Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance N A | L1 | Accepted-Finance Responsive | |
| 2 | L2₹4.5 L+₹9,095.64 (2.06%)Accepted-Finance N A | FARIDABAD | HARYANA | 121004 | L2 | Accepted-Finance Responsive | |
| 3 | L3₹6.1 L+₹1.6 L (37.2%)Accepted-Finance | L3 | Accepted-Finance Responsive | |
| 4 | L4₹6.5 L+₹2.1 L (47.2%)Accepted-Finance | L4 | Accepted-Finance Responsive | |
| 5 | Rejected-Technical | - | Rejected-Technical NON RESPONSIVE |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
28 Nov 2019, 12:00 pmClosed
ER. FIRDOUS AHMED QAZI
O/o DGM, UNIT I, JKHOUSING BOARD, JAMMU
Construction/Repair of drains in sector 1,2,3 and 4 and allied works in Housing Colony kathua
2019_HAUDD_85588_5
E NIT No- 03 Dt-06-11-2019
Open Tender
Civil Works
Item Rate
60 days
KATHUA
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Yes
DGM Housing board Unit-I
₹13,000
Yes
5 Sept 2020
12 Nov 2019
29 Nov 2019
12 Nov 2019
28 Nov 2019
12 Nov 2019
Amount
Earthwork in Excavation by manual means in trenches for foundations, drains, pipes, cable etc(Not Exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge, disposed earth is to be levelled and neatly dressed in all kind of soil (Detail enclosd in SBD as Annexure- E item- 1)
Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work ypto plinth level (1:4:8) 1 cement:4 coarse sand:8 graded stone aggreagate 40mm nominal size (crusher) (Detail enclosd in SBD as Annexure- E item- 2)
Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work ypto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher) (Detail enclosd in SBD as Annexure- E item- 3)
Cement concrete flooring 1:2:4 (1 cement: 2 coarse sand:4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry but excluding the cost of nosing of steps etc. complete: 50mm thick with 20 mm nominal size stone aggregate crushed (Detail enclosd in SBD as Annexure- E item- 4)
Reinforced cement concrete in walls any thickness inlcuding attached plaster, buttresses, plinth and string courses fillets, columns, pillar, piers, abutments, posts and struts etc upto floor five level excluding the cost of shuttering and centring finishing & reinforcement (1:1.5:3) 1 cement:1.5 coarse sand:3 graded stone aggreagate 20mm nominal size (Detail enclosd in SBD as Annexure- E item- 5)
Reinforcement for RCC work including Straightening, cutting, Bending, and placing in position all complete: Thermo-mechanically treated bars (Detail enclosd in SBD as Annexure- E item- 6)
15mm cement plaster on rough side of single or half brick wall of mix 1:6 mix (1 cement:6 fine sand) (Detail enclosd in SBD as Annexure- E item- 7)
centring and shuttering including strutting, propping etc and removal of form for foundations, footings, bases of column etc for mass concrete (Detail enclosd in SBD as Annexure- E item- 8)
centring and shuttering including strutting, propping etc and removal of form for suspended floors, roofs, landing, balconies and access platform (Detail enclosd in SBD as Annexure- E item- 9)
Consupmtion of Material and Carriage (To be Paid as per actual during execution)
Carriage of Sand av. 10 KM by M.T
Carriage of Stone Agg.(40mm) av. 10 KM by M.T
Carriage of Stone Agg.(20mm) av. 10 KM by M.T
Measurable quantitiesmay vary at the time of actual execution of the work and shall be allowed as per actual with in the estimated cost.
PAWAN KUMAR
AMAR SINGH CONTRACTOR
RAM BHAROSA
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .