Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Required documents submitted |
| 2 | Accepted-Technical | Accepted-Technical Required documents submitted |
| 3 | Accepted-Technical | Accepted-Technical submitted the required documents |
| 4 | Rejected-Technical | Rejected-Technical Required documents not submitted |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
13 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer(BP)
Panchayat Union Office Sivagangai
CONSTRUCTION OF OPEN COMMUNITY HALL AT ARASANIMUTHUPATTI VILLAGE AND PANCHAYAT
2026_RDTN_720140_1
SVG_MPLACDS 26 27 CONS OF OPEN COMMUNITY HALL AT ARASANIMUTHUPATTI PT
Open Tender
Civil Works
Item Rate
180 days
Panchayat Union Office Sivagangai
CONSTRUCTION OF OPEN COMMUNITY HALL AT ARASANIMUTHUPATTI VILLAGE AND PANCHAYAT
2 documents required · 2 mandatory
₹0
₹15,000
16 Nov 2026
30 Oct 2026
13 Nov 2026
30 Oct 2026
13 Nov 2026
30 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF OPEN COMMUNITY HALL AT MUTHUPATTI SRI SAKTHI MURUGAN KOVIL NEAR IN ARASANI MUTHUPATTI PANCHAYAT | - | - | - | - |
| 2 | Earthwork excavation in all classes of soil with initial lead & lift as per SS 20A | 40.04 | M3 | - | - |
| 3 | CC 1:4:8 mix using 40mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 14.96 | M3 | - | - |
| 4 | Filling the basement with gravel including cost and conveyance of all materials and all labour charges etc complete. | 42.19 | M3 | - | - |
| 5 | Brick work in cement mortar 1:5 mix using country brick including cost and conveyance of all materials charges etc completed | 21.41 | M2 | - | - |
| 6 | Supplying fabrication and placing in position of steel rod for reinforcement including cost of steel binding wire etc completed | 1,053.88 | M3 | - | - |
| 7 | Supplying and fabrication of steel Truss including cost and conveyance of all materials and labour charges etc complete | 1,199.62 | M2 | - | - |
| 8 | RCC 1:1.5:3 mix using 20mm metal including all cost & conveyance of all materials to site & all labour charges etc complete | 19.16 | M3 | - | - |
| 9 | Providing centering & shuttering charges for pcc plain surface cost of country wood plank including all cost & conveyance and all labour charges etc | 114.3 | M3 | - | - |
| 10 | Supplying and erecting for sides and soffits including supports and strutting upto 3.29M height for plane surfaces in all floor is with all cross bracings using mild steel sheets of size 90cm x 60cm and 10
gauges a stiffened welded with mixed steel angles of | 36.7 | M3 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_864805.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .