Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Rate quoted by the firm is found lowest |
| 2 | L2₹1.1 Cr+₹1.0 L (0.93%)Rejected-Finance | ₹1.1 Cr+₹1.0 L (0.93%) | L2 | Rejected-Finance Rejected due to high quoted amount |
| 3 | L3₹1.1 Cr+₹4.5 L (4.13%)Rejected-Finance | ₹1.1 Cr+₹4.5 L (4.13%) | L3 | Rejected-Finance Rejected due to high quoted amount |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical PREET BANQUET PALACE BYE PASS ROAD CHANNI RAMMA JAMMU JAMMU KASHMIR 180012 | JAMMU | JAMMU AND KASHMIR | 180012 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
18 Feb 2020, 2:00 pmClosed
COL MANOJ PANT
55 ENGINEER REGIMENT, PIN 914055, C/O 56 APO
PROVN OF SOLAR ELECTRIFICATION PROJ 02 NOS JOB NO 8983
2020_ARMY_324401_1
6400/QTN/56/OPW
Open Tender
Civil Works
Item Rate
35 days
55 ENGINEER REGIMENT, C/O 56 APO
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.2 L
22 Dec 2020
12 Feb 2020
19 Feb 2020
12 Feb 2020
18 Feb 2020
13 Feb 2020
SOLAR MODULE HIGH EFFICENCY MONO CRYSTALLINE MODULE 380 TO 410 WP (TOTAL 35 KWP) MAKE - ADANI/TATA/SATVIK/RENEYSIS) all as per technical specification and stores mentioned at Ser No 1 of Part-II of RFP.
MODULE MOUNTING STRUCTURE all as per technical specification and stores mentioned at Ser No 2 of Part-II of RFP.
SOLAR INVERTER – 40KW 3 PHASE MAKE – STATCON ENERGIAA/CONSUL NEW WATT/ OPTIMAL all as per technical specification and stores mentioned at Ser No 3 of Part-II of RFP.
2 VOLT 600 AH CELL FOR SOLAR APPLICATION – LMLA/MAKE – EXIDE/HBL/AMARAJA BATTERIES all as per technical specification and stores mentioned at Ser No 4 of Part-II of RFP.
ARRAY JUNCTION BOX – MAKE- SUNNERGY SYSTEMS/ GREEN SOL/AG ENTERPRISES all as per technical specification and stores mentioned at Ser No 5 of Part-II of RFP.
AC DISTRIBUTION BOX – MAKE- SUNNERGY SYSTEMS/ GREEN SOL /AG ENTERPRISES all as per technical specification and stores mentioned at Ser No 6 of Part-II of RFP.
FOLLOWING CABLES – MAKE- POLYCAB/HAVELLS/LEONI/FINOLEX all as per technical specification and stores mentioned at Ser No 7 of Part-II of RFP.:- (a) COPPER CABLE SINGLE CORE 6 SQMM
(b) COPPER CABLE SINGLE CORE 50 SQMM
(c) COPPER CABLE TWO CORE 25 SQMM
(d) ALUMINIUM ARMOURD CABLE 3.5 CORE 25 SQMM
(e) COPPER CABLE SINGLE CORE 25 SQMM
EARTHING – MAKE – GS ELECTRODE/ SABO all as per technical specification and stores mentioned at Ser No 8 of Part-II of RFP.
LIGHTENING ARRESTER - GS ELECTRODE / SABO all as per technical specification and stores mentioned at Ser No 9 of Part-II of RFP.
MC 4 CONNECTORS – MAKE – TYCO/REE/NBJH/ELCOM
25 Sqmm 3.5 Core Aluminium Armoured Cable Make: Havells/Polycab
DESIGNING,INSTALLATION AND COMMISSIONING
SHELTER 6X6M all as per Tech Specifications& Store list mentioned in Part-II of RFP.
PALLAVI ASSOCIATES
M/S SUNNERGY SYSTEMS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .