Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.0 Cr+₹2.0 L (2.01%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
5 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Addl. Collector/ Project Director, DRDA, DPI
DRDA, Dharmapuri
Dharmapuri District - Upgradation / Strengthening of the road 4 Nos. in Package No. TN04-04 MGSMT / 2022-2023 Dharmapuri Block P04
2023_RDTN_301329_1
Roc.No.1231/2023/R2 Dt.03.04.2023 MGSMT P04
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹1.0 L
13 Jul 2023
12 Apr 2023
5 May 2023
12 Apr 2023
5 May 2023
12 Apr 2023
Amount
Strengthening of the road from HPDT (H-D) Road to Sevathankotai road Via - Gandhipalayam road Km.0/0-0/500 (Plastic Waste)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking the Existing BT Surface wornout Surface including all labour charges etc
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 203.1 (Carted Earth)
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
Supply and Fixing of HM Stone
Provision for Sign Board Charges
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strengthening of the road from Noolahalli Higher Secondary School to Perumalkovil Kottai (Via) Kollakottai road Km.0/0-0/960 (Plastic Waste)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking the Existing BT Surface wornout Surface including all labour charges etc
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 203.1 (Carted Earth)
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
Provision for Name Board
Supply and Fixing of HM Stone
Provision for Sign Board Charges
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strengthening of the road from Mukkalnaickanpatty to Kamittankottai (Via-Nariyankottai) road Km.0/0-1/100
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking the Existing BT Surface wornout Surface including all labour charges etc
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 203.1 (Carted Earth)
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SSI for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregatesof specified grading, premixed with bituminous binder @ 5.4 to 5.6 percent by weight of tottal mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H specifications clause 507 complete in all respects
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
CC Pavement
Cement Concrete 1:2:4 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc Complete,
CC Pavement
Bitumen Pad
Supply and Fixing of HM Stone
Supply and Fixing of KM Stone
Provision for Name Board
Provision for Sign Board Charges
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
Strengthening of the road from Reddiyur to Aavalnaickanampatty road Km.0/0-0/750 (Plastic Waste)
Clearing Scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Picking the Existing BT Surface wornout Surface including all labour charges etc
Consturciton of subgrade and earthern shoulders with approved materiasl obtained from borrwo pits with all lifts and leads, transporting to site, spreading, grading required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per Technical Specification Caluse 203.1 (Carted Earth)
Collection and supply of Gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete
Providing and laying water bound macadam 75 mm conscidated thickenss with Grade III metal using 1.00 cum of 63 mm to .11.20 mm IRC size HBG Metal with 0.24 cum of Gravel for blindage per 10 Sqm. Including cost and coveyance of all materials to work site and stacking them at the site to departmental gauge for pre-measurement and labour charges for spreading metal and gravel, hand packing to camber, watering with all loads for water and compaction by 80.100 km power roller including hire charges and fuel charges for power employed including necessary earthern bund to protect edges, lighting, guarding, barricadings and maintenance of diversion etc. complete as per clause 404 of most Specification.
Providing & Laying Tack coat 4 kgs / 10 Sqm over the WBM surface treated with using 4 kgs of Bituminous Emulsion for 10 sqm area including cost of Bitumen emulsion, including labour for applying the required Qty. of Bitumen Emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of Most specifications.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 13.432Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
Provision for Name Board
Supply and Fixing of HM Stone
Provision for Sign Board Charges
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Shanmuga Builders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .