Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.3 LAccepted-AOC PASUMALAITHANGAL GINGEE VILUPPURAM | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹33.4 L+₹7,904 (0.24%)Rejected-AOC COIMBATORE | L2 | Rejected-AOC REJECT |
| Sl No | Description | Qty | Unit | R SELVARAJ L1 | S RAJATHI L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift - 10 m | 142 | M3 | 220 ₹31,240 Lowest | 220 ₹31,240 Lowest |
| 2.00 | Plain cement concrete 1:4:8 mix (One cement four M.Sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying,consolidating, curing, cost and conveyance of all materials to site and all labour charges etc.,complete as per standard specification - 1 m3 | 81 | M3 | 5,950 ₹4,81,950 Lowest | 5,962 ₹4,82,922 |
| 3.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with 270.30 M21 angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet) . | 30 | M2 | 530 ₹15,900 Lowest | 534 ₹16,020 |
| 4.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour charges for cutting, bending & tying etc., complying with standard specifications - 1 Quintal | 137 | Qtl | 9,520 ₹13,04,240 Lowest | 9,542 ₹13,07,254 |
| 5.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 152 | M3 | 9,720 ₹14,77,440 Lowest | 9,744 ₹14,81,088 |
| 6.00 | Stucco Plastering 12 mm thick using blue granite chips of size 10 mm and below over a base plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)), 12mm thick,including cost and conveyance of all materials to site etc,complete as per standard specification. | 30 | m2 | 690 ₹20,700 Lowest | 695 ₹20,850 |
Tender Value
₹40 L
EMD Value
₹40,000
Closing Date
11 Nov 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Providing RCC Flooring at RVL Colony Channel in ward no. 60, East Zone, Coimbatore Corporation.
2025_MAWS_617649_3
e53/2025- Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
AS PER THE TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹40,000
18 Mar 2026
28 Oct 2025
12 Nov 2025
28 Oct 2025
11 Nov 2025
28 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
RCC.pdf
Tender Documents • 1.23 MB
BOQ_738457.xls
BOQ • 0.26 MB
ITB.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .