Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.2 L
EMD Value
₹5,000
Closing Date
4 May 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle Agra Kakraitha Road, Near Amar Ujala Press, Sikandara , Agra
Construction of 33 KV Jal Jeevan Mission Bay at 132 KV S/S Narkhi under ETD Firozabad
2026_UPTCL_1119657_1
ET_95_ETC_A_25_26
Open Tender
Electrical Works
Lump-sum
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE_A_ETC_AGRA
₹5,000
24 Feb 2026
24 Feb 2026
5 May 2026
24 Feb 2026
4 May 2026
24 Feb 2026
Supply of Materials
Supply of PG Clamp Panther to Panther
Supply MS Flat 75x10 mm
Supply MS Flat 50x6 mm
Supply of 70KN Disc Insulator
Erection Work
Erection of Main and auxiliary structure consisting of columns, beams, peaks, masts etc. and auxiliary structure required for installation of Isolators, C.Ts. P.Ts., CVTs, L.As. and all other equipments. The job consists of shifting of all material i.e. structure parts, nuts, bolts, washers etc. from store to site of erection. erection of structure as per relevant drawing and practices using flat and spring washer with each bolt. Matching of holes, cutting matching of members if required shall also be done by the contractor without any extra cost to complete the work satisfactorily. All material to be erected shall be supplied by UPPTCL free of cost but all men, material and T&P required for satisfactorily completion of work shall be arranged by the contractor at his own cost.
CCM Coloumn Structure (02 Sets)
CGM Beem Structure (01 Sets)
EKR Coloumn Structure (02 Sets)
ALP Structure (03 Sets)
ABL Structure (03 Sets)
BBR structure (02 Sets)
Carriage of misc. items like CTs , PTs, CB, Isolators, Control cables, Conductors, M S Round bar, M S Earthing Strips etc. from designated Primary substation within 100 KM Distance to 132kv Substation Narkhi including its Loading and Unloading.
Stringing of single Panther 12 Mtrs. Jack Bus of 33 KV including fitting of Tension clamps(both side) hoisting of Isolators cutting of conductor and also shifting of all material from store to work and all other associated works required for completion of job satisfactorily as per Technical specifications.(one job for each phase for each side)
Erection of following equipments as per Instruction manual of various equipments and technical specifications including shifting of material/equipment from store to erection site including all other associated work to complete the job satisfactorily:-
36 KV VCB with structure
33 KV Bus Isolators
36 KV Line Isolator
36 KV CT Junction Box
36KV PT Junction Box
Interconnection/Jumpering work between equipments by Panther Conductor including cutting laying, fixing and proper tightening with the help of skilled labour & T&P.
Laying of Following sizes of control cable in the cable trench from various equipment to control and relay panel, marshalling boxes etc. from switchyard as per cable schedule, its saddling at every 750mm distance with M.S. saddles of size 25X3mm. Size including carriage of cable drums from store to laying site and shifting back to store and all other associated work to complete the job satisfactorily as per technical specification.
2X2.5 Sq. mm
4X2.5 Sq. mm
6X2.5 Sq. mm
Termination of following sizes of control cable with cable glands ferrules and lugs complete all erected equipments of 33KV bay at both i.e. equipments end control and relay panel/protection panel end as per site requirment. Cable gland/ferrules and lugs shall be provided by the contractor.
Cutting straightening, bending laying 500 mm below in side ground and above ground of with 75X10mm, 50X6mm size of M.S. Flat for earthing of main and auxiliary structure equipment structure,including welding with main earthmat and with object to be earthed excavaction of trenches, its back filling, painting and all other associated work as required to complete the work satisfactorily excluding the cost of M.S. Flat.
Scada Work
Integration of newly contructed 33 KV Jal Jeewan Mission Bay with IEC 61850 based SCADA system. The work includes SLD generation for feeder bay in existing HMI bay IEDS ICS files configuration database creation for new bay, event alarm geeration, interlocks and soft logics configuration and testing if any, GPS time synchronisation etc to complete the work satisfactory according to requirement of Bay Data.
Supply of Fibre Optical Multimode patch chords (each 10 mtr ) as per sample
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tech.pdf
Tender Documents • 1.02 MB
BOQ_2082112.xls
BOQ • 0.28 MB
Extn_95.pdf
PDF • 0.38 MB
Extn_95.pdf
PDF • 0.38 MB
Extn_95.pdf
PDF • 0.38 MB
Extn_95.pdf
PDF • 0.38 MB
Extn_95.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .