| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC | ₹6.0 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.1 Cr+₹7.6 L (1.27%)Rejected-Finance 41 B I BAZAR NEW CANTT ALLAHABAD PRAYAGRAJ 211001 UTTAR MBL 9415216113 | ₹6.1 Cr+₹7.6 L (1.27%) | L2 | Rejected-Finance L2 |
| 3 | L3₹6.2 Cr+₹21.2 L (3.54%)Rejected-Finance | ₹6.2 Cr+₹21.2 L (3.54%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical B 2 JAI INDUSTRIES INDUSTRIAL ESTATE UTRAULA ROAD DISTRICT BALRAMPUR | BALRAMPUR | BALRAMPUR | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Priya Construction L1 | Ms Highway Construction co L2 | M/s Chopra Traders L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C within a lead of 30 m. S.I No. 251 | 1,428.78 | Cum | 55 ₹78,582.9 Lowest | 60 ₹85,726.8 | 60 ₹85,726.8 |
| 2.00 | Construction of granular sub-base by providing coarse graded Material, mixing in a mechanical mix plant of OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 in a compacted layer of 100mm functioning as drainage layer. | 1,351.6 | Cum | 4,400 ₹59,47,040 Lowest | 4,470 ₹60,41,652 | 4,600 ₹62,17,360 |
| 3.00 | Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam specified including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 308 | Cum | 5,000 ₹15,40,000 Lowest | 5,220 ₹16,07,760 | 5,500 ₹16,94,000 |
| 4.00 | Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement+3.50% Emulsion in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 350 | Cum | 9,100 ₹31,85,000 Lowest | 9,161 ₹32,06,350 | 9,200 ₹32,20,000 |
| 5.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. | 166.4 | Cum | 14,000 ₹23,29,600 Lowest | 14,088 ₹23,44,243.2 | 15,200 ₹25,29,280 |
| 6.00 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 1,302.7 | Cum | 5,900 ₹76,85,930 Lowest | 5,937 ₹77,34,129.9 | 6,100 ₹79,46,470 |
| 7.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 3,061.35 | Cum | 10,000 ₹3,06,13,500 Lowest | 10,092 ₹3,08,95,144.2 | 10,300 ₹3,15,31,905 |
| 8.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 9,076 | Cum | 300 ₹27,22,800 Lowest | 305 ₹27,68,180 | 300 ₹27,22,800 Lowest |
| 9.00 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.on BM surface. | 1,765.5 | Sqm | 10 ₹17,655 Lowest | 10 ₹17,655 Lowest | 10 ₹17,655 Lowest |
| 10.00 | Providing and laying dence graded bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder@ 4.0 to 4.5% by weight of total mix and filler, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per morth specification clause 507 complete in all respects. | 66.33 | Cum | 12,700 ₹8,42,391 Lowest | 12,750 ₹8,45,707.5 | 13,000 ₹8,62,290 |
Tender Value
₹6.0 Cr
EMD Value
₹11.8 L
Closing Date
4 Nov 2025, 12:00 pmClosed
SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Widening and strengthening work Farenda Jarwal Road (NH-330) of km 150 on the right side via Block Headquarters Bus Stand NH 730 (Jharkhandi Temple)
2025_CEDPW_1082542_1
4275/2Com(B)-Gonda Circle/25-26 dt 29.9.2025
Open Tender
Civil Works
Item Wise
365 days
BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
₹11.8 L
Yes
GONDA
11 Aug 2026
14 Oct 2025
4 Nov 2025
14 Oct 2025
4 Nov 2025
14 Oct 2025
15 Oct 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clay or sand) including lift upto 1.5 m. lead upto 50m and dressing of sides and rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C within a lead of 30 m. S.I No. 251 | 1,428.78 | Cum | 55.5 | ₹79,297.29 |
| 2 | Construction of granular sub-base by providing coarse graded Material, mixing in a mechanical mix plant of OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 in a compacted layer of 100mm functioning as drainage layer. | 1,351.6 | Cum | 4,470 | ₹60,41,652 |
| 3 | Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam specified including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 308 | Cum | 5,220 | ₹16,07,760 |
| 4 | Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement+3.50% Emulsion in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 350 | Cum | 9,161 | ₹32,06,350 |
| 5 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. | 166.4 | Cum | 14,088 | ₹23,44,243.2 |
| 6 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 1,302.7 | Cum | 5,937 | ₹77,34,129.9 |
| 7 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 3,061.35 | Cum | 10,092 | ₹3,08,95,144.2 |
| 8 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 9,076 | Cum | 306 | ₹27,77,256 |
| 9 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.on BM surface. | 1,765.5 | Sqm | 10.35 | ₹18,272.93 |
| 10 | Providing and laying dence graded bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder@ 4.0 to 4.5% by weight of total mix and filler, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per morth specification clause 507 complete in all respects. | 66.33 | Cum | 12,750 | ₹8,45,707.5 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_1982594.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.11 MB
BIDDocument.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .