Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance RANGAMATI LAUDOHA RANGAMATI BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance AT PO AMRAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL | AMRAI | BARDHAMAN | WEST BENGAL | 713203 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.3 L
EMD Value
₹24,200
Closing Date
13 Mar 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Dismantle of 1200mm dual drive complete unit at -35L/19R and transportation,installation including electricals at -3L/9R for starting 9R belt.
2023_ECL_273406_1
ECL/GM/JNR/EnM/e-TenderCell/ 22-23/017
Open Tender
Miscellaneous Works
Item Rate
21 days
JHANJRA UNDERGROUND
PLEASE REFER TO TENDER DOCUMENTS
4 documents required · 4 mandatory
₹24,200
14 Mar 2023
2 Mar 2023
14 Mar 2023
2 Mar 2023
13 Mar 2023
3 Mar 2023
2 Mar 2023 - 9 Mar 2023
Amount
Dismantling of 1200mm wide 2x150KW, 6.6KV, Dual Drive unit Complete with Drive Drum, Driven Drum, Gear Box, Motor, Coupling, Bearing Block etc. at- 35L/19R(12 MT), Dischage Unit Complete with Cleaner at -35L/20R(3MT), Loop take up unit at -35L/19R(3 MT), Tail-end Unit Complete at -35L/9R(1 MT), 80 meters of 1200mm belt structure at site(6.8 MT) and transportation and installation of the above said items to -3L/9R, transporting and placing of starter, VCBs,2 nos of transformers.cables(550V grade, 6.6 KV grade) and lockout, audio cables and devices for starting 9R belt and dismanting and removal of damaged structures of previously layed belt conveyor with the help of MUV at panel 27 of CM1 in MIC, JPC
Dismantling of 2 pillars (approx. 80 mtr. structures, 160 m approx belting) of -37L belt Conveyor (20R to 2 pillars),2x150KW,6.6 KV,Dual Drive unit Complete with Drive Drum,Driven Drum,Two Gear Boxes,Two Motors,Discharge Unit Complete with Cleaner, Loop take up unit, Tail-end Unit Complete with dust collector
Transportion and installation of the abovesaid drive head, discharge, löop take up in between -2L/9R to-4L/9R, tailend unit at -27L/9R with the help of MUV
Transportion and installation of 1200mm belting in between- 2L/9R to -9L/9R(6 pillars approx 384 metre) with the help of MUV
Transporting and fitting of bottom rollers of 9R Belt Conveyor(1200mm) with the help of MUV between -2L/9R and 9L/9R (transport by MUV and fitting manually)
Transportation of damaged structures between -9L/9R and- 24L/9R (transport by MUV), dismantling and transportation of Pipeline between-5Ldismantling manually
Supply of M30 X 140H.T. Hex. nut and bolt
Supply of M24 X 120 H.T. Hex. nut and bolt
Supply of M16X 65 H.T. Hex. nut and bolt
Supply of DA Cylinder
Supply of Oxygen Cylinder
Dismantling of damaged 15 pillars (approx.480 mtr.structures) previously layed belt Conveyor
Extension of 9R Belt Conveyor for a length of 480 metre from tail end which will be installed initially at 192 metre from 9R
Transportation and Installation of 480 mtr. of belt structure, after loading it on MUV
Transporting, laying, lapping & jointing of 960 mtr. of belting
Transportation, installation and grouting of tail end frame for 15 times shifting (05 Hds. for one time grouting and tail end to be grouted in every shifting)
Laying of pull cord and audio cable throughiut the belt line of 480 metres.Fittings of lock out and communication devices along the belt.
Shortening of loop take up unit by removing extra belt from loop take up unit.
Shortening of loop take up unit by removing extra belt from loop take up unit after every two times extension as there are 15 nos.of extension
Supply of M.S. Nut & Bolt (M16X40)(taking 16 nos.in 3 mtr. and 8 nos. in one Kg)
Total impact of GST for the purpose of CTC
K R ENTERPRISE
F.R. ENTERPRISE
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .