Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Rejected-Technical HOJAI | ASSAM | 782446 | Rejected-Technical bidder secured less than 70 marks |
| 2 | Rejected-Technical 9A BYELANE 7 PUB SARANIA PO SILPUKHURI PS CHANDMARI KAMRUP M PIN 781003 | KAMRUP METRO | ASSAM | 781003 | Rejected-Technical bidder secured less than 70 marks |
| 3 | Rejected-Technical HOUSE NO 80 1 NO SALBARI 1 NO SALBARI PO NOONMATI PS NOONMATI KAMRUP METRO PIN 781020 | KAMRUP METRO | ASSAM | 781020 | Rejected-Technical bidder secured less than 70 marks |
| 4 | Rejected-Technical VILL P O HOJAI P S DIST HOJAI PIN 782435 | HOJAI | HOJAI | ASSAM | 782435 | Rejected-Technical bidder secured less than 70 marks |
Tender Value
₹81.2 L
EMD Value
₹1.6 L
Closing Date
6 Apr 2026, 11:00 amClosed
Executive Officer
Hojai Municipal Board
Construction of Boundary wall, concrete bed or Windrows pad, Drain and remaining work for the construction of Covered Shed for Transfer Station, Adarsha Bazar, ward No 18, Hojai Town for smooth processing of Garbage under Solid waste management
2026_UDD_51990_1
HMB/T-04/2026
Open Tender
Civil Works
Item Rate
180 days
Adarsha Bazar, Main Road
Having Experience in similar nature of works
3 documents required · 3 mandatory
₹2,500
₹1.6 L
Yes
2 Jul 2026
13 Mar 2026
6 Apr 2026
13 Mar 2026
6 Apr 2026
13 Mar 2026
13 Mar 2026 - 19 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part- A (Boundary wall) | |||||
| 1.01 | EARTHWORK IN EXCAVATION
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavatedearth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge.
All kinds of soil | 1 | cum | 205.45 | ₹205.24 |
| 1.02 | Refilling of excavated earth at foundation
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1 | cum | 253.95 | ₹253.7 |
| 1.03 | Sand filling at base of foundation
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | cum | 2,161.2 | ₹2,159.04 |
| 1.04 | Cement Concrete Work (Cast in Situ) PCC
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | 6,326.05 | ₹6,319.72 |
| 1.05 | RCC Work
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | cum | 8,364.2 | - |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 10,185.05 | ₹10,174.86 |
| 1.07 | Form Work
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 1 | sqm | 307.95 | ₹307.64 |
| 1.08 | Form Work
Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1 | sqm | 608.35 | ₹607.74 |
| 1.09 | Form Work
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | 804.25 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
cancelled_1.pdf
pdf • 1.29 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
Tendernotice_2.pdf
PDF • 0.79 MB
BOQ_82356.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .