Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-Finance D NO 17 143 APOLLO GARDEN MADANADAR KUDIERUPPU NEAR KUMARAPURAM JN TIRUNELVELI 627 133 | TIRUNELVELI | TAMIL NADU | 627133 | ₹4.3 L | L1 | Accepted-Finance Price bid approved |
| 2 | L2₹4.7 LAccepted-Finance 30 OPP ALOK PRESS GHATI BADBHUNJA CHAMELI ROAD BHOPAL BHOPAL MADHYA PRADESH 462001 UDYAM MP 10 0044621 | BHOPAL | MADHYA PRADESH | 462001 | ₹4.7 L | L2 | Accepted-Finance Price bid approved |
| 3 | L3₹4.7 LAccepted-Finance 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 8 | TUTICORIN | TAMIL NADU | 626202 | ₹4.7 L | L3 | Accepted-Finance Price bid approved |
| 4 | Not Admitted-Fee/PreQual/Technical NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | - | - | Not Admitted-Fee/PreQual/Technical Others-The firm have uploaded for work experience in construction circle against the BQR requirement of experience in any one of the 210 MW or above capacity Thermal Power Stations Hence BQR Not satisfied. |
| Sl No | Description | Qty | Unit | APOLLO TRANSFORMERS AND FILTERS L1 | R K ELECTRICALS L2 | KUMAAR ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for providing filter machine of capacity of 4500 ltrs per hour or above for oil filtration work, providing power supply connection, providing lighting arrangement After completion of filtration, disconnection of the power supply, removal of lighting arrangement. | 1 | Nos | 7,300 ₹8,614 | 7,650 ₹9,027 | 7,448 ₹8,788.64 |
| 2.00 | Charges for Vacuum pulling, Oil filling and hot oil circulation(main tank, radiators & combined circulation) up to reaching of parameters to the satisfactory level in GT-I R,Y,B phases, UST-I and UAT1A & UAT1B in Unit - I | 1,43,380 | Litres | 2,72,422 ₹3.2 L | 3,01,098 ₹3.6 L | 2,86,760 ₹3.4 L |
| 3.00 | Drawel of new transformer oil drum from stores & transporting to transformer location, Prehot oil circulation of newly drawn oil and devoluting of released oil drum to stores. | 40 | Nos | 42,240 ₹49,843.20 | 48,000 ₹56,640 | 42,000 ₹49,560 |
| 4.00 | Charges for Dismantling and erection of oil circulating pump in single phase Generator TransformerR Y & B phases in Unit-I: Closing of butterfly isolation valves for the oil pumps, providing dummy plates for the oil lines, Dismantling of oil pump unit by disconnecting the flanges from the pipe lines, cleaning the flange surfaces, preparing the gaskets for flanges, Removal of dummy plates before erecting the overhauled pump, erecting the oil pump unit with replacement of gaskets, Connecting the flanges by tightening, opening of butterfly isolation valves for the oil pumps, checking of oil leak and arresting if any(The gasket required will be supplied by the TNPGCL). | 12 | Nos | 16,320 ₹19,257.60 | 17,400 ₹20,532 | 16,800 ₹19,824 |
| 5.00 | Charges for carrying out overhauling of L.T Motors of capacity above 1.2 KW to 9.3 KW: Complete overhauling of 2.2 KW motor including dismantling, cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling. (The bearing required will be supplied by the Board) | 12 | Nos | 25,080 ₹29,594.40 | 26,400 ₹31,152 | 23,400 ₹27,612 |
| 6.00 | Cleaning, servicing and gasket replacement to Buchholz
relay, MOG, oil level gauge glass, explosion vent
pipe, conservator tank, silicagel & replacement of diaphram | 2 | Nos | 15,350 ₹18,113 | 16,200 ₹19,116 | 26,000 ₹30,680 |
| 7.00 | Dismantling of radiator from top & bottom headers in Generator Transformer R,Y & B Phases, renewal of all gaskets in the leaky radiator header valves,and re-erection radiator with the headers after completion of work | 6 | Nos | 49,500 ₹58,410 | 52,200 ₹61,596 | 69,000 ₹81,420 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
16 Feb 2026, 2:00 pmClosed
CE/TTPS
Chief Engineer / TTPS, Tuticorin
TTPS ES Circle EM I Hot oil circulation for improving the BDV value of Transformer oil in Generator Transformer R Y B phases UST I and UAT 1A and UAT 1B Dismantling over hauling and errection of 12 nos oil circulating pumps cleaning servicing and g
2026_EB_654524_1
CE/SE/ES/TTPS/No.229/2025-26
Open Tender
Electrical and Maintenance Works
40 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹5,000
Yes
19 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
Charges for providing filter machine of capacity of 4500 ltrs per hour or above for oil filtration work, providing power supply connection, providing lighting arrangement After completion of filtration, disconnection of the power supply, removal of lighting arrangement.
Charges for Vacuum pulling, Oil filling and hot oil circulation(main tank, radiators & combined circulation) up to reaching of parameters to the satisfactory level in GT-I R,Y,B phases, UST-I and UAT1A & UAT1B in Unit - I
Drawel of new transformer oil drum from stores & transporting to transformer location, Prehot oil circulation of newly drawn oil and devoluting of released oil drum to stores.
Charges for Dismantling and erection of oil circulating pump in single phase Generator TransformerR Y & B phases in Unit-I: Closing of butterfly isolation valves for the oil pumps, providing dummy plates for the oil lines, Dismantling of oil pump unit by disconnecting the flanges from the pipe lines, cleaning the flange surfaces, preparing the gaskets for flanges, Removal of dummy plates before erecting the overhauled pump, erecting the oil pump unit with replacement of gaskets, Connecting the flanges by tightening, opening of butterfly isolation valves for the oil pumps, checking of oil leak and arresting if any(The gasket required will be supplied by the TNPGCL).
Charges for carrying out overhauling of L.T Motors of capacity above 1.2 KW to 9.3 KW: Complete overhauling of 2.2 KW motor including dismantling, cleaning of the stator coils, checking the tightness of the stator wedges and applying one coat of insulating varnish, replacement of both DE and NDE bearings and assembling. (The bearing required will be supplied by the Board)
Cleaning, servicing and gasket replacement to Buchholz relay, MOG, oil level gauge glass, explosion vent pipe, conservator tank, silicagel & replacement of diaphram
Dismantling of radiator from top & bottom headers in Generator Transformer R,Y & B Phases, renewal of all gaskets in the leaky radiator header valves,and re-erection radiator with the headers after completion of work
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_784839.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid