Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.1 LAdmitted-Finance | +9.89% | ₹22.1 L | L1 | Admitted-Finance |
Tender Value
₹20.1 L
EMD Value
₹40,240
Closing Date
18 Aug 2026, 6:00 pmClosed
ADPC SMSA OFFICE BANSWARA
ADPC SMSA OFFICE BANSWARA
Remaining Construction works of Building for buildingless PS (UNDER PAB 2018-19) AT GPS Chhapriya Pada, Block-Choti Sarwan, District - Banswara (Raj.)
2026_RCSCE_585546_1
NIT 07 (Civil)/2026-27
Open Tender
Civil Works
Percentage
180 days
Choti Sarwan
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
DPC SAMAGRA SHIKSHA BANSWARA/MD RISL JAIPUR
₹40,240
20 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A :- Civil work (PWD BSR 2015 Banswara Circle) | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out t | - | Cum | 105 | - |
| 1.02 | P.C.C. IN FOUNDATION Providing and laying in position cement concrete including curing compaction etc. complete in spcified grade excluding the cost of centering and shuttering all work upto plinth level 1:4:8(1 cement:4 Coarse sand :8 gradeed stone aggre | - | Cum | 2,964 | - |
| 1.03 | Random Rubble stone masonry for foundation and plinth in Cement Sand mortar above 30 CM thick wall in cement mortat 1:6 (1-Cement: 6- Sand) | - | Cum | 1,925 | - |
| 1.04 | DPC:-Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joint | - | Cum | 4,877 | - |
| 1.05 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and | - | Cum | 4,877 | - |
| 1.06 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and | - | Cum | 5,081 | - |
| 1.07 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, ba | - | Sqm | 104 | - |
| 1.08 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for :Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, ba | - | Cum | 195 | - |
| 1.09 | Filling - Supply & stacking good earth at site complete including loading loading unloading & transporation etc. | - | Cum | 185 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.32 MB
Term.pdf
Tender Documents • 3.49 MB
BOQ_1040192.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .