Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 3 | L2₹1.4 Cr+₹14.2 L (11.1%)Admitted-Finance JORHAT | ₹1.4 Cr+₹14.2 L (11.1%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Aklanta Bora L1 | Sri Tapan Lahon L2 | Sri Ranjit Saikia L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle
(a) Slab Culvert At AAU | 0.02 | Hect | 12,000 ₹240 Lowest | 48,193.5 ₹963.87 | 43,373.32 ₹867.47 |
| 2.00 | Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle
(b) Habungia Road | 0.17 | Hect | 12,000 ₹2,040 Lowest | 48,192.58 ₹8,192.74 | 43,373.32 ₹7,373.46 |
| 3.00 | Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle
(c ) Samannoy Path | 0.12 | Hect | 12,000 ₹1,440 Lowest | 48,192.58 ₹5,783.11 | 43,373.32 ₹5,204.8 |
| 4.00 | Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle
(d) Nandanpur path-II | 0.14 | Hect | 12,000 ₹1,680 Lowest | 48,192.58 ₹6,746.96 | 43,373.32 ₹6,072.26 |
| 5.00 | Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle
(e) Sonalipur Path | 0.11 | Hect | 12,000 ₹1,320 Lowest | 48,192.58 ₹5,301.18 | 43,341.05 ₹4,767.52 |
| 6.00 | Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle
(f) Juvenile Jail Road | 0.18 | Hect | 12,000 ₹2,160 Lowest | 48,192.58 ₹8,674.66 | 43,373.32 ₹7,807.2 |
| 7.00 | Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle
(g) Sundarpur Path | 0.09 | Hect | 12,000 ₹1,080 Lowest | 48,192.58 ₹4,337.33 | 43,373.32 ₹3,903.6 |
| 8.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(a) Slab Culvert At AAU | 411.7 | Cum | 120 ₹49,404 Lowest | 260.58 ₹1,07,280.79 | 234.52 ₹96,551.88 |
| 9.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(b) Habungia Road | 768.99 | Cum | 120 ₹92,278.8 Lowest | 260.58 ₹2,00,383.41 | 234.52 ₹1,80,343.53 |
| 10.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(c ) Samannoy Path | 152.79 | Cum | 120 ₹18,334.8 Lowest | 260.58 ₹39,814.02 | 234.52 ₹35,832.31 |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
23 Nov 2020, 2:00 pmClosed
Chief Engineer, PWD (Roads), Assam,Chandmari, Ghy
O/O the Chief Engineer, PWD (Roads), Assam,Chandmari,Guwahati 781003
SOPD_SIG_20_21_08 CImprovement/Construction (i) Slab Culvert at AAU (ii) Habungia Road (iii) Samannoy path at AAU (iv)Nandanpur path-II, Ajanta Hall (v) Sonalipur Path, Khoragaruah (vi) Last portion of Juvenile Jail Road, Lichubari (vii) Sundarpur Pa
2020_PWD_19050_5
CE/DEV/TB/164/2020-21/03
Open Tender
Civil Works
Item Rate
270 days
Jorhat
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,300
Yes
Empowered Officer, ASRB
₹2.8 L
Yes
Chief Engineer, PWD (Roads), Assam,Chandmari, Ghy
24 Dec 2020
21 Oct 2020
23 Nov 2020
21 Oct 2020
23 Nov 2020
28 Oct 2020
21 Oct 2020 - 11 Nov 2020
27 Oct 2020
Amount
Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle (a) Slab Culvert At AAU
Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle (b) Habungia Road
Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle (c ) Samannoy Path
Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle (d) Nandanpur path-II
Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle (e) Sonalipur Path
Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle (f) Juvenile Jail Road
Cleaning and grubbing road land including uprooting wild vegetation, grass, brushes, shrubs, spallings and trees girth upto 30mm, removal of slumps of such trees cut earlier and disposal of unserviceable matreials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic not exceeding 150mm in thickness as per clause 201.1 i) By Manual Means (A) In area of non thorny jungle (g) Sundarpur Path
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (a) Slab Culvert At AAU
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (b) Habungia Road
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (c ) Samannoy Path
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (f) Juvenile Jail Road
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (g) Sundarpur Path
Construction of Subgrade and Earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 3002.2 with lead upto 1000m as per Technical specification clause 303.1 (From Private Land) (a) Slab Culvert At AAU
Construction of Subgrade and Earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 3002.2 with lead upto 1000m as per Technical specification clause 303.1 (From Private Land) (b) Habungia Road
Construction of Subgrade and Earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 3002.2 with lead upto 1000m as per Technical specification clause 303.1 (From Private Land) (c ) Samannoy Path
Construction of Subgrade and Earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 3002.2 with lead upto 1000m as per Technical specification clause 303.1 (From Private Land) (d) Nandanpur path-II
Construction of Subgrade and Earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 3002.2 with lead upto 1000m as per Technical specification clause 303.1 (From Private Land) (e) Sonalipur Path
Construction of Subgrade and Earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 3002.2 with lead upto 1000m as per Technical specification clause 303.1 (From Private Land) (f) Juvenile Jail Road
Construction of Subgrade and Earthen shoulders with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 3002.2 with lead upto 1000m as per Technical specification clause 303.1 (From Private Land) (g) Sundarpur Path
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical specification clause 401. For Grading II material (a) Slab Culvert At AAU
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical specification clause 401. For Grading II material (b) Habungia Road
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical specification clause 401. For Grading II material (c ) Samannoy Path
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical specification clause 401. For Grading II material (d) Nandanpur path-II
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical specification clause 401. For Grading II material (e) Sonalipur Path
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical specification clause 401. For Grading II material (f) Juvenile Jail Road
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC and compacting with smooth wheel roller to achieve the desired density, complete as per Technical specification clause 401. For Grading II material (g) Sundarpur Path
WBM Grading 3 (Using crushable screening such as moorum gravel for Gr.III) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (a) Slab Culvert At AAU
WBM Grading 3 (Using crushable screening such as moorum gravel for Gr.III) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (b) Habungia Road
WBM Grading 3 (Using crushable screening such as moorum gravel for Gr.III) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (c ) Samannoy Path
WBM Grading 3 (Using crushable screening such as moorum gravel for Gr.III) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (d) Nandanpur path-II
WBM Grading 3 (Using crushable screening such as moorum gravel for Gr.III) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (e) Sonalipur Path
WBM Grading 3 (Using crushable screening such as moorum gravel for Gr.III) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (f) Juvenile Jail Road
WBM Grading 3 (Using crushable screening such as moorum gravel for Gr.III) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. (A) By Manual Means (g) Sundarpur Path
Inter locking concrete Block pavement (i) Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge block/ Edge restraints (a) Slab Culvert At AAU
Inter locking concrete Block pavement (i) Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge block/ Edge restraints (b) Habungia Road
Inter locking concrete Block pavement (i) Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge block/ Edge restraints (c ) Samannoy Path
Inter locking concrete Block pavement (i) Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge block/ Edge restraints (d) Nandanpur path-II
Inter locking concrete Block pavement (i) Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge block/ Edge restraints (e) Sonalipur Path
Inter locking concrete Block pavement (i) Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge block/ Edge restraints (f) Juvenile Jail Road
Inter locking concrete Block pavement (i) Providing and laying interlocking concrete block pavement (M40) having thickness 80mm as per technical specification clause 1504 complete including carriage. (a) Including Edge block/ Edge restraints(g) Sundarpur Path
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (A) By Manual means (b) Habungia Road
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (A) By Manual means (c ) Samannoy Path
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (A) By Manual means (d) Nandanpur path-II
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (A) By Manual means (e) Sonalipur Path
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (A) By Manual means (f) Juvenile Jail Road
Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (A) By Manual means (g) Sundarpur Path
HPC 600MM dia (b) Habungia Road Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Bedding of pipe (B) Type B (First Class) Bedding ii Laying (First Class) bedding on well compacted approved granular material as per Clause 1105 (ii)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600 mm dia
HPC 600MM dia (c ) Samannoy Path Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Bedding of pipe (B) Type B (First Class) Bedding ii Laying (First Class) bedding on well compacted approved granular material as per Clause 1105 (ii)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600 mm dia
HPC 600MM dia (f) Juvenile Jail Road Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Bedding of pipe (B) Type B (First Class) Bedding ii Laying (First Class) bedding on well compacted approved granular material as per Clause 1105 (ii)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600 mm dia
HPC 600MM dia (g) Sundarpur Path Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Bedding of pipe (B) Type B (First Class) Bedding ii Laying (First Class) bedding on well compacted approved granular material as per Clause 1105 (ii)
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. 600 mm dia
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I) Ordinary soil Upto 3 m depth (d) Nandanpur path-II
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I) Ordinary soil Upto 3 m depth (e) Sonalipur Path
Laying ( First Class) bedding on well compacted sand, mooram as per clause 1105 (ii) (ii) Grannular material (d) Nandanpur path-II
Laying ( First Class) bedding on well compacted sand, mooram as per clause 1105 (ii) (ii) Grannular material (e) Sonalipur Path
Providing and laying RCC. Pipe NP-3 for culvert on first class bedding of grannular materials in single rows ( c ) 600mm Dia. NP-3 (d) Nandanpur path-II
Providing and laying RCC. Pipe NP-3 for culvert on first class bedding of grannular materials in single rows ( c ) 600mm Dia. NP-3 (e) Sonalipur Path
Earth work in cushoning (d) Nandanpur path-II
Earth work in cushoning (e) Sonalipur Path
(a) Slab Culvert At AAU 5m x 5m Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil (B) Mechanical means (II) With dewatering (i) Upto 3 m height
Sand Filling in Foundation Trenches as per Drawing & Technical Specification
Back filling behind abutment, wing wall and return wallcomplete as per drawing and Technical specification (B)Sandy material
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser A PCC Grade M15
Plain/Reinforced cement concrete, in open foundation complete as per drawing and technical specification including steel shuttering formwork. (N) Without plasticiser A PCC Grade M15
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N) without plasticiser, (E) RCC M25, (a) Height upto 5.0m, Case I : Using concrete mixer
Supplying, fitting and placing TMT bar reinforcement in sub-structure complete as per drawing and technical specifications (c) With other make ISI marked TMT rebar
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Drainage Spouts complete as per drawing and Technical specification
Providing and laying curtain walls complete as per drawing and technical specification Clause 1304 iii Cement concrete grade M 10
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301
Aklanta Bora
Sri Tapan Lahon
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.31 MB
Tendernotice_2.pdf
PDF • 4.62 MB
Tendernotice_3.pdf
PDF • 0.11 MB
BOQ_29501.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .