR Fifty Five Thousand One Hundred & Twenty Five Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
17 Mild Steel or iron work in rainforcment of RCC work slab for temp, rainforcement As per SI No. 504. 0.000 QTL Excess(+) Full Conversion INR INR One Lakh Seventy Two Thousand &Ninety Nine and Paise Fifty Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
18 Supply of Iron railing over causeway (SI N. 502 c) 0.000 QTL Excess(+) Full Conversion INR INR One Lakh Eight Thousand Six Hundred & Fifty Eight and Paise Ninety Only 1 Construction of chamber for 100mm sluices valve item1 10 1 Nos
Total in Figures INR Seventy Five Lakh Seventy Eight Thousand Seven Hundred & Eleven and Paise Eighty Five Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
T2.pdf
Tender Documents • 1.67 MB
BOQ_2045130.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid