| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹6.0 L (4.08%)Admitted-Finance | ₹1.5 Cr+₹6.0 L (4.08%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Balamurugan S L1 | P.SIVAPERUMAL - individual L2 |
|---|---|---|---|---|---|
| 1.00Strengthening the road from Mohanur Rasipuram road to Akkiyampatty to Erumapatty road Km 0/0-0/5 & 1/5-5/15 | |||||
| 2.00Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. In area of thorny jungle | |||||
| 3.00 | KM 0/000 - 5/150 | 14,760 | Sqm | - | - |
| 4.00PICKING BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | |||||
| 5.00 | KM 0/000 - 5/150 | 5,187.5 | Sqm | - | - |
| 6.00Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | |||||
| 7.00 | KM 0/000 - 0/500 | 67.5 | Cum | - | - |
| 8.00 | KM 1/500 - 2/000 | 67.5 | Cum | - | - |
| 9.00 | KM 2/000 - 3/000 | 135 | Cum | - | - |
| 10.00 | KM 3/000 - 4/000 | 135 | Cum | - | - |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
15 Jun 2020, 3:00 pmClosed
Project Director
DRDA, Namakkal
1 road work at Sendamangalam Block in Namakkal District under PMGSY III Batch I Package No.TN 10-188
2020_RDTN_92513_1
TN10188
Open Tender
Civil Works - Roads
Piece-work
180 days
Sendamangalam
Class I
3 documents required · 3 mandatory
₹0
₹3.1 L
Yes
22 Jun 2020
15 May 2020
15 Jun 2020
15 May 2020
15 Jun 2020
22 May 2020
Amount
Strengthening the road from Mohanur Rasipuram road to Akkiyampatty to Erumapatty road Km 0/0-0/5 & 1/5-5/15
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. In area of thorny jungle
PICKING BT Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Filling with Cut Earth)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pit Earth)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)
WET MIX MACADAM Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired density
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502
TACK COAT
Providing and applying tack coat with Bitumen emulsion (RS-1)using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surface treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503
CONTROL SECTION
PREMIX CARPET Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510
Provision of Rumble strips with premix Bituminous carpet
Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Providing and fixing Name Board
Providing and Fixing Logo of PMGSY Project
Providing and Fixing Citizen information Board of PMGSY Project
Providing and fixing of Maintenance Board
Providing and fixing cautionary mondatory and informatory sign board
90cm Equilateral triangle (Cautionary) sign board
60cm circular (Mandatory) sign board
Chevron signs 90cm octagon (curves)
Reflector
Road Marking with hot applied hermoplastc Compound with Reflectorising Glass Beads on Bituminous Surface
Kilometre Stone - Reinforced Cement Concrete M15 grade Kilometre Stone / Local Stone of standard design as per IRC : 8 fixing in position including painting and printing etc as per drawing and Technical Specification Clause 1703 (III) 200 m stone (Precast)
i) Ordinary Kilometer stone (Precost)
ii) 200 m stone (precast)
iii) Guard stone (precast)
Retaining wall
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
CH 2950-3000 (Left Side)
CH 3000- 3010 (Left Side)
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
CH 2950-3000 (Left Side)
CH 3000- 3010 (Left Side)
Cement concrete 1:2.5:5 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
CH 2950-3000 (Left Side)
CH 3000- 3010 (Left Side)
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Below Sill)
CH 2950-3000 (Left Side)
CH 3000- 3010 (Left Side)
Cement concrete 1:2:4 mix using HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. (Above Sill)
CH 2950-3000 (Left Side)
CH 3000- 3010 (Left Side)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
CH 2950-3000 (Left Side)
CH 3000- 3010 (Left Side)
Construction of Un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 15.1.2.2 M30 (grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.20 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formworm (Steel Channel, Laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing, spreading the concrete with shovesls, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contractiona nd expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabls for 14 days using curing compound (where speficied) and water finished to lines and grade as per drawing and Technical Specification clause 1501
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
P.SIVAPERUMAL - individual
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
41-188.pdf
Tender Documents • 0.90 MB
BOQ_158582.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .