| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 LAccepted-AOC 205 IIND PHASE INDUSTRIAL AREA BARMER 344001 | BARMER | BARMER | RAJASTHAN | 344001 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹18.5 L+₹95,700 (5.46%)Rejected-Finance | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹19.0 L+₹1.5 L (8.66%)Rejected-Finance NEAR RAILWAY STATION UTARLAI BARMER RAJASTHAN PIN 344001 | BARMER | RAJASTHAN | 344001 | L3 | Rejected-Finance Other than lowest | |
| 4 | L4₹19.7 L+₹2.2 L (12.4%)Rejected-Finance MAHAVEER NAGAR BARMER RAJASTHAN 344001 MAHAVEER NAGAR BARMER RAJASTHAN 344001 | BARMER | RAJASTHAN | 344001 | L4 | Rejected-Finance Other than lowest | |
| 5 | L5₹20.9 L+₹3.4 L (19.4%)Rejected-Finance 2 EVEREST VIHAR PT T N MISHRA MARG NIRMAN NAGAR JAIPUR 302019 | JAIPUR | RAJASTHAN | 302019 | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | National Rewinding Works L1 | Rasam Engg Co. L5 | RAMDEV ENTERPRISES L2 | KRISHNA CONSTRUCTION COMPANY L6 | M/s Sati Jasnath Enterprises L4 | M/S TANUSHREE CONSTRUCTION COMPANY L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches, not exc 1.5 m wide and n. exc 1.5 m depth, or n exc 10 Sqm on plan and n exc 1.5 m in depth for foundations, shafts, wells, cesspits, manholes, pier holes, for foundations of poles, struts, stays etc. or laying underground cable and water supply pipe lines etc. in soft/loose soil, & getting out including taking out old brick or precast cable cover complete all as specified and directed by Engineer-in-Charge. | 348 | Cubic Metre | 100 ₹34,800 | 150 ₹52,200 | 200 ₹69,600 | 185 ₹64,380 | 80 ₹27,840 Lowest | 230 ₹80,040 |
| 2.00 | Returning, filling in, including spreading, leveling watering and well ramming in layers n.exc 25 cm in soft/loose soil/complete all as specified and directed by Engineer-in-charge. | 321 | Cubic Metre | 50 ₹16,050 | 50 ₹16,050 | 50 ₹16,050 | 40 ₹12,840 | 13 ₹4,173 Lowest | 95 ₹30,495 |
| 3.00 | Removal of excavated soil material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified and directed by Engineer-in-charge. | 27 | Cubic Metre | 50 ₹1,350 | 50 ₹1,350 | 50 ₹1,350 | 60 ₹1,620 | 23 ₹621 Lowest | 100 ₹2,700 |
| 4.00 | S&F 15mm bore galvanized steel water tubing medium grade with & including all fittings and fixed complete to walls and ceilings or laid in floors / trenches including taking up or down old u/s GI tubing with all connections complete all as specified and directed by Engineer-in-charge. | 250 | RM | 150 ₹37,500 Lowest | 245 ₹61,250 | 170 ₹42,500 | 180 ₹45,000 | 150 ₹37,500 Lowest | 185 ₹46,250 |
| 5.00 | All as per Srl item No 4 above but 20 mm dia bore. | 585 | RM | 180 ₹1,05,300 Lowest | 260 ₹1,52,100 | 180 ₹1,05,300 Lowest | 220 ₹1,28,700 | 200 ₹1,17,000 | 220 ₹1,28,700 |
| 6.00 | All as per Srl item No 4 above but 25 mm dia bore. | 460 | RM | 220 ₹1,01,200 Lowest | 350 ₹1,61,000 | 290 ₹1,33,400 | 285 ₹1,31,100 | 304 ₹1,39,840 | 280 ₹1,28,800 |
| 7.00 | All as per Srl item No 4 above but 40 mm dia bore. | 380 | RM | 340 ₹1,29,200 Lowest | 435 ₹1,65,300 | 350 ₹1,33,000 | 350 ₹1,33,000 | 500 ₹1,90,000 | 450 ₹1,71,000 |
| 8.00 | All as per Srl item No 4 above but 50 mm dia bore. | 750 | RM | 490 ₹3,67,500 Lowest | 500 ₹3,75,000 | 620 ₹4,65,000 | 650 ₹4,87,500 | 620 ₹4,65,000 | 500 ₹3,75,000 |
| 9.00 | All as per Srl item No 4 above but 80 mm dia bore. | 380 | RM | 890 ₹3,38,200 | 840 ₹3,19,200 | 800 ₹3,04,000 Lowest | 880 ₹3,34,400 | 980 ₹3,72,400 | 900 ₹3,42,000 |
| 10.00 | Supplying, laying, jointing, commissioning and testing 100mm bore centrifugally cast (Spun) ductile iron pressure pipe with spigot and socketed ends class K-7, confirming to IS : 8329/2000 blast furnace slag cement with portland cement properties suitable for rubber gasket jointing / tyton joints with inside cement mortar lining and black bitumen external coating, duly (ISI marked) laid in trenches including taking up or down old u/s GI tubing with all connections complete all as specified and directed by Engineer-in-charge.
Note :- (i) DI fittings shall be measured and paid separately under respective items
(ii) Pipes shall be laid in trenches already excavated for taking out old GI pipe line. Extra excavation / earthwork shall not be paid. | 265 | RM | 1,400 ₹3,71,000 | 1,250 ₹3,31,250 | 1,000 ₹2,65,000 Lowest | 1,500 ₹3,97,500 | 1,500 ₹3,97,500 | 1,200 ₹3,18,000 |
Tender Value
₹19.4 L
EMD Value
₹39,000
Closing Date
2 Mar 2026, 6:00 pmClosed
GE (AF) Utarlai
GE (AF) Utarlai PB No. 11 Barmer 344001
SPECIAL REPAIR REPLACEMENT OF OLD WATER PIPELINES AT AF STN UTARLAI
2026_MES_751988_1
8684/E8
Open Tender
Civil Works
Item Rate
270 days
Utarlai
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) Utarlai
₹39,000
Yes
11 Apr 2026
9 Feb 2026
3 Mar 2026
10 Feb 2026
2 Mar 2026
23 Feb 2026
stage.html
html • 0.06 MB
technical_842252.pdf
techsummary_842252.pdf
finance_842252.pdf
BOQ Comparative Chart
xlsx
finsummary_842252.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tenderdocument.pdf
Tender Documents • 0.62 MB
BOQ_842252.xls
BOQ • 0.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .