Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.4 Cr Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | ₹33.4 Cr | L1 | - |
| 2 | L2₹34.8 Cr Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | ₹34.8 Cr | L2 | - |
| 3 | L3₹35.1 Cr Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | ₹35.1 Cr | L3 | - |
| 4 | L4₹35.5 CrFinancial bid opened Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | ₹35.5 Cr | L4 | Financial bid opened |
| 5 | L5₹36.5 Cr Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). | ₹36.5 Cr | L5 | - |
| Sl No | Description | Qty | Unit | HV AIRCONDITIONING SYSTEMS PVT LTD L7 | KAMLADITYYA CONSTRUCTION PVT LTD L6 | trading engineers L1 | RSC INFRATECH DEVELOPERS LLP L3 | SPS INFRABUILD PVT. LTD. L5 | KARTIK CONSTRUCTION COMPANY L4 | M/S VIJAY CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -18.99 ₹32.9 Cr | -18.89 ₹32.9 Cr | -29.54 ₹28.6 Cr | -26 ₹30.0 Cr | -22.27 ₹31.5 Cr | -25.2 ₹30.4 Cr | -26.51 ₹29.8 Cr |
| 2 | Electrical Work | - | - | -10.26 ₹5.8 Cr | -18.89 ₹5.2 Cr | -29.54 ₹4.5 Cr | -26 ₹4.8 Cr | -26.27 ₹4.7 Cr | -25.2 ₹4.8 Cr | -26.51 ₹4.7 Cr |
| 3 | Horticulture | - | - | -9 ₹34.7 L | -18.89 ₹30.9 L | -29.54 ₹26.8 L | -26 ₹28.2 L | -32.27 ₹25.8 L | -25.2 ₹28.5 L | -26.51 ₹28.0 L |
Tender Value
₹47.4 Cr
EMD Value
₹57.4 L
Closing Date
24 Aug 2022, 3:00 pmClosed
EE-Bhopal-II
Sarvesh Tiwari
8298216262
201, Nirman Sadan, 52-A Arera Hills, Bhopal 462011
Construction of various buildings (1) Science laboratory Complex with three Lecture hall (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.). Subwork/Packages: Construction of various buildings (1) Science laboratory Complex with three Lecture halls (G plus 2) (2) Extension of existing library building (G plus 1), (3) Extension of Pharmacy Department (G plus 2), (4) Extension of MBA Department (G plus 1), (5) Extension of existing English Department (G plus 1) and (6) Integrated building for criminology and forensic Science, Fine and performing Arts Department and Library information science (G plus 1) at Dr. Hari Singh Gour University, Sagar (M.P.).
15154
19/EE-II/Bhopal/2022-23
OPEN
Civil Works - Buildings
18 months
Sagar, Madhya Pradesh
8 documents required · 8 mandatory
₹57.4 L
Not Applicable
3 Aug 2022
3 Aug 2022
24 Aug 2022
24 Aug 2022
10 Aug 2022
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
PartA.pdf
document • 0.30 MB
CorrectionSlip.pdf
document • 20.15 MB
PartB.pdf
document • 0.50 MB
CivilSchedule.pdf
document • 0.18 MB
PartC.pdf
document • 0.34 MB
ElectricalSchedule.pdf
document • 0.15 MB
PartD.pdf
document • 0.09 MB
HortSchedule.pdf
document • 0.06 MB
DrawingP226.pdf
document • 0.14 MB
SOQProforma.pdf
document • 0.04 MB
CoverABCD.pdf
document • 0.04 MB
NITcover.pdf
document • 0.39 MB
Download all tender documents and submit your bid