| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance 87 31 BOSE PUKUR ROAD KOLKATA 700042 | KOLKATA | WEST BENGAL | 700042 | ₹2.0 L | L1 | Accepted-Finance QUOTED LOW |
| 2 | L2₹2.0 LRejected-Finance 119 A 1 BAGHAJATIN REGENT ESTATE SOUTH 24 PARGANAS KOLKATA WEST BENGAL 700092 | KOLKATA | WEST BENGAL | 700092 | ₹2.0 L | L2 | Rejected-Finance QUOTED HIGER THAN L1 |
| 3 | L3₹2.1 LRejected-Finance | ₹2.1 L | L3 | Rejected-Finance QUOTED HIGER THAN L2 |
Tender Value
₹2.0 L
EMD Value
₹6,000
Closing Date
11 Feb 2026, 1:00 pmClosed
OFFICE OF EE(CIVIL)
THE KOLKATA MUNICIPAL CORPORATION 97 AND 98 GARFA MAIN ROAD
MAINTENANCE OF DAMAGED CEMENT CONCRETE ROAD AT SLUM AREA AT 25/5P.M SARANI AND OTHERS IN W/NO 106.
2026_KMC_999136_1
KMC/EEC/BRXII/106/095/25-26/US
Open Tender
CIVIL WORKS
40 days
BOROUGH XII
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
30 Mar 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
11 Feb 2026
4 Feb 2026
Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specifications Clause 202 for Rural Roads of MORD. (I) By Manual Means b) Cement Concrete ( Ref :PWD (Rds & Brdgs)-2018, It. No. 2.05 Page No.233)
Labour for taking out old soling edging including removing debris. (a) Single flat soling ( Ref :PWD (Bldg.)-2017, It. No. 15, Page No. 230)
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.05 Page No.245 & page-222 sl. No-4)
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1)
Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. ( Ref :PWD (Bldg.)-2017, It. No. 2, Page No. 14)
Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. ( Ref :Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6) and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13))
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety ( Ref :PWD (Bldg.)-2017, page-24 (item -4(a), consumption chart pg-B-60, sl-1 and Annexture-II , Format-A, 3rd Corrigenda & addenda p-10 dtd-04.06.2018, PWD(R&B) 2018, Chapter-1, pg-227 I-1.03, pg-230,Table-I , Table III-2 pg-226, )
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
FORM-106_095.pdf
Tender Documents • 0.58 MB
PREQUE.pdf
Additional Documents • 0.17 MB
BOQ_2446892.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid