Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.1 L+₹8,077.10 (2.02%)Rejected-Finance | ₹4.1 L+₹8,077.10 (2.02%) | L2 | Rejected-Finance 2 |
| 3 | L3₹4.1 L+₹8,289.50 (2.07%)Rejected-Finance | ₹4.1 L+₹8,289.50 (2.07%) | L3 | Rejected-Finance 3 |
| 4 | L4₹4.2 L+₹22,815.30 (5.70%)Rejected-Finance D NO 6 41 SREE THIRUMALAI ILLAM UPPER BAZAAR OOTY | ERODE | TAMIL NADU | 638451 | ₹4.2 L+₹22,815.30 (5.70%) | L4 | Rejected-Finance 4 |
| 5 | L5₹4.3 L+₹30,637.52 (7.66%)Rejected-Finance D NO 7 267 YELLANALLI KETTI PO | DHARMAPURI | TAMIL NADU | 635106 | ₹4.3 L+₹30,637.52 (7.66%) | L5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | dhamodharan L5 | MPANDCO L6 | ravi L4 | ANBUMANI L3 | JAYA TRADERS L2 | SRI LAKSHMI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing CC Pavement at Agan Nagar 6th street in Perumchi Panhayat (75m) | |||||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 8.04 | cum | 263.78 ₹2,121 | 131.89 ₹1,060 | 130 ₹1,045 | 131.89 ₹1,060 | 129 ₹1,037 Lowest | 263.78 ₹2,121 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 26.06 | cum | 5,818.53 ₹1,51,631 | 5,818.53 ₹1,51,631 | 5,800 ₹1,51,148 | 5,280 ₹1,37,597 Lowest | 5,500 ₹1,43,330 | 5,818.53 ₹1,51,631 |
| 4.00 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | 90.45 | M2 | 182.5 ₹16,507 | 210 ₹18,995 | 178 ₹16,100 | 140 ₹12,663 Lowest | 159 ₹14,382 | 182.5 ₹16,507 |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 9.25 | cum | 6,571.17 ₹60,783 | 7,800 ₹72,150 | 6,300 ₹58,275 | 6,571.17 ₹60,783 | 5,900 ₹54,575 | 5,800 ₹53,650 Lowest |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 18.84 | cum | 7,114.35 ₹1,34,061 | 7,114.35 ₹1,34,061 | 7,000 ₹1,31,906 | 7,114.35 ₹1,34,061 | 7,040 ₹1,32,660 | 6,115 ₹1,15,230 Lowest |
| 7.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 65,718.54 ₹65,718.54 | 68,021.46 ₹68,021.46 | 64,525.32 ₹64,525.32 | 62,309.52 ₹62,309.52 | 62,277.12 ₹62,277.12 | 61,045.02 ₹61,045.02 Lowest |
Tender Value
₹4.4 L
EMD Value
₹4,380
Closing Date
26 Feb 2026, 3:00 pmClosed
BDO VP AKM
Panchayat Union Arakkonam
Providing CC Pavement at Agan Nagar 6th street in Perumchi Panhayat (75m)
2026_RDTN_666111_1
AA1/2826/2025
Open Tender
Civil Works
Item Rate
180 days
Panchayat Union Arakkonam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,380
Yes
18 Aug 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
26 Feb 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing CC Pavement at Agan Nagar 6th street in Perumchi Panhayat (75m) | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 8.04 | cum | 131.89 | ₹1,060.4 |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 26.06 | cum | 5,818.53 | ₹1,51,630.89 |
| 4 | Supply and errecton of sheet centring with out scupolding including all charges etc completed. | 90.45 | M2 | 182.5 | ₹16,507.13 |
| 5 | Cement Concrete 1:3:6 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 9.25 | cum | 6,571.17 | ₹60,783.32 |
| 6 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 18.84 | cum | 7,114.35 | ₹1,34,061.03 |
| 7 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.25 MB
BOQ_800111.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .