Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Fee/PreQual/Technical/Finance | -25.28% | ₹3.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹20,125.96 (6.73%)Admitted-Fee/PreQual/Technical/Finance | -20.25% | ₹3.2 L+₹20,125.96 (6.73%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-tender rejected as EMD not paid through online mode |
Tender Value
₹4 L
EMD Value
₹12,000
Closing Date
4 Aug 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Construction of off take of vail khul m/o Kati canal B/w/o cement concrete and crate protection works at Brail.
2026_IFC_315823_1
enit03of072026
Open Tender
Civil Works
Percentage
25 days
Budgam
Please refer Tender documents.
6 documents required · 6 mandatory
₹300
Chief Engineer Kmr I and FC Deptt.
₹12,000
6 Aug 2026
14 Jul 2026
5 Aug 2026
14 Jul 2026
4 Aug 2026
14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 121.71 | cum | 187.3 | ₹22,796.28 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 40.57 | cum | 592.9 | ₹24,053.95 |
| 3 | Hand-packing stones in wire-crates; excluding cost of stones | 119.71 | cum | 371.15 | ₹44,430.37 |
| 4 | Dumping stone excluding cost of stones. in Horizontal on level | 2.63 | cum | 237.9 | ₹625.68 |
| 5 | Supplyof stone soling (nallah) nominal size 225 mm | 122.34 | cum | 700 | ₹85,638 |
| 6 | supply of crates mesh (including mechnical transport) | 5,760 | sft | 20.5 | ₹1,18,080 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.1 | cum | 6,591.25 | ₹20,432.88 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 23.6 | cum | 218.4 | ₹5,154.24 |
| 9 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking.
Stone boulder avg. lead of 14 km from Beerwah | 122.34 | cum | 389.91 | ₹47,701.59 |
| 9.1 | 20 mm Aggregate avg. lead of 08 kms | 2.8 | Cum | 247.72 | ₹693.62 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.55 MB
BOQ_1026377.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .