Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹6.8 LAccepted-AOC 223 4TH STREET SIVANANDHAPURAM SARAVANAMPATTI PO COIMBATORE 641 035 | COIMBATORE | TAMIL NADU | 641035 | ₹6.8 L | l1 | Accepted-AOC EVALUATED L1 BIDDER |
| Sl No | Description | Qty | Unit | ssk builders L1 |
|---|---|---|---|---|
| 1.00 | Clearing Scrub jungles with uprooting, disposed from the site as per the direction of site engineer including cost of all labour, lead, lift, etc., complete. | 90 | sqm | 5 ₹450 Lowest |
| 2.00 | Dismantling of Brick Masontry in Cement Mortar, Clearing away and carefully stacking materials usefull for re use for any thickness of walls including cost of T&Ps, Labour, lead, lift etc., complete. | 18 | cum | 250 ₹4,500 Lowest |
| 3.00 | Dismantling of RCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | 1.4 | cum | 300 ₹420 Lowest |
| 4.00 | Dismantling of PCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | 13 | cum | 200 ₹2,600 Lowest |
| 5.00 | Dismantling of floor finish & dadooing wall with tiles/slabs, etc., clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | 49 | sqm | 100 ₹4,900 Lowest |
| 6.00 | Dismantling of pressed tiles & weathering course, clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | 121 | sqm | 100 ₹12,100 Lowest |
| 7.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders. | 40 | cum | 200 ₹8,000 Lowest |
| 8.00 | Supplying and filling with M.Sand for foundation, Basement,etc., including cost of material, labour, lead, lift, consolidation, etc., complete. | 1.4 | cum | 1,000 ₹1,400 Lowest |
| 9.00 | PCC 1:3:6 using 20mm HBG metal for foundation, basement including cost of all materials, labour, lead, lift, etc. complete. | 13.4 | cum | 5,500 ₹73,700 Lowest |
| 10.00 | RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. | 0.3 | cum | 11,000 ₹3,300 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,850
Closing Date
26 Mar 2026, 2:00 pmClosed
SE/TIRUPPUR EDC
O/o The Superintending Engineer/Tirupur EDC/, TNPDCL, 208/650, KRBS Towers, IIIrd Floor, Perumanallur Road, Tiruppur-02
Renovation and improvement works to the existing Control Room building at Velampalayam 33/11 KV Substation including flooring rectification, renewal of weathering course and allied civil works
2026_EB_673504_1
WOT-CIVIL-16-2025-2026
Open Tender
Civil Works
Works
150 days
VELAMPALAYAM
please refer tender specification
2 documents required · 2 mandatory
₹0
₹6,850
Yes
29 Jul 2026
12 Mar 2026
27 Mar 2026
12 Mar 2026
26 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Scrub jungles with uprooting, disposed from the site as per the direction of site engineer including cost of all labour, lead, lift, etc., complete. | - | sqm | - | - |
| 2 | Dismantling of Brick Masontry in Cement Mortar, Clearing away and carefully stacking materials usefull for re use for any thickness of walls including cost of T&Ps, Labour, lead, lift etc., complete. | - | cum | - | - |
| 3 | Dismantling of RCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | 1 | cum | - | - |
| 4 | Dismantling of PCC, Clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | - | cum | - | - |
| 5 | Dismantling of floor finish & dadooing wall with tiles/slabs, etc., clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | - | sqm | - | - |
| 6 | Dismantling of pressed tiles & weathering course, clearing away malba including cost of T&Ps, Labour, lead, lift etc., complete. | - | sqm | - | - |
| 7 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders. | - | cum | - | - |
| 8 | Supplying and filling with M.Sand for foundation, Basement,etc., including cost of material, labour, lead, lift, consolidation, etc., complete. | 1 | cum | - | - |
| 9 | PCC 1:3:6 using 20mm HBG metal for foundation, basement including cost of all materials, labour, lead, lift, etc. complete. | - | cum | - | - |
| 10 | RCC 1:1.5:3 using 12-20mm HBGS with formwork including cost of all materials, centering, curing, all labour charges, lead, lift, etc., complete. But excluding cost of steel reinforcement. | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_809492.xls
BOQ • 0.43 MB
SPEC16.pdf
Tender Documents • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].