| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.2 L+₹22,846.43 (5.80%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.3 L+₹35,330.99 (8.97%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SESHADIRI.T L2 | KRISHNAMOORTHY L1 | SUMATHI H L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. levelling the site etc completed | 28 | M3 | 120 ₹3,359.88 | 105 ₹2,939.89 Lowest | 250 ₹6,999.75 |
| 2.00 | Plain Cement Concrete 1:11/2:3 (one cement one and half sand and three aggregate) using 20mm gauge machine broken hard granite machine crushed metal from approved quarry to working site including cost of conveyance of all materials to working site and all labour charge for mixing, placing, compaction, finishing and curing by the direction of departmental engineers instruction etc, complete and as per standard Specifications. | 47 | M3 | 7,400 ₹3,47,825.9 | 7,000 ₹3,29,024.5 Lowest | 7,500 ₹3,52,526.25 |
| 3.00 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 28 | M3 | 70 ₹1,959.93 | 65 ₹1,819.93 Lowest | 150 ₹4,199.85 |
| 4.00 | GST 18% | 1 | Nos | 0.18 ₹63,566.23 | 0.18 ₹60,081.18 Lowest | 1 ₹65,470.65 |
Tender Value
₹4.4 L
EMD Value
₹4,400
Closing Date
8 Oct 2026, 3:00 pmClosed
COMMISSIONER CUDDALORE CORPORATION
CUDDALORE CORPORATION OFFICE, BHARATHI ROAD, CUDDALORE
CUDDALORE CORPORATION -Providing CC patch works at zone -3 areas in Cuddalore Corporation
2026_MAWS_707171_1
ROC.NO.2407/2026/E1
Open Tender
Civil Works
Works
30 days
WORK
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,400
Yes
9 Oct 2026
23 Sept 2026
8 Oct 2026
23 Sept 2026
8 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. levelling the site etc completed | 28 | M3 | - | - |
| 2 | Plain Cement Concrete 1:11/2:3 (one cement one and half sand and three aggregate) using 20mm gauge machine broken hard granite machine crushed metal from approved quarry to working site including cost of conveyance of all materials to working site and all labour charge for mixing, placing, compaction, finishing and curing by the direction of departmental engineers instruction etc, complete and as per standard Specifications. | 47 | M3 | - | - |
| 3 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 28 | M3 | - | - |
| 4 | GST 18% | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_849889.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .