Dy. Commandant (Engr), SHQ (Bglr))
Dy. Commandant (Engr), SHQ (Bglr), Sundarhalli, PO-Jangamakote, Taluk- Sidlaghatta
C/O Boundary wall with main gate guard Room 4 nos sentry post at Tilda campus of 38 BN ITBP Raipur
2026_ITBP_903957_1
ITBP/Engr/Tender/2026-53 Dtd 25.03.26
Open Tender
Civil Works
Item Rate
365 days
Tilda campus, 38 Bn, ITBP
As per tender
3 documents required · 3 mandatory
₹0
₹9.9 L
17 Apr 2026
28 Mar 2026
18 Apr 2026
28 Mar 2026
17 Apr 2026
28 Mar 2026
28 Mar 2026 - 17 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing jungle including uprooting ofrank vegitation, grass, brush wood, trees and saplings of girth upto 30 cm meassurred at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | |||||
| 2Excavation work in foundation trenches or drains not exceeding 1.5 m in width or 10 sqm on plan including dresing of sides and ramming of bottoms lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed , within a lead of 50 m. All kind of soil | |||||
| 3Filling available excavated earth (excluding rocks) in plinth side of foundation, under floors in layers not exceeding 20 cm in depth including, watering, ramming consolidating and dressing completed lead up to 50 m and lift up to 1.5 m, | |||||
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | |||||
| 5Centering and shutturing inclusive strutting, proping etc and removal of form work for all heights Foundations, footings, bases of columns, etc. for mass concrete | |||||
| 6Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform. | |||||
| 7Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | |||||
| 8Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | |||||
| 9Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
| 10Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | |||||
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.29 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tendernotice_2.pdf
PDF • 20.06 MB
BOQ_950143.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .