Loading…
Loading…
Tender Value
₹3.5 L
EMD Value
₹7,024
Closing Date
30 Sept 2026, 4:00 pmDue tomorrow
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
C/OPROTECTION BUND NEAR LAND OF MOHAMMAD SUBHAN LONE AT KHOPRI
2026_RDPR_325978_4
NIT97
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Rural Development and Panchayati Raj
₹7,024
25 Sept 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | GENERAL SITE CLEARANCE BY THE WAY OF ENGAGEMENT OF LABOURS FOR CUTTING OF SHRUBS REMOVAL OF WEEDS CUTTING OF TREES ETC. | 5 | NO | 503 | ₹2,515 |
| 2 | EARTH WORK IN EXCAVATIONS IN TRENCHES / DRAINS NOT EXCEEDING 1.5 MTR IN WIDTH AS WELL AS 10 SQM ON PLAIN INCLD LIFT UPTO 1.5 MTR IN :
1) ROCKY SOIL 40 PERCENT | 13.6 | Cum | 924 | ₹12,566.4 |
| 3 | EARTH WORK IN EXCAVATIONS IN TRENCHES / DRAINS NOT EXCEEDING 1.5 MTR IN WIDTH AS WELL AS 10 SQM ON PLAIN INCLD LIFT UPTO 1.5 MTR IN :
1) ORDINARY SOIL 60 PERCENT | 20.4 | Cum | 479.3 | ₹9,777.72 |
| 4 | PROVIDING AND LAYING OF STONE SOLING INCLUDING LAYING PITCHING TIGHTELY COMPACTING | 7.22 | Cum | 1,204 | ₹8,692.88 |
| 5 | PROVIDING AND LAYING OF C DONCRETE OF SPECIFIED GRADE OF M10 EXCLD COST OF CENTRING AND SHUTTERING BY USING 40 MM N/S AGG:
1) PROTECTION BUND TOP AND BASE:- | 7.08 | CUM | 5,733.6 | ₹40,593.89 |
| 6 | II) PROTECTION BUND IN 70 PERCENT DRYWITH HARD STONE QUANTITY AVAILIABLE REQUIRES BREAKING SPLITTING AND LABOUR ONLY :- | 97 | NO | 503 | ₹48,791 |
| 7 | II) PROTECTION BUND IN 70 PERCENT DRYWITH HARD STONE QUANTITY AVAILIABLE REQUIRES BREAKING SPLITTING AND LABOUR ONLY :- SKILLED | 48 | NO | 600 | ₹28,800 |
| 8 | III) PROTECTION BUND IN 30 PERCENT CEMENT MIX 1:6 | 19.16 | CUM | 7,677 | ₹1,47,091.32 |
| 9 | HEAD LOAD OF MATERIAL WITH AN AVERAGE LEAD OF 100 METRE TO BE PAID AS PER ACTUAL :-
1)SAND AGGREGATE | 9.48 | CUM | 216.94 | ₹2,056.81 |
| 10 | 2)CEMENT | 1.56 | MT | 116.22 | ₹180.95 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_1102070.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .