| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-Finance | ₹11.5 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹11.9 L+₹41,927.34 (3.65%)Accepted-Finance | ₹11.9 L+₹41,927.34 (3.65%) | L2 | Accepted-Finance L2 bidder |
| 3 | L3₹12.3 L+₹80,183.63 (6.97%)Accepted-Finance | ₹12.3 L+₹80,183.63 (6.97%) | L3 | Accepted-Finance L3 bidder |
| 4 | L6₹12.6 L+₹1.1 L (9.78%)Accepted-Finance | ₹12.6 L+₹1.1 L (9.78%) | L6 | Accepted-Finance L6 bidder |
| 5 | L7₹12.9 L+₹1.4 L (12.5%)Accepted-Finance | ₹12.9 L+₹1.4 L (12.5%) | L7 | Accepted-Finance L7 bidder |
Tender Value
₹19.3 L
EMD Value
₹19,400
Closing Date
5 Sept 2026, 1:00 pmClosed
SE RANDB KHURDA
O/o the SUPERINTENDING Engineer R and B Division, Khurda
Restoration of Jatni - Tirimal Road from Ch.0/100 to 1/900 Km Ch.1/900 to 1/928 Km and Ch.6/400 to 6/463 Km such as repair of pothole and patches and Provision of New HPC at Ch.0/600 Km.
2026_EICCL_139682_1
TCN-12-26-27
Open Tender
Civil Works - Roads
Percentage
30 days
Khordha
2 documents required · 2 mandatory
₹6,000
₹19,400
Yes
17 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
5 Sept 2026
29 Aug 2026
29 Aug 2026 - 5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Wet Mix Macadam using crushed stone aggregates as per approved drawing and technical specifications as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge. | 82.01 | cum | 2,597.79 | ₹2,13,044.76 |
| 2 | Providing and applying Primer coat with bitumen emulsion on prepared surface of granular base including cleaning road surface and applying primer at the rate of 0.60kg/sqm using emulsion pressure distributor after cleaning the surface with mechanical broom etc. complete for finished item of work as per clause 502 of MORTH specification for road and bridge work (4th.revision) as per the direction of the Engineer-in-charge including cost, conveyance, royalty and taxes of all materials labour T & P require for the work etc. complete | 823.62 | cum | 53.34 | ₹43,931.89 |
| 3 | Providing and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion @ 0.20 Kg/ Sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 3,308.76 | cum | 18.83 | ₹62,303.95 |
| 4 | Providing and laying compacted Semi Dense Bituminous Concrete (Grading-II) with Batch type Hot Mix Plant using crushed stone aggregates of specified grading, premixed with bituminous binder of 60/70 (VG-30) penetration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibtratory and tandem rollers to achieve the desired compaction as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501 & 508 of MoRT&H Specifications for Road & Bridge works (4th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge. | 99.26 | cum | 12,921.05 | ₹12,82,543.42 |
| 5 | Excavation for road work in soil with hydraulic excavator of 0.9cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment locations with all lifts & leads up to 1000m.as per approved Drawing & Technical Specifications and as per Clause - 301 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 28.6 | cum | 282.88 | ₹8,090.37 |
| 6 | Supplying, filling in foundation and plinth with sand in 22.5 cm (9") thick layers including watering and ramming with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc complete as per the direction of the Engineer-in-charge. | 22.53 | cum | 930.81 | ₹20,971.15 |
| 7 | P.C.C. M-15 Grade in foundation bed as levelling course using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 6.18 | cum | 5,743.97 | ₹35,497.73 |
| 8 | P.C.C. M-15 Grade in Substructure of structure & CD work with formwork using 40mm to 10mm size crushed stone aggregates mixed by concrete mixer, laying in layers and compacting by vibrator & all leads and lifts as per approved Drawing & Technical Specifications and as per Section -1500, 1700, 2100 & 2200 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 23.84 | cum | 6,293.6 | ₹1,50,039.42 |
| 9 | Laying Reinforced cement concrete pipe NP4 of 1000mm dia for pipe culvert on first class bedding in single row including fixing collar with cement mortar 1:2 as per approved Drawing & Technical Specifications and as per Section -2900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete. | 10 | mtr | 7,895.12 | ₹78,951.2 |
| 10 | Dismantling cement concrete of M-15 and M-20 including T&P and scaffolding wherever necessary, sorting the dismantled materials disposal of unserviceable materials and stacking the serviceable materials with all lifts and lead of 1000m etc.complete as per Clause -202 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 5.04 | cum | 662.19 | ₹3,337.44 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.89 MB
Tendernotice_1.pdf
PDF • 0.48 MB
BOQ_607473.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .