Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-Finance | ₹3.6 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹3.6 Cr+₹90,677.99 (0.25%)Rejected-Finance PUNE | MAHARASHTRA | 410301 | ₹3.6 Cr+₹90,677.99 (0.25%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.7 Cr+₹14.1 L (3.94%)Rejected-Finance | ₹3.7 Cr+₹14.1 L (3.94%) | L3 | Rejected-Finance L3 |
Tender Value
₹3.6 Cr
EMD Value
₹3.6 L
Closing Date
15 Jun 2026, 6:00 pmClosed
EE RWS ZP KOLHAPUR
CEO ZP KOLAHPUR
Conservation and Beautification of lake at Gadmudshingi Tal Karveer District Kolhapur
2026_KOLHA_1304604_1
03/2026-27
Open Tender
Civil Works - Water Works
Percentage
545 days
KOLHAPUR
Sepretly attache
2 documents required · 2 mandatory
₹68,600
₹3.6 L
22 Jul 2026
21 May 2026
16 Jun 2026
21 May 2026
15 Jun 2026
21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub-work No. 1 - Desilting (Dry & Wet)
Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material up to a distance of 50 metres beyond the building area and stacking as directed ,including dewatering, preparing the bed for the foundation and necessary back filling with a vailable earth / murum, ramming, watering including shoring and strutting etc. complete (lift upto 1.5m) By Mechanical Means | 301.3 | Cum | 471.9 | ₹1,42,183.14 |
| 2 | Excavation for foundation in Hard-rock by controlled blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres. from the building area including dewatering and backfilling with available earth soil / murum watering, ramming etc. complete. (Lift upto 1.5m) By Mechanical Means | 301.3 | Cum | 1,454.2 | ₹4,38,149.44 |
| 3 | Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 10.0 to 19.0 BHP pump etc. complete. ( prior approval of Super intending Engineer will be necessary) | 3,377.09 | Bhp/Hr | 245.3 | ₹8,28,399.69 |
| 4 | Desilting the Lake in wet or dry condition excluding Conveying materials obtained from Lake beyond the work site, stacking, spreading, etc. complete | 10,043.31 | Cum | 31 | ₹3,11,342.61 |
| 5 | Conveying materials obtained from Lake including all lifts, laying in layers of 20 cm. to 30 cm. breaking clods, dressing to the required lines, curves, grade sand section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500 m. inclusive, from the site of excavation to the site of deposition as directed. 30 % to Farm | 3,012.99 | Cum | 35.75 | ₹1,07,714.5 |
| 6 | 70 % to Dump Yard | 7,030.32 | Cum | 432.3 | ₹30,39,206.04 |
| 7 | Sub Work No. 2 - Cleaning & Removing Aquatic Weed Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and a like grass along roadside making the ground clean by showel and phavaras etc. complete. | 8,161.85 | Sqm | 7.7 | ₹62,846.25 |
| 8 | Sub Work No. 3 - Phytoride Technology Cleaning the Site | 1 | LS | 46,121 | ₹46,121 |
| 9 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5 M | 639 | Cum | 181.5 | ₹1,15,978.5 |
| 10 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material up to a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd- A-2/259) | 280 | Cum | 205.7 | ₹57,596 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.02 MB
NIT.pdf
Tender Documents • 3.00 MB
SBD.pdf
Other Document • 1.13 MB
PQ.pdf
Additional Documents • 0.44 MB
BOQ_2239599.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .