Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 LAccepted-AOC 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L1 | Accepted-AOC LOWEST AND ACCEPTED | |
| 2 | L2₹20.5 L+₹24,840 (1.23%)Rejected-AOC PATRA MARKET KRISHANAGAR NADIA | KRISHANAGAR | NADIA | L2 | Rejected-AOC GREATER THAN L1 | |
| 3 | L3₹20.5 L+₹29,060 (1.44%)Rejected-Finance A M BASU ROAD DESHBANDHUHARA SILIGURI 734 004 | SILIGURI | DARJEELING | WEST BENGAL | 734004 | L3 | Rejected-Finance GREATER THAN L1 AND STANDS L3 | |
| 4 | Rejected-Technical 122 PURBAPUTIARY BISHNUPALLY PURBAPUTIARY KOLKATA WEST BENGAL 700093 | 24 PARAGANAS SOUTH | WEST BENGAL | 700093 | - | Rejected-Technical 1. Irrelevant Credentials 2.Non submission of Electrical License and Electrical Supervisor License 3. Affidavit and Pre-qualification application missing NIET No. |
Tender Value
₹20.5 L
EMD Value
₹41,091
Closing Date
7 Sept 2020, 2:00 pmClosed
Executive Engineer, NMD, PHE DTE.
Office of the Executive Engineer, Northern Mechanical Division Public Health Engineering Directorate Sukanta Sarani, Paresh Nagar, Savoke Road, Siliguri - 734001, District- Jalpaiguri
Round the clock Operation, maintenance Guarding of Pumping machineries, Sub-station (500KVA) and other Electrical accessories and allied works at GROUND LEVEL RESERVOIR-II, under Siliguri comprehensive WS scheme, under Northern Mechanical Division,
2020_PHED_293199_1
WBPHED/EE/NMD/NIeT- 15 OF 2020-2021
Open Tender
Miscellaneous Works
Item Rate
365 days
SILIGURI COMPREHENSIVE WS SCHEME, SILIGURI
Please refer Tender documents.
5 documents required · 5 mandatory
₹41,091
Yes
30 Sept 2020
18 Aug 2020
9 Sept 2020
19 Aug 2020
7 Sept 2020
19 Aug 2020
Amount
PART-A
Daily labour charges with bonus(Once in a year), for operation, upkeepment & guarding of 03 (Three) nos, 90 KW V.T. Pumping machinery (2W+1S) and operation of Chlorination system, valves, compound lighting arrangement & all accessories and ancillaries including supply of lubricants & sundry materials by engaging skilled, semi-skilled and un-skilled workers round the clock (three shift of operation) including up-keepment of entire installation along with ssweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitationat Pumping Station as per direction of the EIC. w.e.f 01.10.2020 to 30.09.2021
Daily operation& upkeepment of 500 KVA Sub-Station ( 11 x 0.433 KV ) having 01 (one) no Transformer, LBS Panels, P.T., L.T. Panels etc. Complete and all other electrical accessories and ancillaries as per instruction and satisfaction of EIC during working hours daily including checking of healthy condition of all draw out feeders daily by Electrician having valid and appropriate License (Worksman permit), issued by Directorate of Electricity (Licensing Board), Govt. of W.B. or of any other state Govt. of India or by person having ITI (Electrician) Certificate & finding to be recorded in the log Book and switching ON/OFF of the Indoor and outdoor Luminaries & other accessories as & when required & sweeping of the sub-station building complex on daily basis. w.e.f 01.10.2020 to 30.09.2021
PART-B
Periodical Inspection, thrice in a month , Electrician Supervisor having valid supervisors'certificate of competency from Directorate of Electricity (Licensing Board), Govt. of W.B. or of any other state Govt. of India along with pump Technician/Supervisor. Each Visit should be recorded in the log Book (with date & time) to be supplied by the Agency and kept in the pump house & sub-station Building. The supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy/fault free operational condition of each equipment i.e. VCBs, transformers, L.T., PDB, capacitors, Battery & battery charges along with in house lighting system. w.e.f 01.10.2020 to 30.09.2021
Cleaning of contacts twice in a month by CRC 226 SPRAY in the HT & LT Panel Board, cleaning of all Terminal Sockets, Coils once in a month in presence of Electrical Supervisor / Electrician and to be recorded in the Log Book with date including supply of new gland packing, fuses, cotton waste, indicating lamps etc. w.e.f 01.10.2020 to 30.09.2021
Servicing, testing and calibration complete (Such as Voltmeter, Ammeter, Kilowatt meter, earthing arrangement system, power cable) by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit) with submission of report (in duplicate) in compliance with the guide line as per specification for the ACBS, checking complete wiring, testing CTs, PTs, Relay testing and calibration, insulation to be checked once in half yearly.
Tarun Kumar Bhattacharya
CHOWDHURY AND BASU ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .