Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
7 Dec 2026, 4:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer, PR, Wanaparthy
wanaparthy
Construction of multi purpose Indoor stadium(Badminton,Kabaddi with Sitting Structure,Table Tennis,Boxing Hall etc) at Kothakota Municipality, Wanaparthy District.Est.Cost Rs.200.00 Lakhs
749857
NIT No. 57/2026-27,Dt:08.10.2026 of the Regional Officer,PR Wanaparthy(1st call)
OPEN
Civil Engineering Works
WANAPARTHY, TELANGANA
16 documents required · 16 mandatory
₹9,254
₹1.6 L
20 Nov 2026
20 Nov 2026
20 Nov 2026
90 days
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges and contractors profit & over heads but excluding GST & seignorage charges etc., complete. for Mechanical Means Upto 3.0mts Depth
Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand(unscreened)) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for Foundation and Basement (APSS No. 601 )
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges (excluding seignorage charges) hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for footings
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Pedastals
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Plinth Beams
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for columns in GF
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for columns in FF
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for columns in SF
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for roof beams in GF
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for roof beams in FF
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for roof beams in SF
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Lintels
Reinforced Cement Concrete M 20 Nominal Mix ( by weigh batching/concrete mixer ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Sun shades
Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including Cost and Conveyance of bars from approved sources to site of work with all taxes including Cost and Conveyance of binding wire, cover blocks chains, overlaps, spacess, dowels, wastage etc, and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors
Brick masonry in superstructure with CM (1:6) prop mix using Fly Ash cement solid Bricks 290X225x140 mm from approved source having minimum crushing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)
Brick masonry in superstructure with CM (1:6) prop mix using Fly Ash cement solid Bricks 290X225x140 mm from approved source having minimum crushing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)
Brick masonry in superstructure with CM (1:6) prop mix using Fly Ash cement solid Bricks 290X225x140 mm from approved source having minimum crushing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary
Providing Mild steel flats and bars for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, all operational, incidental, and labour charges such as cutting, bending, placing in position etc., but excluding GST for finished item of work (APSS No.126) in all floors. For window grills, staircase railing & Compound wall grills etc
Providing truss with hollow MS tubes of all diameters for Rafters, Purlins and tie beam including cost and conveyance of all materials, fabricating charges and erection charges etc., complete for finished item of work.
Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat / Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat / Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding doors with mesh shutter provision – (2-glass shutters)- 95 –Series duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.20 mm for outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.20 mm for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be coextruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of Patio/Bent espagulate .the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work
Supply and fixing of pre-painted steel top hung and fixed louvered ventilators made of pre -painted steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint & 4 mm pinhead glass for ventilators with EPDM Gasket with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6 pitch complete for finished item of work for (i) Ventilators: Fixed louvers 2'-0 x 2'-0(609.6x609.6mm)(Box section) outer frame section size of 33 x 56 mm and (ii) Ventilators:Fixed louvers 4'-0 x 2'-0 (1219.2 x 609.6 mm) (Box section) outer frame section size of 33 x 56mm Mullion section size of 33 x 56 mm and (iii) Ventilators: Fixed louvers 4'-0 x 3'-0 (1219.2 x914.4 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after thourughly brushing the surface to remove all dirt and remains of loose powered materials, including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Supply and laying of 25mm dia medium grade P.V.C.pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in wall with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metallic deep box including all labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding GST.
Wiring with 2 runs of 14/0.3mm (1.0Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete including contractors profit and over head charges etc complete but excluding cost of VAT for finished item of work for light, bell, fan and exhaust fan points in Non-Residential Buildings
Supply and fixing of 6A ISI mark Flush type switch of makes Anchor / Gold Medal Olive / Million Zoom with 6A 3/2 pin wall plug socket of Anchor / Gold Medal Olive / Million Zoom make on a common switch board with earth connections in surface / consealed wiring including cost and conveyance of all materialsa and labour charges but excluding GST.
Supply and run of 2 of 36/0.3mm (2.5 sqmm) FRLS / HFFR PVC insulated ISI Copper cable of makes Polycab / Havells / Gold medal /Fortune art /L&T/ HPL in existing metallic / non-metallic conduit pipe for mains including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.
Supply and fixing 8 Way SPN Distribution board with IP-43 protection (Metal Door) suitable for 1 No. 40 A single phase ELCB / RCCB/DP Isolator as incomer and 8 Nos. 6-32 A 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete Makes :Legrand / Schneider / Siemens / L&T / Cabtree Xpro / ABB / C&S
Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia B class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.
Supply and fixing 4 way TPN Distribution board horizontal with IP-20 protection of make Standard / Havells / HPL / Toyoma suitable for three phase 40A Four pole Isolator of make Standard / Havells / HPL / Toyoma as incomer and 10kA single pole miniature circuit breakers twelve numbers (12 Nos) as out going with internal connections including cost and conveyance of all materials to site, labour charges for surface / flush mounting etc., sales tax complete for finished item of work.
Supply and fixing of 1200mm Sweep Ceiling fan controlled by one switch &Electronic Regulator of 300 Watts step type and Concealed PVC fan hook box etc complete as required.
Supply and fixing of Modular Stepped type Electronic Regulator with Cover Frame with fixing accessories etc., including labour charges complete as required confirming to IS.(independent)
Supply and transportation and fixing of 22W +/ 10% , >/ 2300 lumens, 1200 mm (+/- 10%) length LED light housing made with alluminium anodised body, wide operating voltage with PF≥0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI≥80 etc., complete with 5 years warranty with BIS Certification with BIS Certification.LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies including Patty type frame and all labour charges
Supply and fixing of Supply and transportation of ..40W....... LED Street light Body made of high grade pressure die – cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover / temperature protective custom molded polycarbonate diffuser, Thermal shock and impact resistant IK07 fixed to the housing by SS screws Suitable lense on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >120 lumens / watt, with Ingress protection IP66, BIS approved Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / CROMPTON / BAJAJ / Surya / Ecolink / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / Capart / Fortune Arrt / Goldwyn / Panasonic / GM / Goldmedal / Silicon / Orient / HPL / Valmont / Transrail / Bee - Lite / Accent LED MAKE : Philips Lumileds / Cree / Nichia / Osram / Samsung / LG LEDs.
Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (2 in 1) duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth connections and all labour charges etc., complete
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
Plain Cement Concrete corresponding to M 7.5 grade as per IS 456 equivalent to (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand(unscreened)) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for Foundation and Basement (APSS No. 601 )
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for FOOTINGS
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for For Pedastals F1
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Plinth Beam
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for COLUMNS
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Roof Beam
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Roof Slab 125 mm thick
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Lintels
Brick masonry in superstructure with CM (1:6) prop mix using Fly Ash cement solid Bricks 290X225x140 mm from approved source having minimum crushing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
Dadooing to walls with Procelien vitirfied tiles 8-10 mm 400x400 of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) in All Floors
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat / Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat / Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls
Providing thermo mechanically treated (TMT) /HYSD reinforcement (Fe-500/550D grade as per IS 1786-2008of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding other taxes and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge, manufacturer’s specification & drawing for finished item of work.
Supply and fixing of pre-painted steel top hung and fixed louvered ventilators made of pre -painted steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint & 4 mm pinhead glass for ventilators with EPDM Gasket with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6 pitch complete for finished item of work for (i) Ventilators: Fixed louvers 2'-0 x 2'-0(609.6x609.6mm)(Box section) outer frame section size of 33 x 56 mm and (ii) Ventilators:Fixed louvers 4'-0 x 2'-0 (1219.2 x 609.6 mm) (Box section) outer frame section size of 33 x 56mm Mullion section size of 33 x 56 mm and (iii) Ventilators: Fixed louvers 4'-0 x 3'-0 (1219.2 x914.4 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm
Providing and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.
Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge, manufacturer’s specification & drawing for finished item of work.
Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item of work.
Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.
Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for finished item of work
Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but withoutfittings & base support for tanks
Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished item of work
S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931
S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 135 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc, and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc complete for finished item of work as directed by Engineer-in-charge
S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 135 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc, and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc complete for finished item of work as directed by Engineer-in-charge
S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 135 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc, and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc complete for finished item of work as directed by Engineer-in-charge
Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sqcm Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etccomplete for finished item of work at all floor levels (APSS No 1302 1319 & 1326)
Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sqcm Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etccomplete for finished item of work at all floor levels (APSS No 1302 1319 & 1326)
Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm including cost and conveyance of all materials and labour charges etc., complete for finished item of work
Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
Wiring with run of 2 of 14/0.3mm (1.0 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable ( 100V grade as perIS:694/1990 ) of KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art make in existing pipe with 6A 1 Way flush type(Modular) Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega, Ceiling rose 3 Plate of makes Anchor / Gold Medal Olive / Million Zoom. and Supply of Decolam Board of Size 8" x 10" as switch control box including cost and conveyance of all material and all labour charges but excluding VAT etc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding GST.
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections etc., complete. Makes of wires : Finolex / RR Kabel / Havells / KEI / L&T / Polycab / HPL / RPG / Power flex / GM / Million / Gold Medal. Makes of switches: GM Four-Five / Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus/ Cabtree Verona/ Million logus / Gold Medal Curve.
Supply and fixing of 16A 3pin / 6A 3pin ISI mark Flush type plug Modular socket with 16 Amps flush type Switch Socket combined (2 in one) of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega make duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with 3mm thick hylam sheet including earth connections and cost and conveyance of all material and all labour charges etc., complete, but excluding GST.
Supply and Transportation of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing with VPIT Chokes and all standard accessories of makes Crompton / Bajaj / HPL / Surya / Havells. including condensor, starters etc., and 1No 36/40W LED tube light of makes Surya / Havells / HPL / Fortune Art etc., complete and including cost and conveyance of all material, all labour charges
Supply and run of 3 of 2.5 sq.mm (36/0.3mm) (phase, neutral and earth) FRLS / HFFR PVC insulated flexible copper cable in existing conduit pipe for individual lighting circuits including labour charges etc., complete as required for switch boards. Makes of wires : Finolex / RR Kabel / Havells / KEI / L&T / Polycab / HPL / RPG / Power flex / GM / Million / Gold Medal.
Supply, Transportation and Fixing of 9"(225mm), Light duty exhaust fan with double ball bearing and wire guard etc complete of makes Crompton / Bajaj Bahar WG / Havells Ventil Air-DS / Orient hill air. Make exhaust / Fresh Air fan with metallic body and blades including making hole in wall and masonary work and all labour charges etc. including cost and conveyance of all material and labour charges but excluding GST & other taxes.
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
Plain Cement Concrete corresponding to M 7.5 grade as per IS 456 equivalent to (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand(unscreened)) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for Foundation and Basement (APSS No. 601 )
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for FOOTINGS
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Pedastals F1
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Plinth Beam
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for COLUMNS
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Roof Beam
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Roof Slab 125 mm thick
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. work for Lintels
Brick masonry in superstructure with CM (1:6) prop mix using Fly Ash cement solid Bricks 290X225x140 mm from approved source having minimum crushing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering-Sunshades
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
Flooring with vitrified tiles of 1st quality and of size not less than 600 x 600 mm x 8 mm thickness glossy finish double charged permium colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding GST and seignorage charges.
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat / Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat / Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls
Providing thermo mechanically treated (TMT) /HYSD reinforcement (Fe-500/550D grade as per IS 1786-2008of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding other taxes and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
Providing and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.
Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58- 60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge, manufacturer’s specification & drawing for finished item of work.
Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision – (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work
Painting to new iron work with 2 coats of synthetic enamel paint of approved brand and shade over a prime coat with red oxide primer making three coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges including overhead charges & Contractors profit but excluding VAT and seigorage charges etc. complete for finished item of work as per APSS No.1212
Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe concealed in wall with all required PVC / Metallic Junction Boxes including masonary work and labour charges etc., Makes : Sudhakar / GM / Modi / Million Plast.
Wiring with run of 2 of 14/0.3mm (1.0 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable ( 100V grade as perIS:694/1990 ) of KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art make in existing pipe with 6A 1 Way flush type(Modular) Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega, Ceiling rose 3 Plate of makes Anchor / Gold Medal Olive / Million Zoom. and Supply of Decolam Board of Size 8" x 10" as switch control box including cost and conveyance of all material and all labour charges but excluding VAT etc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding GST.
Supply and fixing of 6A ISI Mark 3/2 pin Modular socket with 6A 1way Modular switch, 3 Module box with cover frame and GI switch box on common switch board with connections etc., complete. Makes of wires : Finolex / RR Kabel / Havells / KEI / L&T / Polycab / HPL / RPG / Power flex / GM / Million / Gold Medal. Makes of switches: GM Four-Five / Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus/ Cabtree Verona/ Million logus / Gold Medal Curve.
Supply and fixing of 16A 3pin / 6A 3pin ISI mark Flush type plug Modular socket with 16 Amps flush type Switch Socket combined (2 in one) of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega make duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with 3mm thick hylam sheet including earth connections and cost and conveyance of all material and all labour charges etc., complete, but excluding GST.
Supply and run of 3 of 2.5 sq.mm (36/0.3mm) (phase, neutral and earth) FRLS / HFFR PVC insulated flexible copper cable in existing conduit pipe for individual lighting circuits including labour charges etc., complete as required for switch boards. Makes of wires : Finolex / RR Kabel / Havells / KEI / L&T / Polycab / HPL / RPG / Power flex / GM / Million / Gold Medal.
Supply and Transportation of 1 x 36/40W Box type tube light luminaire powder coated CRCA sheet steel housing with VPIT Chokes and all standard accessories of makes Crompton / Bajaj / HPL / Surya / Havells. including condensor, starters etc., and 1No 36/40W LED tube light of makes Surya / Havells / HPL / Fortune Art etc., complete and including cost and conveyance of all material, all labour charges
Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories.
Supply and fixing of Electronic Regulator of Modular of Anchor Roma make duly fixing on existing block including giving connections cost of all accessories and all labour charges etc., complete.
Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
Plain Cement Concrete corresponding to M 7.5 grade as per IS 456 equivalent to (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
Fixing of Brick on edge around the play fields to protect the soil against erosion in the play areas as directed by the Engineer-In-Charge, including cost of materials, labour charges for fixing, seigniorage charges, transportation, over heads & contractor's profit etc. complete.
Collection, supply, stacking, spreading and compaction of gravel as per the directions of the Engineer-in-Charge, from approved quarry including cost and conveyance, of materials, seigniorage charges, stacking, spreading in layers, compacting with three wheeled static roller upto desired density, over head charges & contractors profit etc. complete.
Collection, Supply, spreading and compaction of the soil like Clay or silty sand or combination of these materials. The material shall be free from organic or other deleterious constituents. At the time of compaction the water content of the material should not vary from optimum moisture content(O.M.C) by more than @ +/- 2%. Expansive clays and other unsuitable materials as in Cl.305.2.1.1 of MOST specifications booklet shall not be allowed. Rate includes cost and conveyance, seigniorage charges, stacking, spreading in desired layers and compaction with three wheeled roller upto desired density etc as directed by the Engineer-in-Charge etc complete for finished item of work.
S & F 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 with GI fittingssuch as elbows tees couplings, nipples, plugsincluding excavation for trenches and refilling thetrenches complete except for GI bends union and GIconnectors with checkout and socket Tata or Zenithmake or equivalent. TBSP-G.I-12 S.n 418
S & F 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 with GI fittingssuch as elbows tees couplings, nipples, plugsincluding excavation for trenches and refilling thetrenches complete except for GI bends union and GIconnectors with checkout and socket Tata or Zenithmake or equivalent. TBSP-G.I-12 S.n 418 -25mm Dia G.i Pipe(Horizontals)
Supply and delivery and stretching of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2½"x2½" (63 mm x 63 mm) - 8 Gauge for fenicing including of all C/C charges
Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labor charges etc., complete for finished item of work for Foundation of Building. (APSS No. 308) -mechanical means
Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand (Natural sand 50%+Manufactured sand(Rock Sand)50% ) , coarse aggregate water etc., to site , on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
Brick masonry in superstructure with CM (1:6) prop mix using 23x11x7 cm burnt clay bricks from approved source having minimum crushing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand (50% of Natural sand +50% of Manufactured sand(Rock Sand), water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
Providing thermo mechanically treated (TMT) /HYSD reinforcement (Fe-500/550D grade as per IS 1786-2008of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding other taxes and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308)
Supplying and Filling of SAND in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310).finished item of work. (APSS NO. 309 & 310).
Plain Cement Concrete corresponding to M 7.5 grade as per IS 456 equivalent to (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost, conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, excluding cost of steel and its fabrication charges for finished item of work with minimum 400 Kgs /cum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. RCC Wall
VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost, conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, excluding cost of steel and its fabrication charges for finished item of work with minimum 400 Kgs /cum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete for finished item of work. -Roof Slab
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
Providing thermo mechanically treated (TMT) /HYSD reinforcement (Fe-500/550D grade as per IS 1786-2008of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding other taxes and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
Collection, supply, stacking, spreading and compaction of gravel as per the directions of the Engineer-in-Charge, from approved quarry including cost and conveyance, of materials, seigniorage charges, stacking, spreading in layers, compacting with three wheeled static roller upto desired density, over head charges & contractors profit etc. complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQItemswb (3).xls
TENDER_DOCUMENT • 0.58 MB
Nit 57 SBD.doc
TENDER_DOCUMENT • 0.62 MB
Schedules- Kothakota Stadium-200L.xlsx
TENDER_DOCUMENT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .