Loading…
Loading…
Tender Value
₹9.7 Cr
EMD Value
₹21.5 L
Closing Date
9 Oct 2026, 3:00 pm
Chief Engineer
Civil Engineering Division, Bhabha Atomic Research Centre, Trombay, Mumbai-400085
Replacement of old facade Jali with GRC Jali along with steel structure and associated Civil works at Mod Labs, BARC, Trombay, Mumbai- 400085.
2026_BARC_925835_1
BARC/CED/ET/40/2026-2027 Dated 11/09/2026
Open Tender
Civil Works
Item Rate
730 days
Mod Labs, BARC, Trombay, Mumbai- 400085.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹21.5 L
CED, BARC,Trombay,Mumbai
11 Sept 2026
11 Sept 2026
14 Oct 2026
11 Sept 2026
9 Oct 2026
25 Sept 2026
11 Sept 2026 - 18 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement asbestos, Celotax or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of un-serviceable materials within 100 m lead. | 8,750 | SqM | - | - |
| 2 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead. | 100 | MT | - | - |
| 3 | Dismantling old plaster / skirting carefully , raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 100 m lead. | 975 | SqM | - | - |
| 4 | Demolishing C.C / R.C.C works by mechanical means and stock piling at designated locations carefully without damaging adjacent structures and disposal of dismantled materials up to a lead of 100 m, stacking serviceable and un-serviceable materials separately including cutting reinforcement bars all as directed at site. | 100 | CuM | - | - |
| 5 | Lead charges for lead Exceeding 2 KM but not exceeding 3 KM, by mechanical transport including loading, unloading, stacking / leveling etc.Debris Beyond 2 Km but up to and including 3 km. Note: The rates in respect of this item is applicable for NET Quantities arrived at after making deduction for voids @ 30% from corresponding TRUCK Measurement. | 150 | CuM | - | - |
| 6 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. For this DSR item, please refer CPWD Specification-2019, Vol-2, Sub-Head-14. | 21,600 | SqM | - | - |
| 7 | Providing SFMC Micro concrete for strengthening of structural members including mixing, pouring, curing as per manufacturer specifications and as directed by the Engineer-in-charge. By using SFMC with 50% Quartz aggregate by weight (Only SFMC consumed alone will be measured for payment). | 1,90,000 | Kg | - | - |
| 8 | Providing & Grouting of dowel tubes / Shear keys / Joints of precast members with M-60 grade cementitious grout (Non Shrink) of approved make by suitable means ( Free flowing /pump),curing etc. Complete as per directions of Engineer-in-charge. (The payment shall be made on the basis of actual weight of approved grout injected.)
Stirrer mixed cementitious grout (non shrink) of approved make in dowel tubes / Shear keys / Joints of precast members. For this DSR item, please refer CPWD Specification-2019, Vol-2, Sub Head-23.11 | 300 | Kg | - | - |
| 9 | Providing 20 mm thick plastering using Ready mix external plastering compound of approved make for external faces of brickwork / concrete surfaces including preparation of the surface, curing, cleaning scaffolding up to 10 metres height complete.all as per specifications including forming drip moulds wherever necessary and as directed by the Engineer-in-charge. | 1,620 | SqM | - | - |
| 10 | STRUCTURAL REPAIRS WORKS WITH PRE-PACKED DUAL SHRINKAGE CONTROLLED (volume stable in wet & hardened state), single-component ready-to-use, structural grade high build, alkali-resistant, fibre reinforced, thixotropic polymer modified repair mortar having excellent bond strength to old damaged concrete structures / surfaces by the following process: 1) Removal of loose/spalled or damaged concrete by chipping and cleaning the concrete surface to open up to 20mm behind the reinforcement steel with wire brush and with clean water including removal of dirt, paint, wax, oil, grease, laitance, foreign substances, etc. Mechanically profile and prepare concrete surfaces by abrasive blasting, water jetting or other engineer approved methods. 2) Cleaning the rebars with Acetone for complete rust removal and washing with water to make the surface clean. Ensure that the concrete substrate and ambient temperatures are between (10°C and 35°C) before application. 3) Applying protective coat / bond coat using Styrene Butadiene Rubber (SBR) polymer and cement in the proportion of 1: 1 (1 part of polymer : 1 parts of cement). 4) Mixing full 25 Kg bag with clean potable water in water to product ratio of 0.12 to 0.18), mixed by heavy-duty slow speed (300 to 600 rpm) drill with spiral mixing paddle or forced action pan mixer pan for 3 minutes to achieve uniform lump free mortar consistency. 5) Applying polymer modified mortar with trowel & float. The polymer modified mortar shall have the following properties/technical parameters: (A) Properties / technical parameters of pre-packed Polymer Modified Mortar: i) Compressive strength 1 day: Min. 20 MPa (as per BS:6319 : Part 2) ii) Compressive strength 7 days: Min. 35 MPa (as per BS:6319 : Part 2) iii) Compressive strength 28 days: Min. 45 MPa (as per BS:6319 : Part 2) iv) Flexural strength in 28 days: Min. 7 Mpa (as per BS:6319 : Part 3) v) Tensile strength in 28 days: Min. 2.5 MPa (as per BS:6319 : Part 7) vi) Bond strength: Min. 5 MPa (as per ASTM : C881) vii) Water permeability: less than 1% (as per ASTM : C881) viii) Drying shrinkage in 28 days: less than 1000 microstrain (as per ASTM C 157-93) ix) Potential Alkali Reactivity - : <0.1% Expansion % (ASTM C1260) (B) Properties / technical parameters of SBR polymer bond coat material: i) Meets the requirements of BS 6319 part 2:1983 & ASTM C 190-85 standards ii) Total solids % by mass at 105°C: 38 + 1 iii) pH value: 7.5 to 9.5 iv) Specific gravity at 27.5°C: 1 to 1.05 v) Coverage: 4.2 - 4.5 sq.m/kg per coat. Notes:- (a)Placing and finishing the same with trowel / hand packing carefully compacting the same around the rebars and finishing to bring it in line with existing concrete surface on the beams, slabs, columns, etc. (b) If thickness of repair exceeds 20mm , after every 20 mm thick repair, bond coat as per process no. (3) mentioned above in the BOQ item, to be applied and further thickness of repair to be continued for each layer. (c) The surface preparation & method of application shall be as per manufacturer's technical data sheet. (d) The double tubular steel scaffolding will be paid separately in relevant item. (e) Sampling and testing of cube specimen for compressive strength test shall be as per BS 6319 - Part-2.Other tests mentioned above shall be carried out if required as per the direction of the EIC and the cost of which shall be deemed to be included in the quoted rate (f) For each batch of mortar mixed, following records, i.e Quantity of mortar (kg) mixed, Amount of water added to the mix, Location of application and the area covered.(g) Payment will be paid on the basis of actual consumption of PMM & Reinforcement will be paid in the relevant item. (h) Safety Precautions:- Use wear tight-fitting, dust-resistant, chemical splash goggles and dust respirator, if airborne dust is generated, wear protective rubber hand gloves, wear appropriate clothing to prevent any possibility of skin contact. The above item of work is inclusive of all materials, labour, machinery, tools & tackels, consumables, trasportation, loading & unloading, safety PPEs etc. all complete as directed by Engineer-in charge at site using approved pre-packed polymer modified mortar suitable for structural repair works. | 1,000 | Kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Tendernotice_2.pdf
PDF • 1.39 MB
BOQ_972917.xls
BOQ • 0.27 MB
ScheudleAET40.pdf
Tender Documents • 0.04 MB
ProformaofScheduleET40.pdf
Tender Documents • 0.07 MB
LetterofTransmittalET40.pdf
Tender Documents • 0.18 MB
JalliSketch.pdf
Tender Documents • 10.67 MB
FormAtoHTechbidET40.xls
Tender Documents • 0.13 MB
DrawingNo1.pdf
Tender Documents • 0.45 MB
DrawingNo2.pdf
Tender Documents • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .