Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAccepted-AOC C O PULOKE NEOGI SURYA SEN PALLY PO KADAMTALA 734011 DIST DARJEELING WB | KADAMTALA | DARJEELING | WEST BENGAL | 734011 | L1 | Accepted-AOC Successful Bidder | |
| 2 | L2₹46.3 L+₹1.7 L (3.85%)Rejected-Finance | L2 | Rejected-Finance Unsuccessful Bidder | |
| 3 | L3₹46.4 L+₹1.8 L (4.09%)Rejected-Finance | L3 | Rejected-Finance Unsuccessful Bidder | |
| 4 | L4₹46.5 L+₹1.9 L (4.34%)Rejected-Finance | L4 | Rejected-Finance Unsuccessful Bidder | |
| 5 | L5₹46.7 L+₹2.2 L (4.88%)Rejected-Finance KHAPRAIL BAZAR PO NEW CHAMTA DIST DARJEELING WEST BENGAL PIN 734 009 | DARJEELING | DARJEELING | WEST BENGAL | 734009 | L5 | Rejected-Finance Unsuccessful Bidder |
| Sl No | Description | Qty | Unit | M/S B K ENTERPRISE L4 | M/S SWAPAN KUNDU L6 | SHRI P P SHARMA L1 | SARKAR ENGINEERING CO. L2 | SUNIL DAS AND CO L8 | D K SARKAR L5 | M/S BIJAN CHAKRABORTY L3 | INDIA DEVELOPMENT CONSTRUCTION L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of stone/boulder masonry, laid dry including Separation of serviceable materials from the unserviceable; stacking the serviceable materials within 100m and disposal of unserviceable material, debris and rubbish to a distance n exc 100m as directed by the EIC complete all as specified and directed. | 219.75 | Cum | 880 ₹1,93,380 | 900 ₹1,97,775 | 850 ₹1,86,787.5 | 883 ₹1,94,039.25 | 885 ₹1,94,478.75 | 825 ₹1,81,293.75 Lowest | 900 ₹1,97,775 | 986 ₹2,16,673.5 |
| 2.00 | Excavation over areas n.exc 1.5m deep and getting out in Soft/loose soil complete all as specified and directed. | 70 | Cum | 525 ₹36,750 | 550 ₹38,500 | 500 ₹35,000 | 535.26 ₹37,468.2 | 555 ₹38,850 | 512 ₹35,840 | 550 ₹38,500 | 488 ₹34,160 Lowest |
| 3.00 | M&L for PCC (1:4:8) type D2 using 40 mm graded stone aggregate as in levelling course complete all as specified and directed. | 10 | Cum | 7,950 ₹79,500 | 8,000 ₹80,000 | 7,900 ₹79,000 | 8,133.24 ₹81,332.4 | 8,100 ₹81,000 | 7,820 ₹78,200 Lowest | 8,000 ₹80,000 | 7,890 ₹78,900 |
| 4.00 | M & L for Plum concrete of 40% PCC 1:3:6 using 25mm and down aggregates and 60% of boulders of (any thickness of man can handle) laid in walls complete all as specified and directed. | 463.5 | Cum | 6,300 ₹29,20,050 | 6,500 ₹30,12,750 | 6,000 ₹27,81,000 Lowest | 6,254 ₹28,98,729 | 6,345 ₹29,40,907.5 | 6,320 ₹29,29,320 | 6,100 ₹28,27,350 | 6,323 ₹29,30,710.5 |
| 5.00 | M & L for Formwork to rough finished surfaces of concrete faces of walls, retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses, etc.; vertical or to batter complete all as specified and directed. | 600 | Sqm | 820 ₹4,92,000 | 790 ₹4,74,000 Lowest | 800 ₹4,80,000 | 835.16 ₹5,01,096 | 855 ₹5,13,000 | 865 ₹5,19,000 | 920 ₹5,52,000 | 843 ₹5,05,800 |
| 6.00 | M & L for Hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface complete all as specified and directed. | 300 | Cum | 2,700 ₹8,10,000 | 2,550 ₹7,65,000 Lowest | 2,600 ₹7,80,000 | 2,651 ₹7,95,300 | 2,750 ₹8,25,000 | 2,736 ₹8,20,800 | 2,700 ₹8,10,000 | 2,697 ₹8,09,100 |
| 7.00 | M & L for 110mm dia PVC (SWR) pipe single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed. | 145.2 | RM | 620 ₹90,024 | 590 ₹85,668 | 600 ₹87,120 | 627 ₹91,040.4 | 550 ₹79,860 Lowest | 550 ₹79,860 Lowest | 680 ₹98,736 | 666 ₹96,703.2 |
| 8.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. | 9.45 | Cum | 150 ₹1,417.5 | 130 ₹1,228.5 | 140 ₹1,323 | 154.29 ₹1,458.04 | 125 ₹1,181.25 Lowest | 138 ₹1,304.1 | 270 ₹2,551.5 | 132 ₹1,247.4 |
| 9.00 | Removing excavated material (soils) exc. 250m and n exc. 500m depositing where directed at a level n. exc. 1.5m above the starting point complete all as specified and directed. | 60.55 | Cum | 440 ₹26,642 | 420 ₹25,431 Lowest | 430 ₹26,036.5 | 448.64 ₹27,165.15 | 455 ₹27,550.25 | 465 ₹28,155.75 | 520 ₹31,486 | 433 ₹26,218.15 |
| 10.00NOTES :- 1. The amount of schedule of credit shall be deducted from the total of this BOQ for arriving at contract sum. | |||||||||||
Tender Value
₹43.7 L
EMD Value
₹87,340
Closing Date
3 Sept 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF BAGDOGRA
GE AF Bagdogra Bagdogra Airport PO, Dist Darjeeling, WB - 734421
URGENT REPAIR TO PLUM WALL IN BAGORA PUMP HOUSE UNDER PARA 35 AT AF STN KURSEONG UNDER GE (AF) BAGDOGRA
2025_MES_727106_1
8659/E8
Open Tender
Civil Works
Item Rate
270 days
Kurseong AF Stn
As per NIT
10 documents required · 10 mandatory
₹500
GE AF BAGDOGRA
₹87,340
Yes
25 Sept 2025
21 Aug 2025
5 Sept 2025
21 Aug 2025
3 Sept 2025
28 Aug 2025
Amount
Demolition of stone/boulder masonry, laid dry including Separation of serviceable materials from the unserviceable; stacking the serviceable materials within 100m and disposal of unserviceable material, debris and rubbish to a distance n exc 100m as directed by the EIC complete all as specified and directed.
Excavation over areas n.exc 1.5m deep and getting out in Soft/loose soil complete all as specified and directed.
M&L for PCC (1:4:8) type D2 using 40 mm graded stone aggregate as in levelling course complete all as specified and directed.
M & L for Plum concrete of 40% PCC 1:3:6 using 25mm and down aggregates and 60% of boulders of (any thickness of man can handle) laid in walls complete all as specified and directed.
M & L for Formwork to rough finished surfaces of concrete faces of walls, retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses, etc.; vertical or to batter complete all as specified and directed.
M & L for Hardcore of gauge n exc. 63 mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface complete all as specified and directed.
M & L for 110mm dia PVC (SWR) pipe single socketed in any length with rubber ring joints fixed to walls complete all as specified and directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed.
Removing excavated material (soils) exc. 250m and n exc. 500m depositing where directed at a level n. exc. 1.5m above the starting point complete all as specified and directed.
NOTES :- 1. The amount of schedule of credit shall be deducted from the total of this BOQ for arriving at contract sum.
SARKAR ENGINEERING CO. (BID ID -3413892)
M/S BIJAN CHAKRABORTY (BID ID -3413911)
M/S B K ENTERPRISE (BID ID -3412148)
D K SARKAR (BID ID -3413767)
M/S SWAPAN KUNDU (BID ID -3413459)
INDIA DEVELOPMENT CONSTRUCTION (BID ID -3414802)
SUNIL DAS AND CO (BID ID -3415261)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .