Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 CrAccepted-AOC C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.7 Cr+₹14.4 L (1.36%)Rejected-Finance 6 OM COMPLEX BHUJ BHACHAU BYPASS DABDA ROAD ANJAR KUTCH 370110 | ANJAR | KUTCH | GUJARAT | 370110 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | VELJI RATNA SORATHIA INFRA PVT. LTD L2 | Shri Krishna Construction Projects Pvt Ltd L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of canal with manual compaction and dressing below 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1,771.91 | cum | 150 ₹2,65,786.5 Lowest | 190 ₹3,36,662.9 |
| 2.00 | Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1,988.18 | cum | 150 ₹2,98,227 Lowest | 190 ₹3,77,754.2 |
| 3.00 | Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 2,687.94 | cum | 199 ₹5,34,900.06 Lowest | 200 ₹5,37,588 |
| 4.00 | Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material T&P etc. required for proper completion of work as per direction of Engineer in Charge. | 1,163.51 | cum | 148 ₹1,72,199.48 Lowest | 190 ₹2,21,066.9 |
| 5.00 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 2,423.44 | cum | 140 ₹3,39,281.6 Lowest | 141 ₹3,41,705.04 |
| 6.00 | Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 2,08,807.73 | cum | 140 ₹2,92,33,082.2 | 139 ₹2,90,24,274.47 Lowest |
| 7.00 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 1.00km including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 208.63 | cum | 140 ₹29,208.2 Lowest | 144 ₹30,042.72 |
| 8.00 | Site Clearence/Ordianry jungle clearance for layout and survey work at construction site including all leads and lifts, labour charges, T&P etc. and its disposal required for proper completion of work as per direction of Engineer-in-charge. | 6,959 | sqm | 20 ₹1,39,180 Lowest | 30 ₹2,08,770 |
| 9.10 | Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand mixed with Bajari, Kankar or Mooram including all lift and lead up to 90m and including filling watering, ramming of excavated earth into the trenches or upto the space and sides of foundation trenches including all leads and lifts, labour charges, T&P etc. and its removal and disposal of surplus earth required for proper completion of work as per direction of Engineer-in-charge. | 3,825.45 | cum | 240 ₹9,18,108 Lowest | 310 ₹11,85,889.5 |
| 9.20 | Earth work in excavation of foundation in soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 90m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 975.17 | cum | 300 ₹2,92,551 Lowest | 360 ₹3,51,061.2 |
Tender Value
Refer Docs
EMD Value
₹21.7 L
Closing Date
14 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E.K.C.C.2, Mirzapur
Office of Superintending Engineer, Kanhar Construction Circle-2, Mirzapur
Balance E/w and Pucca work at various chainage in Harpura Minor, Dhorpa Minor, Pakri Minor, Bome Minor and Jorukhad Minor, off-taking from Parent canal RKC.
2026_UPIDC_1166039_9
01/SE/2026-27
Open Tender
Civil Works
Item Wise
120 days
Duddhi Sonebhadra
Please refer Tender Documents.
2 documents required · 2 mandatory
₹2,360
₹21.7 L
12 Nov 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of canal with manual compaction and dressing below 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1,771.91 | cum | - | - |
| 2 | Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1,988.18 | cum | - | - |
| 3 | Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 2,687.94 | cum | - | - |
| 4 | Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material T&P etc. required for proper completion of work as per direction of Engineer in Charge. | 1,163.51 | cum | - | - |
| 5 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 2,423.44 | cum | - | - |
| 6 | Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 2,08,807.73 | cum | - | - |
| 7 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 1.00km including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 208.63 | cum | - | - |
| 8 | Site Clearence/Ordianry jungle clearance for layout and survey work at construction site including all leads and lifts, labour charges, T&P etc. and its disposal required for proper completion of work as per direction of Engineer-in-charge. | 6,959 | sqm | - | - |
| 9.1 | Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand mixed with Bajari, Kankar or Mooram including all lift and lead up to 90m and including filling watering, ramming of excavated earth into the trenches or upto the space and sides of foundation trenches including all leads and lifts, labour charges, T&P etc. and its removal and disposal of surplus earth required for proper completion of work as per direction of Engineer-in-charge. | 3,825.45 | cum | - | - |
| 9.2 | Earth work in excavation of foundation in soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 90m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 975.17 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tender_document_Lot_2.pdf
Tender Documents • 2.34 MB
BOQ_2208500.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .