Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | ₹16.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹17.1 LRejected-Finance | ₹17.1 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | AJAY KUMAR TIWARI L1 | MD SABIR ALI L2 |
|---|---|---|---|---|---|
| 1.008 no Dip haulage. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Transportation of one Tugger haulage drum with base frame from surface to pit top, lowering to pit bottom and then transportation upto 38 no. golai | 24 | Manshift | 1,280.95 ₹30,742.8 | 1,290 ₹30,960 |
| 1.02 | transportation of the same from 38 no. golai to 8D/57L at R-V seam and placing | 24 | Manshift | 1,280.95 ₹30,742.8 | 1,290 ₹30,960 |
| 1.03 | Transportation of one 45 kW motor from surface to the site | 20 | Manshift | 1,280.95 ₹25,619 | 1,290 ₹25,800 |
| 1.04 | Dismantaling of 19 mm haulage rope from the reel of length 350 mtr. | 12 | Manshift | 1,280.95 ₹15,371.4 | 1,290 ₹15,480 |
| 1.05 | Again making reel of the rope and carrying to pit top lowering to pit bottom and transportation upto 38 no. golai | 24 | Manshift | 1,280.95 ₹30,742.8 | 1,290 ₹30,960 |
| 1.06 | Transportation of the rope from 38 no. golai to the 8D/57L | 24 | Manshift | 1,280.95 ₹30,742.8 | 1,290 ₹30,960 |
| 1.07 | Laying and fitting of the rope in the drum | 24 | Manshift | 1,280.95 ₹30,742.8 | 1,290 ₹30,960 |
| 1.08 | Installation of haulage | 24 | Manshift | 1,280.95 ₹30,742.8 | 1,290 ₹30,960 |
| 1.09 | Transportation of 35 sqmm. Power cable of length 250 mtr. from workshop to the site forfeeding power supply in the haulage. | 32 | Manshift | 1,280.95 ₹40,990.4 | 1,290 ₹41,280 |
Tender Value
₹16.9 L
EMD Value
₹21,200
Closing Date
19 Jan 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Installation of Tugger Haulages for K12 Depillaring panels of RV seam of Khottadih colliery under Pandaveswar Area
2026_ECL_350918_1
GM-PND/EandM/25-26/243/1271 dated 07/01/2026
Open Tender
Electrical and Maintenance Works
30 days
Khottadih Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹21,200
6 Mar 2026
9 Jan 2026
20 Jan 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
9 Jan 2026 - 12 Jan 2026
8 no Dip haulage. (Inclusive of EPF/CMPF)
Transportation of one Tugger haulage drum with base frame from surface to pit top, lowering to pit bottom and then transportation upto 38 no. golai
transportation of the same from 38 no. golai to 8D/57L at R-V seam and placing
Transportation of one 45 kW motor from surface to the site
Dismantaling of 19 mm haulage rope from the reel of length 350 mtr.
Again making reel of the rope and carrying to pit top lowering to pit bottom and transportation upto 38 no. golai
Transportation of the rope from 38 no. golai to the 8D/57L
Laying and fitting of the rope in the drum
Installation of haulage
Transportation of 35 sqmm. Power cable of length 250 mtr. from workshop to the site forfeeding power supply in the haulage.
Transportation of starter and ACB from surface workshop to pit top than lowering to pit bottom and then transportation upto 38 no. golai
transportation of starter and ACB from 38 no. golai to 8D/57L at R-V seam and placing
Transportation and installation of lightening panel , light, signaling bell, signaling unit, signaling wire(throghout haulage route)
71L haulage. (Inclusive of EPF/CMPF)
Transportation of one Tugger haulage drum with base frame from surface to pit top, lowering to pit bottom and then transportation upto 38 no. golai
transportation of the same from 38 no. golai to 8D/57L at R-V seam
transportation of the same from 8D/57L to 6D/71L at R-V seam and placing
Transportation of one 45 kW motor from surface to the site
Dismantaling of 19 mm haulage rope from the reel of length 350 mtr.
Again making reel of the rope and carrying to pit top lowering to pit bottom and transportation upto 38 no. golai
Transportation of the rope from 38 no. golai to the 8D/57L
Transportation of same rope from 8D/57L to 6D/71L
Laying and fitting of the rope in the drum
Installation of haulage
Transportation of 35 sqmm. Power cable of length 250 mtr. from workshop to the site forfeeding power supply in the haulage.
Transportation of starter and ACB from surface workshop to pit top than lowering to pit bottom and then transportation upto 38 no. golai
Transportation of starter and ACB from 38 no. golai to 8D/57L at R-V seam and placing
Transportation of starter and ACB from 8D/57L to 6D/71L at R-V seam and placing
Transportation and installation of lightening panel , light, signaling bell, signaling unit, signaling wire(throghout haulage route)
K12 panel face haulage. (Inclusive of EPF/CMPF)
Installation of one more haulage at K12 face which remain approx same as 71L haulage
Supply of GI Wire
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_363665.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid